首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
ABSTRACT: The “principles and standards for planning water and related land resources” were made effective October 25, 1973. The document was noticeably deficient in suggestions for the necessary implementing procedures to ensure its success. Current implementing procedures are based on an incorrect premise of maximizing a single objective subject to non-quantified constraints. A successful implementation of multiple objective planning requires optimizing simultaneously several competitive goals. A system of goal programming has been developed and applied to decisionmaking situations as a test of its usefulness in planning for multiple objective water resources projects. The result is a project planning process which can be replicated for adjustments in expected resource supplies or demands to provide a tradeoff matrix between economic and environmental objectives as well as traditional functional purposes. This procedure, tested on the Cross Florida Barge Canal, is an integrated analysis of economic and environmental values which may be as effective in implementing multiple objective planning as the “Green Book” was in developing the now inappropriate benefit cost analysis.  相似文献   

2.
ABSTRACT: Six new techniques have been developed for lake watershed analysis and water resource management. The techniques are for determining: (1) watershed land use intensity with reference to water quality, (2) lake vulnerability, (3) water quality, (4) watershed carrying capacity, (5) the economic value of the lake, and (6) the potential of undeveloped lake-shore. These analyses are designed for use by rural planning commissions with guidance and assistance from state agencies and the state university. The comprehensive rural watershed land and water use plan developed by this procedure is inexpensive in time and money, understandable by the layman, and scientificially sound. It is based on presently available information. This water resource planning procedure has been demonstrated in several town planning projects. It is suggested that this method, or modification of it, could be adopted in all rural states by action by a few administrators and without any new enabling or appropriations legislation.  相似文献   

3.
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.  相似文献   

4.
As freshwater resources become more scarce and water management becomes more contentious, new planning approaches are essential to maintain ecologic, economic, and social stability. One technique involves cooperative modeling in which scientists and stakeholders work together to develop a computer simulation model to assist in planning efforts. In the Middle Rio Grande region of New Mexico, where water management is hotly debated, a stakeholder team used a system dynamics approach to create a computer simulation model to facilitate producing a regional plan. While the model itself continues to be valuable, the process for creating the model was also valuable in helping stakeholders jointly develop understanding of and approaches to addressing complex issues. In this paper, the authors document results from post‐project interviews designed to identify strengths and weaknesses of cooperative modeling; to determine if and how the model facilitated the planning process; and to solicit advice for others considering model aided planning. Modeling team members revealed that cooperative modeling did facilitate water planning. Interviewees suggested that other groups try to reach consensus on a guiding vision or philosophy for their project and recognize that cooperative modeling is time intensive. The authors also note that using cooperative modeling as a tool to build bridges between science and the public requires consistent communication about both the process and the product.  相似文献   

5.
史小栋  操昌碧  朱永刚  尹嫚 《四川环境》2010,29(4):78-79,105
竣工验收是开发建设项目总结经验、提高认识、促进发展的重要环节。本文通过收集资料和现场查勘,提出水土保持竣工验收的具体内容和方法,对输电线建设项目水土保持设施竣工验收工作中遇到的问题进行了探讨。结果表明,输电线建设项目实际施工过程中存在一定的设计变更问题,水土保持措施实施情况与可研方案报告书中提出的水土保持措施有一定的差异,主要体现在植物措施和施工临时措施方面。  相似文献   

6.
Borrowing from concepts of socio-environmental epidemiology and psychology, we conceived self-rated health as a function of multiple physical and psychosocial stressors and resources at the residential neighbourhood and individual level. In this model of multiple stressors, objective exposure to road traffic noise was specified as a physical stressor whose effect on health may be mediated and modified by residents’ subjective response to noise (serious noise annoyance). Self-reported hearing disability, recreational coping in green areas and residential neighbourhood satisfaction were examined as additional psychosocial stressors or resources, independently of socio-demographic and -economic factors. Results from our empirical analysis based on two studies and multivariable logistic regressions might support the idea that environmental planning should overcome sectoral boundaries and adopt an integrative approach including objective exposures, residents’ subjective responses, and perceived resources.  相似文献   

7.
The planning of facilities to improve the environment is often carried through in the form of locally based construction projects. These projects can be complex, involving a variety of issues and a number of different actors from both the public and private sectors. By drawing on previous research on project planning, an analytical model for analysing the issues connected with the planning and implementation of environmental projects is developed. The main argument of the paper is the importance of considering how context-specific factors affect project design and project management. The empirical material is taken from the planning of two biogas projects in Sweden and it is showed how differences in factors such as the actors involved, the organisational framework and the political setting lead to two markedly distinct planning approaches. The results of the paper, which also highlight the importance of a flexible planning approach, are relevant not only for biogas but also for other projects with similar characteristics.  相似文献   

8.
本文主要对《重点流域水生态环境保护"十四五"规划编制技术大纲》进行解读,在梳理当前我国流域水生态环境保护现状、问题以及形势的基础上,分析了重点流域水生态环境保护"十四五"规划的定位,介绍了规划编制的总体思路以及目标制定、问题和症结分析、规划任务设计和项目筛选等重点环节,并对做好规划编制工作提出了相关建议。  相似文献   

9.
This study aims at describing, analyzing and evaluating the relation between management styles and process dynamics of a complex planning process confronted with unexpected dynamics. The development of an aquatic disposal site for dredged contaminated sediments in Oslo was managed by a project management style focused on timely and cost-effective implementation. Coupling the remediation project with another infrastructural project and the actual construction of the site led to unexpected dynamics in terms of resistance and controversy. Project management had difficulties in adjusting its style accordingly, resulting in even more delay and resistance. Managing complex planning projects requires a style suitable to the characteristics of the project and the capability of adjusting it to changing circumstances. The paper concludes with some explanations why it is difficult to change management styles in complex planning and implementation processes and complexity-embracing approaches to deal with this.  相似文献   

10.
ABSTRACT. The Texas Water Development Board, the principal water resource planning agency of the State, has been conducting extensive estuarine data collection activities and associated research to determine the required quantity and quality of fresh water inflows necessary to maintain various environmental conditions in Texas estuaries to preserve the estuarine ecosystems. These activities are a consequence of a statutory directive to the Board to make provisions in its State Water Plan for the effects of upstream water resource development on the associated estuaries. This paper reports on the results of the first phase of an extensive estuarine research project. The objectives of the research project are to (1) define the interrelationships between estuarine ecosystems and fresh water and nutrient inflows, and (2) develop and test quantitative simulation techniques which describe these relationships. In order to accomplish the first objective, physical and chemical water quality data and biological data on the estuarine ecosystems are being collected, compiled and analyzed. The second objective is being satisfied by the development of hydrodynamic and ecologic simulation models of the estuarine environment.  相似文献   

11.
ABSTRACT: The 15 federal-state interagency river basin studies (designated as Type 2 or Level B in the planning program of the Water Resources Council) of the 1960's brought together in each of the study regions, in many cases for the fist time, state and federal water resources agencies, and afforded an opportunity for coordination. Examination of the studies, however, reveals that many organizational problems remain to be solved in preparing truly comprehensive plans that effectively integrate and balance the diverse values held by study participants and concerned citizens. Burgeoning changes in state and federal laws, in planning concepts, and in public attitudes influenced the studies. Increased interest in the environment and greater emphasis on a multiple objective approach to planning for example, had significant effect. The type of organization used for carrying out these studies was a coordinating committee with one of the agencies - in most cases, the Corps of Engineers, - serving as lead agency. Some of the observed weaknesses of this arrangement were the lack of an effective mechanism for screening individual agency project proposals; unbalanced participation of agencies - for example, construction vs. non-construction, state vs. federal; agency representatives without sufficient delegated authority; insufficient control of the planning organization over individual agency participation and punctuality; and lack of emphasis on plan formulation and public participation. Suggested improvements, some of which are already being implemented in more recent studies include centralized planning staff and funding, formalized work agreements, a dynamic and continuous planning process with mechanisms for monitoring technological and social changes and evaluating planning effectiveness, planning guidelines and evaluative criteria, and a formalized training program for planners.  相似文献   

12.
This article investigates the determinants of plan implementation by applying a recently‐developed Plan Implementation Evaluation methodology. The lack of methodology to assess the implementation of plans has so far precluded any systematic analysis of the determinants of the implementation of local environmental plans. The article focuses on the implementation of plans in New Zealand. The key factors of implementation are: the quality of the plan; the capacity and commitment of land developers to implement plans; the capacity and commitment of the staff and leadership of planning agencies to implement plans; and the interactions between developers and the agency. The analysis is based on 353 permits implementing six local environmental plans in New Zealand, and on surveys of the developers who obtained the permits and of the planning agencies that granted the permits. The analysis finds that plan implementation is mainly driven by the resources of the planning agencies and by the quality of the plans, rather than by the characteristics of developers. Investments in plan writing and agency and staff capacity building thus improve the implementation of plans in the long‐run.  相似文献   

13.
ABSTRACT: Water resource development has progressed to the stage where various human factors are now being considered in reservoir design and operation. The introduction of human factor objectives complicates the problem since they are noncommensurate with other objectives and they are difficult to identify quantitatively. Some of the problems that now arise concern the proper methods for consideration of several different, sometimes subjectively identified, objectives in reservoir planning. The classical systems analysis approach to decision making for multiple objective problems is outlined and the inherent difficulties associated with multiple objectives and subjective estimates are identified. Techniques being used in reservoir design and operation are reviewed and discussed. An alternate technique for considering noncommensurate, subjectively identified, objectives, which relates the objectives in terms of real trade-off costs and eliminates the need for a priori estimates of objective worth is then presented. The method is illustrated with three examples, including a reservoir operation problem and a cooling tower design problem.  相似文献   

14.
Some countries, including Taiwan, have adopted strategic environmental assessment (SEA) to assess and modify proposed policies, plans, and programs (PPPs) in the planning phase for pursuing sustainable development. However, there were only some sketchy steps focusing on policy assessment in the system of Taiwan. This study aims to develop a methodology for SEA in Taiwan to enhance the effectiveness associated with PPPs. The proposed methodology comprises an SEA procedure involving PPP management and assessment in various phases, a sustainable assessment framework, and an SEA management system. The SEA procedure is devised based on the theoretical considerations by systems thinking and the regulative requirements in Taiwan. The positive and negative impacts on ecology, society, and economy are simultaneously considered in the planning (including policy generation and evaluation), implementation, and control phases of the procedure. This study used the analytic hierarchy process, Delphi technique, and systems analysis to develop a sustainable assessment framework. An SEA management system was built based on geographic information system software to process spatial, attribute, and satellite image data during the assessment procedure. The proposed methodology was applied in the SEA of golf course installation policy in 2001 as a case study, which was the first SEA in Taiwan. Most of the 82 existing golf courses in 2001 were installed on slope lands and caused a serious ecological impact. Assessment results indicated that 15 future golf courses installed on marginal lands (including buffer zones, remedied lands, and wastelands) were acceptable because the comprehensive environmental (ecological, social, and economic) assessment value was better based on environmental characteristics and management regulations of Taiwan. The SEA procedure in the planning phase for this policy was completed but the implementation phase of this policy was not begun because the related legislation procedure could not be arranged due to a few senators’ resistance. A self-review of the control phase was carried out in 2006 using this methodology. Installation permits for 12 courses on slope lands were terminated after 2001 and then 27 future courses could be installed on marginal lands. The assessment value of this policy using the data on ecological, social, and economic conditions from 2006 was higher than that using the data from 2001. The analytical results illustrate that the proposed methodology can be used to effectively and efficiently assist the related authorities for SEA.  相似文献   

15.
水污染治理效益分析   总被引:1,自引:0,他引:1  
从水污染治理损益分析中应考虑的项目组成及可能采用的估算方法作一般性的讨论,分析水污染治理方案的可行性,为水污染进行治理的决策部门提供一定的参考依据。  相似文献   

16.
ABSTRACT. The task of resource management, in this case water resources, is rapidly becoming more complex, particularly because decision making is often contingent upon various prior activities and sets of data. Comprehensive planning is required in order to prevent misallocation of resources or mismanagement in resource development. Such planning involves five general phases which are applicable to any problem faced by society: (1) problem identification; (2) formulation of alternatives; (3) evaluation of alternatives; (4) implementation; (5) review. There have been many attempts to simplify the planning process and effectively carry out these five phases. The experience of the Alberta Water Resources Division has been that the Critical Path Method is one of the most useful tools available today for planning. It involves two basic steps: (1) preparation of a network diagram which (a) identifies all the activities necessary for the completion of a project, (b) correctly sequences these activities, (c) allocates resources; and (2) mathematical computations for scheduling the activities. In other words, this approach breaks a task down into smaller units or activities for easier organization, scheduling, and performance for eventual completion of the project. This paper will illustrate the effectiveness of the Critical Path Method by discussing its application to actual water resources projects.  相似文献   

17.
Landscape-level green infrastructure creates a network of natural and semi-natural areas that protects and enhances ecosystem services, regenerative capacities, and ecological dynamism over long timeframes. It can also enhance quality of life and certain economic activity. Highways create a network for moving goods and services efficiently, enabling commerce, and improving mobility. A fundamentally profound conflict exists between transportation planning and green infrastructure planning because they both seek to create connected, functioning networks across the same landscapes and regions, but transportation networks, especially in the form of highways, fragment and disconnect green infrastructure networks. A key opportunity has emerged in the United States during the last ten years with the promotion of measures to link transportation and environmental concerns. In this article we examined the potential benefits and challenges of linking landscape-level green infrastructure planning and implementation with integrated transportation planning and highway project development in the United States policy context. This was done by establishing a conceptual model that identified logical flow lines from planning to implementation as well as the potential interconnectors between green infrastructure and highway infrastructure. We analyzed the relationship of these activities through literature review, policy analysis, and a case study of a suburban Maryland, USA landscape. We found that regionally developed and adopted green infrastructure plans can be instrumental in creating more responsive regional transportation plans and streamlining the project environmental review process while enabling better outcomes by enabling more targeted mitigation. In order for benefits to occur, however, landscape-scale green infrastructure assessments and plans must be in place before integrated transportation planning and highway project development occurs. It is in the transportation community’s interests to actively facilitate green infrastructure planning because it creates a more predictable environmental review context. On the other hand, for landscape-level green infrastructure, transportation planning and development is much more established and better funded and can provide a means of supporting green infrastructure planning and implementation, thereby enhancing conservation of ecological function.  相似文献   

18.
A matrix has been developed to guide the assessment of urban water resources. The matrix provides a means for determining the relative importance of water-related problems, and for identifying the data needed to evaluate these problems for the purpose of urban planning. The matrix columns list nine categories of potential water-related urban problems. The rows list 51 categories of data inputs which may be needed to evaluate the potential problems. The inputs include standard types of basic hydrologic data, information based on analysis and interpretation of these data, and information on the interfacing factors of climate, land, and culture. A system is described for ranking the relative importance of the problem categories and data inputs on a numerical scale of 0 to 3. From this, an index is derived that evaluates the relative importance of each input item to an overall program for water resource assessment. From the completed matrix the hydrologist can determine the availability of data to meet the identified requirements. Judgement can then be made as to priorities on work elements to provide the planner with maximum information in minimum time. The matrix also provides a basis for the development of programs and their funding in order to overcome critical data deficiencies.  相似文献   

19.
20.
Integrated water resource management (IWRM) requires accounting for many interrelated facets of water systems, water uses and stakeholders, and water management activities. The consequence is that project analysis must account for the nonseparability among the component parts of IWRM plans. This article presents a benefit‐cost (B‐C) analysis of a set of projects included in the Yakima Basin Integrated Plan proposed for the Yakima Basin in south‐central Washington State. The analysis accounts for interdependence among proposed water storage projects and between water storage and water market development in the context of historical and more adverse projected future climate scenarios. Focusing on irrigation benefits from storage, we show that the value of a given proposed storage project is lower when other proposed storage projects in the basin are implemented, and when water markets are functioning effectively. We find that none of the water storage projects satisfy a B‐C criterion, and that assuring proposed instream flow augmentation is less expensive by purchasing senior diversion rights than relying on new storage to provide it.  相似文献   