首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 265 毫秒
1.
Land take is emerging as a global environmental concern, and is particularly critical in intensively developed and land-scarce regions. This paper seeks to understand the effectiveness of the screening stage of Environmental Impact Assessment (EIA) in addressing land take. Screening is the stage where a decision is made as to whether an EIA is required for a project. In many jurisdictions, screening results in three pathways: full EIA directly, preliminary EIA only, or preliminary EIA followed by full EIA. We compared the land take of 217 projects triggering the different pathways in a study region in Italy over a 15-year time interval. Land take was quantified by overlaying the footprint of the projects with a land cover map.The results show that while more attention was given to projects with larger land take impacts overall, the cumulative land take from smaller projects not triggering full EIA was considerable (40% of overall land take). The case-by-case examination conducted through the preliminary EIA was found to work better for some project types (ski areas and small urban development), than for others (quarries). Our findings lead us to advocate improvements in current screening procedures to ensure that the land take impacts are quantified and made explicit in preliminary EIA reports. Our evidence-based approach to determining land take in EIA provides a compelling basis for understanding ways to improve EIA policies, guidance and practice.  相似文献   

2.
Life Cycle Assessment (LCA) is the main technique for evaluate the environmental impacts of product life cycles. A major challenge in the field of LCA is spatial and temporal differentiation in Life Cycle Impact Assessment (LCIA) methods, especially impacts resulting from land occupation and land transformation. Land use characterization modeling has advanced considerably over the last two decades and many approaches have recently included crucial aspects such as geographic differentiation. Nevertheless, characterization models have so far not been systematically reviewed and evaluated to determine their applicability to South America. Given that Brazil is the largest country in South America, this paper analyzes the main international characterization models currently available in the literature, with a view to recommending regionalized models applicable on a global scale for land use life cycle impact assessments, and discusses their feasibility for regionalized assessment in Brazil. The analytical methodology involves classification based on the following criteria: midpoint/endpoint approach, scope of application, area of data collection, biogeographical differentiation, definition of recovery time and reference situation; followed by an evaluation of thirteen scientific robustness and environmental relevance subcriteria. The results of the scope of application are distributed among 25% of the models developed for the European context, and 50% have a global scope. There is no consensus in the literature about the definition of parameters such biogeographical differentiation and reference situation, and our review indicates that 35% of the models use ecoregion division while 40% use the concept of potential natural vegetation. Four characterization models show high scores in terms of scientific robustness and environmental relevance. These models are recommended for application in land use life cycle impact assessments, and also to serve as references for the development or adaptation of regional methodological procedures for Brazil.  相似文献   

3.
Effects of Forest Management Practices on Mid-Atlantic Streams   总被引:1,自引:0,他引:1  
Agricultural and urban land use activities have affected stream ecosystems throughout the mid-Atlantic region. However, over 60% of the mid-Atlantic region is forested. A study was conducted to investigate the effects of management practices on forested stream ecosystems throughout the mid-Atlantic region. The study consisted of two phases: Phase 1 was a literature synthesis of information available on the effects of forest management practices on stream hydrology, erosion and sedimentation, riparian habitat alteration, chemical addition, and change in biotic diversity in the mid-Atlantic region. In Phase 2, data from mid-Atlantic streams were analyzed to assess the effects of forest land use on stream quality at the regional scale. Typically, it is the larger order streams in which monitoring and assessment occurs—3rd order or higher streams. The impacts of forest management practices, particularly hydrologic modifications and riparian buffer zone alteration, occur predominantly in first and second order streams with cumulative impacts translating to higher order streams. Based on the literature review and mid-Atlantic Highland streams analysis, there are short-term (e.g., 2 to 5 years) effects of forest management practices on stream quality at local scales. However, signatures of cumulative effects from forest management practices are not apparent at regional scales in the Highlands. In general, forested land use is associated with good stream quality in the region compared with other land use practices.  相似文献   

4.
Highway construction or expansion projects are among major activities of economic development especially in developing countries. However, road development consistently can lead to major damages to the environment, including habitat fragmentation and ecological instabilities and a considerable threat to fauna and flora. At this point, Environmental Impact Assessment (EIA) in road developments is needed to address and evaluate the ecological issues in decision-making. The object of this study is to strengthen the consideration of ecological issues, i.e., biodiversity in the existing EIA tools. This paper regards a network method as a means to make informed planning decisions by the lessons from a case study. The results indicate that network method is well suited to be applied in ecological impacts assessment. However, some limitations such as complexity and time consumed make casual networks unpopular. Also, impact of traffic noise on acoustic communication (wildlife and human) was performed. It has been shown that sound level for human is much higher than admissible standards. Finally, the study expresses some mitigation measures to improve the acquisition for environmental impact assessment process.  相似文献   

5.
Cohen et al. [16] suggest that in order to explore ways to bring climate change (CC) and sustainable development (SD) research together, it is necessary to develop more heuristic tools that can involve resource users and other stakeholders. In this respect, this paper focuses on methodological development in research to study climate change impacts and regional sustainable development (RSD). It starts with an introduction of an integrated land assessment framework (ILAF) which is part of the integrated phase of the Mackenzie Basin Impact Study (MBIS) in Canada. The paper then provides some articulation on how the integrated approach was applied in the Mackenzie Basin to show implications of climate change for RSD.  相似文献   

6.
This paper presents a new methodology for impact assessment—SIAM (Spatial Impact Assessment Methodology)—which is based on the assumption that the importance of environmental impacts is dependent, among other things, on the spatial distribution of the effects and of the affected environment. The information generated by the use of Geographical Information Systems (GIS) in impact identification and prediction stages of Environmental Impact Assessment (EIA) is used in the assessment of impact significance by the computation of a set of impact indices. For each environmental component (e.g., air pollution, water resources, biological resources), impact indices are calculated based on the spatial distribution of impacts. A case study of impact evaluation of a proposed highway in Central Portugal illustrates the application of the methodology and shows its capabilities to be adapted to the particular characteristics of a given EIA problem.  相似文献   

7.
Environmental impact assessment (EIA) is a policy tool used for evaluating a project proposal from physical and socioeconomic environmental perspectives. Its aim is to reduce the impact of development on environment, hence, ensuring environmental sustainability. It is mandatory to submit an Environmental Impact Statement before starting a mega project as required by Environmental Protection Act of 1997 and Environmental Policy of Pakistan. Public consultation plays a key role in an EIA system, identifying the likely aspects and impacts of a development activity. This aspect has been ignored in effective enactment of environmental legislation in Pakistan. Sufficient legislative instruments are there to support EIA system in the country but the agencies responsible for the enforcement of environmental regulations have failed to do so. The current research gives an insight into the actual status of EIA system in Pakistan along with the feedback of EIA specialists and university teachers of the concerned departments. A new index has been devised on the basis of questionnaire response to work out the overall performance of EIA system in Pakistan or any other country. The weaknesses and deficiencies of each EIA stage have been worked out for Pakistan and elaborated with the help of the controversial Zero point Interchange Project in the capital city of Pakistan.  相似文献   

8.
Chile was one of many countries that initiated environmental impact assessments in the 1990s, and has relied on their use for species conservation and territorial planning without the use of larger-scale environmental and ecological planning. The capacity of Chile's environmental impact assessment system (SEIA) to evaluate resident freshwater fishes and the potential impacts of water projects and aquaculture activities – two categories of projects that create direct threats to freshwater fishes – are assessed. Of the 3997 such submissions to the SEIA, only 0.6% conducted any freshwater fish assessment, and only 0.1% conducted any quantitative assessment of expected impacts from the associated project. The small number of assessments was characterized by poor study design, inconsistent sampling methodology, and species misidentification. Traditional assessments failed to include freshwater fish ecology in the general assessment framework. The new strategic environmental evaluation system only underscores the need for vastly improved field sampling protocols and assessment methodologies.  相似文献   

9.
The costs of conducting Environmental Impact Assessment (EIA) are well known. Yet the benefits of EIA are much more intangible, leading to a situation where some question its value as the tool of choice for informing decision makers of the sustainability consequences of their actions. Exponents of EIA have thus called for more research on the benefits of EIA in order to provide better evidence on its costs versus benefits, and therefore its value as a decision-making tool. This paper contributes to this evidence by exploring the perceived potential benefits and perceived realised benefits of EIA from a regulators' perspective in the context of sustainable development. Using South Africa as a case study, one third of all the officials responsible for EIA review and decision-making (referred to in this paper as the “regulator”) were surveyed to identify their perceptions of the benefits of EIA, and their ideas on how to bridge the gap between potential benefits and realised benefits. The paper contributes suggestions for the analysis of benefits in a sustainable development context, and identifies some additional benefits currently missing from the literature. In a South African context, the key potential and realised benefits as perceived by regulators are the protection of biodiversity, public participation, access to information, mitigation of environmental impacts, and legal compliance and enforcement.  相似文献   

10.
Current political discussions and developments indicate the importance and urgency of incorporating climate change considerations into EIA processes. The recent revision of the EU Directive 2014/52/EU on Environmental Impact Assessment (EIA) requires changes in the EIA practice of the EU member states. This paper investigates the extent to which the Environmental Impact Assessment (EIA) can contribute to an early consideration of climate change consequences in planning processes. In particular the roles of different actors in order to incorporate climate change impacts and adaptation into project planning subject to EIA at the appropriate levels are a core topic. Semi-structured expert interviews were carried out with representatives of the main infrastructure companies and institutions responsible in these sectors in Austria, which have to carry out EIA regularly. In a second step expert interviews were conducted with EIA assessors and EIA authorities in Austria and Germany, in order to examine the extent to which climate-based changes are already considered in EIA processes. This paper aims to discuss the different perspectives in the current EIA practice with regard to integrating climate change impacts as well as barriers and solutions identified by the groups of actors involved, namely project developers, environmental competent authorities and consultants (EIA assessors/practitioners). The interviews show that different groups of actors consider the topic to different degrees. Downscaling of climate change scenarios is in this context both, a critical issue with regards to availability of data and costs. Furthermore, assistance for the interpretation of relevant impacts, to be deducted from climate change scenarios, on the specific environmental issues in the area is needed. The main barriers identified by the EIA experts therefore include a lack of data as well as general uncertainty as to how far climate change should be considered in the process without reliable data but in the presence of knowledge about possible consequences at an abstract level. A joint strategy on how to cope with uncertain prognoses about main impacts on environmental issues for areas without reliable data requires a discussion and cooperation between EIA consultants and environmental authorities.  相似文献   

11.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

12.
The cross-country petroleum pipelines are environmentally sensitive because they traverse through varied terrain covering crop fields, forests, rivers, populated areas, desert, hills and offshore. Any malfunction of these pipelines may cause devastating effect on the environment. Hence, the pipeline operators plan and design pipelines projects with sufficient consideration of environment and social aspects along with the technological alternatives. Traditionally, in project appraisal, optimum technical alternative is selected using financial analysis. Impact assessments (IA) are then carried out to justify the selection and subsequent statutory approval. However, the IAs often suggest alternative sites and/or alternate technology and implementation methodology, resulting in revision of entire technical and financial analysis. This study addresses the above issues by developing an integrated framework for project feasibility analysis with the application of analytic hierarchy process (AHP), a multiple attribute decision-making technique. The model considers technical analysis (TA), socioeconomic IA (SEIA) and environmental IA (EIA) in an integrated framework to select the best project from a few alternative feasible projects. Subsequent financial analysis then justifies the selection. The entire methodology has been explained here through a case application on cross-country petroleum pipeline project in India.  相似文献   

13.
Environmental Impact Assessment (EIA) incorporates environmental aspects into decision-making, but sometimes it is not effective in rejecting projects with dubious justification, significant impacts and little social utility, especially when they have political support. EIA is expected to achieve sustainable development, but without calling development into question; however, it should be able to ask the question of whether development is really necessary. Although EIA is political, as a part of the decision-making process, politicization must be limited to prevent it from becoming a mere instrument for giving an “environmental veneer” to development. Some measures thar can help avoid unjustified projects are: adopting administrative justice approach to EIA; minimising politicization of EIA agencies; improving transparency in decision-making and proportionality of EIA procedures; carrying out pre-feasibility studies; increasing the scope of SEA; allowing more than one SEA or EIA procedure for the same development throughout the planning process; strengthening the justification of the project in EIA documents; or making the scoping phase mandatory at least for major projects.  相似文献   

14.
15.
Environmental impact assessment (EIA) processes are grounded on the assumption that producing information about environmental impacts will yield better environmental decisions. Despite the ubiquity of EIA as a policy tool, there is scant evidence of its environmental, social, or economic impacts. Focusing on Environmental Impact Statements (EIS) prepared for water and energy-related projects under the US National Environmental Policy Act, this analysis addresses two questions: (1) What is the balance of environmental impacts associated with infrastructure decisions?; and (2) How does the content of stakeholder feedback received during the review phase differ from draft EIS content, and does this correspond to any changes in the final EIS? We demonstrate the use of automated text mining approaches to identify the distribution of impacts, measure the content of public comments, and observe whether values reflected in comments are associated with a shift in emphases between the draft and final EIS. EISs are shown to convey evenly distributed focus across multiple impact areas. However, we observe no substantive change in focal emphasis between draft and final issuances. This calls into question assumptions about the role that public participation plays in bringing new information to light or changing the course of action.  相似文献   

16.
Article 14 of the Convention on Biological Diversity (CBD) calls for the inclusion of impacts on biodiversity in Environmental Impact Assessment (EIA), which is a significant instrument for site-specific impact prediction. In view of the shortcomings reported for Environmental Impact Statements (EISs), guidelines with indicators could improve the consideration of biological diversity in EISs. This study aims to establish guidelines for the analysis of the inclusion of biodiversity in EISs using a systematic approach based on scientific papers, CBD, and a survey with 43 EIA practitioners from universities, government agencies, environmental consulting companies, business segment, and the third sector. The guidelines comprise 60 indicators arranged into eight categories about the project's characteristics, methods, baseline, impact assessment, alternatives, as well as mitigation, compensation, and monitoring measures. The guidelines also include the levels of biological diversity (ecosystem, species, and genetic diversity), the three elements of biodiversity (composition, structure, and key processes), and the main anthropogenic threats. Thus, the guidelines represent a methodological contribution to EIA that could support decision making and future systematic reviews of EISs.  相似文献   

17.
The main problem of traditional methods of environmental impact assessment (EIA) is that in most of the existing algorithms and methods, such as Leopold, Folchi and RIAM, the main attention is to the destructive effects of the proposed plan, and the advantages of the industrial project are less noticeable. This has led to a permanent challenge between environmental organizations and industrial stakeholders. Data envelopment analysis (DEA) is a new approach of assessing the industrial units. Besides, it considers the positive economic and social impacts of the project and provides a comprehensive assessment of the industrial unit. With this approach, the environmental impacts of an industrial unit have been considered as “inputs” and its positive economic and social impacts considered as the “outputs” of the DEA models. Therefore, the problem of impact assessment changes into a DEA model. In the present study, the Alborz Sharghi Coal washing plant in northern Iran has been considered as a case study for implementing the DEA-EIA approach, and 19 plant activities and 11 environmental components have been used to evaluate the environmental effects of the plant. To solve the EIA problem, two commonly used DEA approaches, called CRS (constant returns to scale) and VRS (variable returns to scale), have been used. The DEA results identified the critical environmental components of the plant that should be considered seriously. Also, drawing the “potential improvement” diagram in the DEA method is an effective tool for determining the high risk activities of the factory and applying them in development plans. Besides, using the VRS model with maximize-output approach showed that some of the plant activities had the most differences with optimal mode and these components should be considered in future development plans. Finally, it can be concluded that, assessing the environmental impacts of the mineral industries with VRS maximize-output approach, is closer to the concept of sustainable development and cost-benefit analysis.  相似文献   

18.
The environmental setting (e.g., climate, topography, geology) and land use affect stream physical characteristics singly and cumulatively. At broad geographic scales, we determined the importance of environmental setting and land use in explaining variation in stream physical characteristics. We hypothesized that as the spatial scale decreased from national to regional, land use would explain more of the variation in stream physical characteristics because environmental settings become more homogeneous. At a national scale, stepwise linear regression indicated that environmental setting was more important in explaining variability in stream physical characteristics. Although statistically discernible, the amount of variation explained by land use was not remarkable due to low partial correlations. At level II ecoregion spatial scales (southeastern USA plains, central USA plains, and a combination of the western Cordillera and the western interior basins and ranges), environmental setting variables were again more important predictors of stream physical characteristics, however, as the spatial scale decreased from national to regional, the portion of variability in stream physical characteristics explained by basin land use increased. Development of stream habitat indicators of land use will depend upon an understanding of relations between stream physical characteristics and environmental factors at multiple spatial scales. Smaller spatial scales will be necessary to reduce the confounding effects of variable environmental settings before the effects of land use can be reliably assessed.  相似文献   

19.
Large areas of public lands administered by the Bureau of Land Management and located in arid regions of the southwestern United States are being considered for the development of utility-scale solar energy facilities. Land-disturbing activities in these desert, alluvium-filled valleys have the potential to adversely affect the hydrologic and ecologic functions of ephemeral streams. Regulation and management of ephemeral streams typically falls under a spectrum of federal, state, and local programs, but scientifically based guidelines for protecting ephemeral streams with respect to land-development activities are largely nonexistent. This study developed an assessment approach for quantifying the sensitivity to land disturbance of ephemeral stream reaches located in proposed solar energy zones (SEZs). The ephemeral stream assessment approach used publicly-available geospatial data on hydrology, topography, surficial geology, and soil characteristics, as well as high-resolution aerial imagery. These datasets were used to inform a professional judgment-based score index of potential land disturbance impacts on selected critical functions of ephemeral streams, including flow and sediment conveyance, ecological habitat value, and groundwater recharge. The total sensitivity scores (sum of scores for the critical stream functions of flow and sediment conveyance, ecological habitats, and groundwater recharge) were used to identify highly sensitive stream reaches to inform decisions on developable areas in SEZs. Total sensitivity scores typically reflected the scores of the individual stream functions; some exceptions pertain to groundwater recharge and ecological habitats. The primary limitations of this assessment approach were the lack of high-resolution identification of ephemeral stream channels in the existing National Hydrography Dataset, and the lack of mechanistic processes describing potential impacts on ephemeral stream functions at the watershed scale. The primary strength of this assessment approach is that it allows watershed-scale planning for low-impact development in arid ecosystems; the qualitative scoring of potential impacts can also be adjusted to accommodate new geospatial data, and to allow for expert and stakeholder input into decisions regarding the identification and potential avoidance of highly sensitive stream reaches.  相似文献   

20.
Health Impact Assessment (HIA) is a decision support approach which is applied in various shapes and forms throughout the world. In England, amongst a range of areas of application, HIA is applied in local (spatial) plan making and project development planning. Whilst various authors have reflected on HIA practice in England, the extent of application and its quality has remained unclear. This paper aims at addressing this gap by reporting on the results of a systematic review of HIA in planning. It is found that between 100 and 200 HIAs are likely being produced each year in England. Whilst most assessments are rapid (desk based), there are also examples of comprehensive and intermediate HIAs, where a participatory procedural approach is followed. An important finding is that those HIAs applied within the context of other assessments (integrated impact assessment -IIA, strategic environmental assessment - SEA/ sustainability appraisal -SA and environmental impact assessment – EIA) tend to be of a higher quality than standalone HIAs, mainly because of the existing comprehensive statutory procedural requirements for these other assessments into which HIA can be integrated.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号