首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it parallel progress in addressing the main shortcomings of EIA/SIA, i.e. insufficient integration of environmental and social factors into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their analysis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of projects which impact on the environment, and consequently to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argues that, in a sociological context of complexity and dynamism, four conceptual elements should underpin approaches to socio-environmental risk and impact assessment in development projects: a theoretical base in actor–network theory; an ethical grounding in values which are internationally recognized (though not always fulfilled in practice); a (new) epistemological-scientific base; and a methodological foundation in social participation.  相似文献   

2.
The utilisation of Social Impact Assessment (SIA) in Iran is analysed in terms of its policy context and its application in practice. Five case studies where SIA was employed in conjunction with Environmental Impact Assessments (EIA) for agricultural development projects are evaluated. In addition, the performance of the policy context is assessed. This research revealed that there are legal and institutional constraints to the effective functioning of SIA in Iran, and that there are deficiencies in the operating guidelines. There were serious problems associated with the way SIA was undertaken in all five case studies. Recommendations to improve the policy framework for the conduct of SIA are made. The recommendations advocate for a higher profile of SIA within legislation, for social issues to have greater emphasis in official guidelines for the conduct of EIA and SIA, and for a range of measures to increase the professionalism of SIA practice.  相似文献   

3.
Given the growing amount of attention shown to the social dimension of natural resources and mining governance, there is a need for more informed research-oriented approaches to studying social impacts. This article analyzes the features of Social Impact Assessment (SIA) studies from the academic research perspective and presents a framework for social impact research. By academic research, the article refers to studies on social impacts conducted purely for research purposes, not impact assessment processes.Research is always one aspect of the SIA process. At the same time, there is a lack of general methodological literature offering guidance on how assessing social impacts can contribute to social studies research. The guiding documents on SIA are largely intended for practical-level planning and management processes, which limits their applicability for academic purposes. The proposed framework draws both from traditional social science methods and existing scholarly and guiding literature on SIA. The research framework consists of four interlinked phases: 1) research preparations, 2) background studies (including proposed project, national and local context), 3) fieldwork, and 4) analysis. The framework is designed to direct attention to the relevant aspects of research methods, theory building, fieldwork implementation, and research choices for data analysis. Thus, the framework provides a flexible, but comprehensive, multi-level approach for examining social impacts, which can be adapted for a wide range of social-scientific mining research. The analysis and developed framework will help academic researchers better study the social impacts of mining and make better use of existing SIA studies in academic life.  相似文献   

4.
Many complex social questions are difficult to address adequately with conventional methods and techniques, due to the complicated dynamics, and hard to quantify social processes. Despite these difficulties researchers and practitioners have attempted to use conventional methods not only in evaluative modes but also in predictive modes to inform decision making. The effectiveness of SIAs would be increased if they were used to support the project design processes. This requires deliberate use of lessons from retrospective assessments to inform predictive assessments. Social simulations may be a useful tool for developing a predictive SIA method. There have been limited attempts to develop computer simulations that allow social impacts to be explored and understood before implementing development projects. In light of this argument, this paper aims to introduce system dynamic (SD) simulation as a new predictive SIA method in large development projects. We propose the potential value of the SD approach to simulate social impacts of development projects. We use data from the SIA of Gareh-Bygone floodwater spreading project to illustrate the potential of SD simulation in SIA. It was concluded that in comparison to traditional SIA methods SD simulation can integrate quantitative and qualitative inputs from different sources and methods and provides a more effective and dynamic assessment of social impacts for development projects. We recommend future research to investigate the full potential of SD in SIA in comparing different situations and scenarios.  相似文献   

5.
Social Impact Assessments (SIAs) have played an increasingly important role in the conduct of planned interventions, providing proponents the capacity to assess and manage the social consequences of their activities. Whilst the SIA field has experienced significant conceptual and practical development over the last decade, efforts at consolidating this within one framework have been limited. In this paper, we incorporate this new knowledge by redeveloping and thus updating the SIA procedural framework developed by Interorganizational Committee on Guidelines and Principles for Social Impact Assessment. In doing so, this updated procedural framework has attempted to incorporate current ‘best practice’ that focuses on participatory approaches to undertaking an SIA. This involved making adaptions to two steps, expansions to five steps, integration of a stronger participatory approach to six steps, and the development of a new step, Management and Evaluation reflecting moves towards ex-post use of SIA processes. It is hoped that this consolidation of the literature of a decade's worth of key findings in SIA research will lead to further efforts towards a meta-evaluation of SIA literature and a platform from which newer developments may be further investigated.  相似文献   

6.
Urban food systems must undergo a significant transformation if they are to avoid impeding the achievement of UN Sustainable Development Goals. One reconfiguration with claimed sustainability benefits is ICT-mediated food sharing – an umbrella term used to refer to technologically-augmented collective or collaborative practices around growing, cooking, eating and redistributing food – which some argue improves environmental efficiencies by reducing waste, providing opportunities to make or save money, building social networks and generally enhancing well-being. However, most sustainability claims for food sharing have not been evidenced by systematically collected and presented data. In this paper we document our response to this mismatch between claims and evidence through the development of the SHARECITY sustainability Impact assessment Toolkit (SHARE IT); a novel Sustainability Impact Assessment (SIA) framework which has been co-designed with food sharing initiatives to better indicate the impact of food-sharing initiatives in urban food systems. We demonstrate that while several SIA frameworks have been developed to evaluate food systems at the urban scale, they contain few measures that specifically account for impacts of the sharing that initiatives undertake. The main body of the paper focuses on the co-design process undertaken with food sharing initiatives based in Dublin and London. Attention is paid to how two core goals were achieved: 1) the identification of a coherent SIA framework containing appropriate indicators for the activities of food sharing initiatives; and 2) the development of an open access online toolkit for in order to make SIA reporting accessible for food sharing initiatives. In conclusion, the co-design process revealed a number of technical and conceptual challenges, but it also stimulated creative responses to these challenges.  相似文献   

7.
The Association of Southeast Asian Nations has agreed that environmental protection and sustainable use of natural resources are essential for sound economic development. The Environmental Impact Assessment is viewed as an important management tool and an ASEAN Experts Group on the Environment has been working for several years on a model especially adapted to the region and also on case studies of the implementation of EIA. Progress so far has been frustratingly slow due to misunderstanding, a lack of ecological data, inadequate trained manpower and institutional shortcomings for compliance. The author advocates collaboration on an ASEAN model for performing EIA as a means of accelerating acceptance and implementation. The concept of Adaptive Environmental Assessment and Management is proposed as a prototype.  相似文献   

8.
9.
This paper presents the results of an ex-post assessment of two important dams in Brazil. The study follows the principles of Social Impact Management, which offer a suitable framework for analyzing the complex social transformations triggered by hydroelectric dams. In the implementation of this approach, participative causal maps were used to identify the ex-post social impacts of the Porto Primavera and Rosana dams on the community of Porto Rico, located along the High Paraná River. We found that in the operation of dams there are intermediate causes of a political nature, stemming from decisions based on values and interests not determined by neutral, exclusively technical reasons; and this insight opens up an area of action for managing the negative impacts of dams.  相似文献   

10.
An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, ‘risk and social impact assessment’ (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management.  相似文献   

11.
The Environmental Impact Assessment (EIA) Act of 1992 aimed to make the environment a central theme in development in Nigeria. Nevertheless, the extent of engagement with local cultures in the Nigerian EIA process is not statutorily guaranteed. While most EIAs in Nigeria have been for oil and gas projects in the Niger Delta, and have focused strongly on the biophysical environment, socio-economic and cultural aspects have remained marginal. The palpable neglect of community perceptions and cultural diversity in social impact assessment (SIA) in this region prone to conflict has tended to alienate the people in the decision-making process. Thus, despite claims to compliance with regulatory requirements for EIAs, and numerous purported sustainable development initiatives by international oil companies (IOCs), the region continues to face multiple sustainability challenges. This paper situates local perceptions and cultural diversity in participatory development and canvasses the integration of community perceptions and cultural diversity into SIA in the Niger Delta region. It is argued that doing this would be critical to ensuring acceptance and success of development actions within the context of local culture while also contributing to sustainable development policy in the region.  相似文献   

12.
We address the weaknesses inherent in the social risk assessments undertaken for business, especially in the extractive industries. In contrast to the conventional approach that considers consequence to the company rather than to impacted communities, conformance with the United Nations Guiding Principles on Business and Human Rights requires that consequence to affected communities has precedence. In order for social risks to be properly assessed, we consider that: companies need to know and understand the human rights impacts of their activities; contemporary approaches to project impact and risk assessment need to be adapted to consider human rights; and environmental impact assessment (EIA) and social impact assessment (SIA) methods need to be adapted to give greater attention to impacts on human rights. Using an example from the mining, oil and gas sector, we provide a method that differentiates social risks from business risks, and we position impact assessment as an instrument that actively facilitates the improved identification, analysis and management of social risks. Practical adaptations to SIA activities and risk assessment processes are provided. Taking human rights impacts into account and using the dimensions of gravity, extent, vulnerability and remediability, we nominate criteria to assess the significance of negative social impacts.  相似文献   

13.
Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.  相似文献   

14.
Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools.  相似文献   

15.
Forests are becoming severely fragmented as a result of land development. South Korea has responded to changing community concerns about environmental issues. The nation has developed and is extending a broad range of tools for use in environmental management. Although legally mandated environmental compliance requirements in South Korea have been implemented to predict and evaluate the impacts of land-development projects, these legal instruments are often insufficient to assess the subsequent impact of development on the surrounding forests. It is especially difficult to examine impacts on multiple (e.g., regional and local) scales in detail. Forest configuration and size, including forest fragmentation by land development, are considered on a regional scale. Moreover, forest structure and composition, including biodiversity, are considered on a local scale in the Environmental Impact Assessment process. Recently, the government amended the Environmental Impact Assessment Act, including the SEA, EIA, and small-scale EIA, to require an integrated approach. Therefore, the purpose of this study was to establish an impact assessment system that minimizes the impacts of land development using an approach that is integrated across multiple scales.This study focused on forest fragmentation due to residential development and road construction sites in selected Congestion Restraint Zones (CRZs) in the Greater Seoul Area of South Korea. Based on a review of multiple-scale impacts, this paper integrates models that assess the impacts of land development on forest ecosystems. The applicability of the integrated model for assessing impacts on forest ecosystems through the SEIA process is considered.On a regional scale, it is possible to evaluate the location and size of a land-development project by considering aspects of forest fragmentation, such as the stability of the forest structure and the degree of fragmentation. On a local scale, land-development projects should consider the distances at which impacts occur in the vicinity of the forest ecosystem, and these considerations should include the impacts on forest vegetation and bird species. Impacts can be mitigated by considering the distances at which these influences occur. In particular, this paper presents an integrated environmental impact assessment system to be applied in the SEIA process. The integrated assessment system permits the assessment of the cumulative impacts of land development on multiple scales.  相似文献   

16.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

17.
Environmental Impact Assessments (EIAs) that are applied in the planning phases of large land-use and construction projects are aimed at aiding decision-making and mitigating significant environmental impacts. In light of the global biodiversity crisis, conducting high-quality biodiversity impact assessments is important, as biodiversity information, among other factors, has the potential to influence how projects will be implemented in the end. We investigated the biodiversity and bird surveys conducted and the number of bird species of conservation concern in peat extraction and wind farm projects to which an EIA was applied to in 1995–2016 in Finland and compared whether these factors differed between the project types and between implemented and unimplemented projects. We also studied the availability of follow-up monitoring data of biodiversity impacts within the two project types. The number of nationally threatened breeding birds was significantly lower in implemented than in unimplemented peat extraction projects. The overall probability of being implemented was significantly negatively associated with the year the EIA began for both project types. All permitted peat extraction projects and 22% of wind farm projects conducted post-construction biodiversity monitoring; however, only some projects enabled before-after comparisons. Our results are in line with earlier findings that demonstrate the difficulty of showing the direct impacts of biodiversity information on EIA decision-making and to what extent it is related to project approval or rejection. The role of follow-up monitoring in the EIA and project development could also be strengthened.  相似文献   

18.
Tiering of information and decisions from more strategic plans to more specific projects (and sometimes the other way) can streamline plan-making and assessments, and improve decisions at each planning tier. In particular, it can lead to more consistent and comprehensive impact mitigation at the lower tiers. In practice, however, tiering of assessments is carried out only sporadically. This paper reviews the international literature and case studies on Strategic Environmental Assessment (SEA) and Environmental Impact Assessment (EIA) tiering, and presents the findings of interviews with 14 SEA/EIA experts. It concludes that a conscious and explicit transfer of information from the SEA level, and an explicit receipt of this information at the EIA level are necessary prerequisites for effective tiering. SEAs must be carried out with local actions in mind, in order for mitigation measures to support environmental protection on the ground. Lower-tier decision-makers must also be willing to be bound by decisions by the higher-tier SEA, focusing on implementation of these decisions.  相似文献   

19.
Energy developments affect communities in a range of ways. Impacts on communities can be caused by changes to landscape amenity and access, disruptions to community cohesion, increased or decreased income streams, effects on property values, and population changes. These changes are ideally captured in the social impact assessment (SIA) process, where proponents outline in a formal statement the balance of benefits and burdens on local communities, and measures that will be taken to minimise negative outcomes for the community. In SIA practice there is a tendency toward quantitative socio-economic impacts, such as changes to demographics, income, and land values, with some qualitative assessment of amenity impacts. While the academic literature promotes inclusion of changes to the community itself, such as impacts on community cohesion and social capital, these qualitative changes are not consistently evident in SIA practice. Additionally, SIA practice assesses the impacts of the project, i.e. how the development of wind turbines or other energy infrastructure will affect the community. Because the consultation process around a proposed project typically commences prior to the characterisation and assessment of any associated social impacts and the finalisation of the SIA process, the potential impacts of this consultation are rarely, if ever, evaluated. Here, we examine a case study of an Australian wind energy project that did not proceed to implementation. Through this case study we are able to analyse the anticipatory impacts of the proposal; those stemming from the consultative process rather than the development of the project itself. We present these qualitative social changes, and outline the pathways through which the social changes manifest in two overarching social impacts: a divided community and future development capacity. We discuss the implications of this analysis in the context of good engagement practice and energy governance.  相似文献   

20.
We analyse two approaches to social impact assessment (SIA) – traditional SIA and participatory SIA – in the context of a large project in the Russian Federation. The key difference between these approaches is the level and depth of stakeholder engagement in the impact assessment process and project. Participatory SIA seeks to observe the three principles of participatory democracy: representativeness, deliberativeness and influence. We identify the requirements for stakeholder engagement in the Russian impact assessment process, and analyse implementation practice by reviewing the stakeholder engagement activities undertaken for the South Stream gas pipeline project, according to national requirements and international best practice (e.g. the International Finance Corporation Performance Standards). We conclude that the Russian process reflects traditional SIA. Its main weaknesses are poor stakeholder identification and planning of engagement activities. The Russian SIA/EIA process is not consistent with the principles of representativeness, deliberativeness and influence and does not enable people to adequately participate in or influence decision-making.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号