首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
There is a widespread tendency to streamline EIA, a confusing concept, which in practice usually means shortening processes to speed up project licensing, facilitating investment. It is reasonable for developers seek processes quick, simple and inexpensive, but it is also the obligation of governments to ensure that approved projects are environmentally suitable. Not all projects subject to EIA have the same impacts, so the existence of two processes, simplified and ordinary, seems reasonable. The aim of this paper is to analyse the implementation of simplified EIA processes, discussing its benefits and drawbacks. To do this, we have analysed 55 EIA processes from 25 jurisdictions, discussing its benefits and drawbacks and selecting effective and well-established formulas for simplified EIA. In most of the analysed cases, simplified EIA is achieved by reducing public participation, one of the pillars of EIA. It seems to be a chain reaction: ordinary EIA processes have been “streamlined” by removing formal scoping, giving rise in practice to simplified processes. As a result, simplified processes have been ultra-simplified, eliminating public participation, turning them, at best, into screening stages. Simplification must ensure a proper EIA, and not merely a shortening of deadlines.  相似文献   

2.
This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline common good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up.  相似文献   

3.
Tiering of information and decisions from more strategic plans to more specific projects (and sometimes the other way) can streamline plan-making and assessments, and improve decisions at each planning tier. In particular, it can lead to more consistent and comprehensive impact mitigation at the lower tiers. In practice, however, tiering of assessments is carried out only sporadically. This paper reviews the international literature and case studies on Strategic Environmental Assessment (SEA) and Environmental Impact Assessment (EIA) tiering, and presents the findings of interviews with 14 SEA/EIA experts. It concludes that a conscious and explicit transfer of information from the SEA level, and an explicit receipt of this information at the EIA level are necessary prerequisites for effective tiering. SEAs must be carried out with local actions in mind, in order for mitigation measures to support environmental protection on the ground. Lower-tier decision-makers must also be willing to be bound by decisions by the higher-tier SEA, focusing on implementation of these decisions.  相似文献   

4.
In recent years, China's government authorities have devoted increasing attention to the role of public participation processes in Environmental Impact Assessment (EIA). The capacity of these processes to influence decision-making remains widely debated. This paper aims at appraising the institutional rationale informing the implementation of public participation in China's EIA, benchmarking it against three conceptualisations: (1) Normative, based on objectives of empowerment and democratisation; (2) Substantive, where participation is pursued mainly to improve quality of decisions; (3) Instrumental, seeking participation as an instrument to legitimise decision-making processes. The appraisal is carried out by means of a new integrated index (Public Participation Index, PPI), which is applied to a case study representative of latest advancements in EIA public participation practices in China, namely the “New Beijing Airport Project”. Located 46 km south of downtown Beijing, the project was approved in 2014 and it is currently under construction. Results of the PPI application to this case study indicate that, despite progress made in recent years, the implementation of public participation in Chinese EIA still largely responds to an instrumental rationale, with limited capacity for the public to affect decisions.  相似文献   

5.
Even a cursory glance at the literature on environmental impact assessment (EIA) reveals that public participation is being considered as an integral part of the assessment procedure. Public participation in EIA is commonly deemed to foster democratic policy-making and to render EIA more effective. Yet a closer look at the literature unveils that, beyond this general assertion, opinions of the precise meaning, objectives and adequate representation of public participation in EIA considerably diverge. Against this background, in this article we aim to provide a comprehensive overview of the academic debate on public participation in EIA concerning its meaning, objectives and adequate level of inclusiveness. In so doing, we hope to stimulate a more focused debate on the subject, which is key to advancing the research agenda. Furthermore, this paper may serve as a starting point for practitioners involved in defining the role of public participation in EIA practice.  相似文献   

6.
This paper explores the underlying practice-based challenges to meaningful and efficient Aboriginal participation in environmental assessment (EA) - participation that provides meaningful opportunities for Aboriginal communities to shape EA, yet assures a degree of efficiency for project proponents who need to obtain EA approvals in a timely and financially viable manner. We do so based on an analysis of the EA policy community's experience with uranium exploration and mining in Saskatchewan, Canada. Many of the challenges to meaningful and efficient Aboriginal participation that emerged are multi-dimensional, often concerning participation processes, decision-making, and relationships. Although scholars have explored many of these issues and have proposed numerous solutions, challenges persist in practice. Several other issues also emerged from our study that have received limited attention, including the non-commitment to early and ongoing participation by smaller project proponents, and the EA exemption of exploration projects; the limited availability of information to project developers on local right holders and Aboriginal interests; expectations about the integration of traditional knowledge and land use in EA not aligning with the information that is available to proponents; confusion about who is responsible for initiating early participation and consultation processes; the lack of early relationship building with potentially affected communities, particularly by governments; and the lack of other viable avenues, outside EA, for Aboriginal communities to raise more strategic issues of concern that affect traditional lands and treaty rights.  相似文献   

7.
The Environmental Impact Assessment Directive (EIA Directive) has created a reference framework for the implementation of the system of Environmental Impact Assessment (EIA) into the legal systems of the Member States of the European Union, including the countries belonging to the Visegrad Group (V4): Poland, Slovakia, the Czech Republic and Hungary. The Directive was the basis for the introduction of compulsory stages of the EIA process in the V4. The stages were then adapted to national requirements, including thresholds of the qualifying criteria of projects at the screening and scoping stages. The EIA system in the analysed countries has been growing, changing and being modified together with the political and economic changes of the last 30 years. Although all Visegrad Group countries are members of the EU and should harmonize the provisions of the EIA Directive and its amendments, there still exist singularities in each country's national EIA legislation, in terms of complementarities among the V4 countries, access to information resources, protection of natural resources, mitigation of socio-environmental impacts, or transboundary impact assessment. The article compares and evaluates the EIA systems in the four countries, specifies similarities and differences in the implementation of administrative proceedings and points out opportunities to strengthen the system. It presents selected results of a study conducted in 2013 within the framework of the international project “Assessment of the quality of the environment in the V4 Countries” (AQE V4). This paper indicates examples of good practice in the EIA systems and the obtained results are compared regarding the amendments to the current European Union EIA Directive.  相似文献   

8.
The use of economic valuation methods to assess environmental impacts of projects and policies has grown considerably in recent years. However, environmental valuation appears to have developed independently of regulations and practice of environmental impact assessment (EIA), despite its potential benefits to the EIA process. Environmental valuation may be useful in judging significance of impacts, determining mitigation level, comparing alternatives and generally enabling a more objective analysis of tradeoffs. In China, laws and regulations require the use of environmental valuation in EIA, but current practice lags far behind. This paper assesses the problems and prospects of introducing environmental valuation into the EIA process in China. We conduct four case studies of environmental economic impact assessment (EEIA), three of which are based on environmental impact statements of construction projects (a power plant, a wastewater treatment plant and a road construction project) and one for a regional pollution problem (wastewater irrigation). The paper demonstrates the potential usefulness of environmental valuation but also discusses several challenges to the introduction and wider use of EEIA, many of which are likely to be of relevance far beyond the Chinese context. The paper closes with suggesting some initial core elements of an EEIA guideline.  相似文献   

9.
Follow-up is a vital component of Environmental Impact Assessment (EIA), being essential for understanding assessment outcomes. Long-standing international best practice principles for EIA follow-up are reviewed, and revisions proposed, based on workshops with academics and practitioners, literature review and self-reflection. The proposed revision of EIA follow-up principles will feature an introduction with a simple definition and explanation of objectives for follow-up, and 15 principles. The revised principles address: objective; context; early establishment; project life-cycle; transparency; accessibility; accountability; performance criteria provision; enforcement; learning; adaptive environmental management; flexible or adaptive approach; tiering; cumulative effects and overall performance evaluation. Through publishing this proposal, it is hoped to simultaneously inform or inspire EIA practitioners to enhance their own follow-up knowledge and practices, and to seek input for further refinements that might lead to a revised set of international best practice principles for EIA follow-up.  相似文献   

10.
While the development of maritime economic activity is increasingly encouraged, the consideration of its impacts constitutes a real challenge. The limitations of the implementation of the mitigation hierarchy have been widely discussed in scientific literature, yet data on marine biodiversity offset practices remains scarce. In this study, we investigated the use of Environmental Impact Assessments (EIAs) as suitable instruments to achieve the No Net Loss objective. Drawing on a French approach developed for the initial assessment of the European Marine Strategy Framework Directive, we examined the pressures and impacts related to various marine development projects and the effectiveness of the mitigation hierarchy in limiting these. An analysis of 55 recent French environmental impact studies showed that only 7% of the proposed measures had the aim of offsetting predicted degradation of sites of remarkable biodiversity. This can be partly explained by the lack of a clear definition of ‘significant impact’, which varies greatly depending on what is impacted, in turn allowing socio-economic activities to benefit more easily from offset. Furthermore, offsetting does not always constitute the final step of the mitigation hierarchy, highlighting the need to reinforce avoidance and reduction steps. Although we acknowledge the role of EIA in mitigating the negative impacts of development projects, synergies with other European marine environmental policies such as the Marine Strategy Framework Directive (MSFD) and the Maritime Spatial Planning directive (MSP) should be developed in order to improve current practices.  相似文献   

11.
12.
There is increased awareness of the need to balance multiple societal values in land use and development planning. Best practice has promoted the use of landscape-level conservation planning and application of the ‘mitigation hierarchy’, which focuses on avoiding, minimizing or compensating for impacts of development projects. However, environmental impact assessments (EIA) typically focus in a reactive way on single project footprints with an emphasis on environmental values and specifically biodiversity. This separation may miss opportunities to jointly plan for and manage impacts to both environmental and social values. Integrated approaches may have particular benefit in northern Australia, where Indigenous people have native title to as much as 60% of the land area and cultural values are closely linked with natural values. Here, we present a novel framework for integrating biodiversity and cultural values to facilitate use in EIA processes, using the Nyikina Mangala Native Title Determination Area in the Kimberley, Western Australia, as a case study. We demonstrate 1) how social and cultural values can be organized and analyzed spatially to support mitigation planning, 2) how social, cultural, and biodiversity values may reinforce each other to deliver better conservation outcomes and minimize conflict, and 3) how this information, in the hands of Indigenous communities, provides capacity to proactively assess development proposals and negotiate mitigation measures to conserve social, cultural, and biodiversity values following the mitigation hierarchy. Based on values defined through a Healthy Country Planning process, we developed spatial datasets to represent cultural/heritage sites, freshwater features, common native animals and plants represented by biophysical habitat types, and legally-protected threatened and migratory species represented by potential habitat models. Both cultural/heritage sites and threatened species habitat show a strong thematic and spatial link with freshwater features, particularly the Fitzroy River wetlands. We outline some of the challenges and opportunities of this process and its implications for the Northern Australia development agenda.  相似文献   

13.
The effectiveness of Environmental Impact Assessment (EIA) in the transport field is increasingly being contested. Apart from technical issues (e.g., impacts measurements), the literature highlights process-related barriers as key obstacles to effective EIA implementation in transport projects (e.g., lack of collaborative work, transparency, etc.). Nevertheless, most academic efforts to date have focused on technical improvements, paying limited attention to the relevance of process-related barriers. To address this shortcoming, the paper aims to explore and compare how EIA is experienced and perceived by professionals in three South-European countries (Italy, Portugal, and Spain), providing additional insights into EIA process-related barriers in transport projects. The findings were obtained through an online survey of 294 professionals, representing two main stakeholder groups: environmental consultants and transport planners. The results reveal four main types of process problems shared in all three countries: (i) EIA timing, (ii) assessment of alternatives, (iii) monitoring system, and (iv) public participation. The highest divergences are seen in Spain, where 42% of identified process-related barriers are shared with the rest of countries, while Italian and Portuguese respondents agree in the perception of 68% of process-related barriers. The main differences between the barriers identified by transport planners and environmental consultants are related to their assessment of the need for more collaborative work between key actors. It is finally discussed the added value of this research to progress towards the homogenization of EIA processes across countries.  相似文献   

14.
Major developments can result in significant impacts on biodiversity, which the mandated process of environmental impact assessment (EIA) aims to mitigate. There has been a recent move towards the application of biodiversity offsets as a last-resort, compensatory measure when options at the earlier stages in the mitigation hierarchy of avoidance, minimisation and restoration have been exhausted. Guidance on biodiversity offset planning available in different jurisdictions, however, demonstrates a lack of consensus about when biodiversity offsets should be formally introduced into the EIA process, and previous research has highlighted the perceived risks associated with commencing detailed offset planning too early as well as too late. Here we explore the implications of how and when offset considerations are introduced within EIA. We do this by reviewing and synthesising best practice principles for biodiversity offsets from the international literature, and then exploring how and when offsets were considered in a number of case studies that draw on documentary analysis and interviews with key role players. Our case studies are based in South Africa where regional guidance on offsets exists, supporting a body of practice. The research finds that the timing of involvement of biodiversity specialists is critical in determining whether considering offsets early will reap the combined benefits of: transparency and stakeholder engagement; guaranteeing the offset before development commences; and offset enforceability without jeopardising adherence to the mitigation hierarchy. Bypassing the mitigation hierarchy was perceived as allowing proponents to ‘buy’ approvals for developments that might otherwise be found unacceptable, although there was no evidence for this in any of the case studies evaluated. Although some of our findings may be specific to the South African context, the approach taken using international best practice principles for biodiversity offsets as a benchmark can equally be applied to evaluate practice in other EIA systems. We confirm the utility of this approach by evaluating the recently released South African Draft National Biodiversity Offset Policy for its potential to support best practice biodiversity offsets in EIA.  相似文献   

15.
This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance.  相似文献   

16.
Current political discussions and developments indicate the importance and urgency of incorporating climate change considerations into EIA processes. The recent revision of the EU Directive 2014/52/EU on Environmental Impact Assessment (EIA) requires changes in the EIA practice of the EU member states. This paper investigates the extent to which the Environmental Impact Assessment (EIA) can contribute to an early consideration of climate change consequences in planning processes. In particular the roles of different actors in order to incorporate climate change impacts and adaptation into project planning subject to EIA at the appropriate levels are a core topic. Semi-structured expert interviews were carried out with representatives of the main infrastructure companies and institutions responsible in these sectors in Austria, which have to carry out EIA regularly. In a second step expert interviews were conducted with EIA assessors and EIA authorities in Austria and Germany, in order to examine the extent to which climate-based changes are already considered in EIA processes. This paper aims to discuss the different perspectives in the current EIA practice with regard to integrating climate change impacts as well as barriers and solutions identified by the groups of actors involved, namely project developers, environmental competent authorities and consultants (EIA assessors/practitioners). The interviews show that different groups of actors consider the topic to different degrees. Downscaling of climate change scenarios is in this context both, a critical issue with regards to availability of data and costs. Furthermore, assistance for the interpretation of relevant impacts, to be deducted from climate change scenarios, on the specific environmental issues in the area is needed. The main barriers identified by the EIA experts therefore include a lack of data as well as general uncertainty as to how far climate change should be considered in the process without reliable data but in the presence of knowledge about possible consequences at an abstract level. A joint strategy on how to cope with uncertain prognoses about main impacts on environmental issues for areas without reliable data requires a discussion and cooperation between EIA consultants and environmental authorities.  相似文献   

17.
Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as an umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare.  相似文献   

18.
Land take is emerging as a global environmental concern, and is particularly critical in intensively developed and land-scarce regions. This paper seeks to understand the effectiveness of the screening stage of Environmental Impact Assessment (EIA) in addressing land take. Screening is the stage where a decision is made as to whether an EIA is required for a project. In many jurisdictions, screening results in three pathways: full EIA directly, preliminary EIA only, or preliminary EIA followed by full EIA. We compared the land take of 217 projects triggering the different pathways in a study region in Italy over a 15-year time interval. Land take was quantified by overlaying the footprint of the projects with a land cover map.The results show that while more attention was given to projects with larger land take impacts overall, the cumulative land take from smaller projects not triggering full EIA was considerable (40% of overall land take). The case-by-case examination conducted through the preliminary EIA was found to work better for some project types (ski areas and small urban development), than for others (quarries). Our findings lead us to advocate improvements in current screening procedures to ensure that the land take impacts are quantified and made explicit in preliminary EIA reports. Our evidence-based approach to determining land take in EIA provides a compelling basis for understanding ways to improve EIA policies, guidance and practice.  相似文献   

19.
Insufficient implementation and the lack of legislative requirements for follow-up measures following the approval of projects are consistently highlighted as major shortcomings of Environmental Impact Assessment (EIA). Although adopted over 15 years ago by the World Bank, Environmental Management Plans (EMPs) were only semi-formalised in the UK in 2008 and arguably provide a continuous link or ‘bridge’ between the EIA process pre-consent and an Environmental Management System (EMS) post-consent. Drawing on twenty-one semi-structured interviews with stakeholders and thematic analysis of their responses, and a broad-scale practitioner survey, this study aimed to assess the effectiveness of EMPs as an environmental protection tool across the project lifecycle for major developments. The findings revealed a mixed picture of EMP effectiveness in practice, with EMPs only partially fulfilling a bridging role between EIA and EMS. There is no ‘gold standard’ terminology for EMPs, all having slightly different uses, thus presenting different focuses to different stakeholders and further enhancing variation in practice. For many stakeholders, the effectiveness was simply not known, due to the lack of communication and follow-up that still exists. EMP–EMS linkages were shown to be effective from the developer's perspective when a single organisation has involvement across all project phases, though weaknesses occur when multiple parties are involved. Among other stakeholders, knowledge varied significantly; whilst some were in agreement that the linkages worked, many were unaware of the connections and thought of them as two quite separate tools. Stakeholders advocated for the need to make EMPs a legal requirement; for improved communication between stakeholders during EMP implementation and increased documentation of project outcomes; and for EMPs to be consistently written by environmental professionals. Furthermore, weak links in the current process may be improved by providing detailed guidance for organisations on the potential for EMP–EMS linkages, with the additional aim of encouraging stakeholders to broaden their current specialist knowledge on environmental protection tools.  相似文献   

20.
In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it parallel progress in addressing the main shortcomings of EIA/SIA, i.e. insufficient integration of environmental and social factors into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their analysis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of projects which impact on the environment, and consequently to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argues that, in a sociological context of complexity and dynamism, four conceptual elements should underpin approaches to socio-environmental risk and impact assessment in development projects: a theoretical base in actor–network theory; an ethical grounding in values which are internationally recognized (though not always fulfilled in practice); a (new) epistemological-scientific base; and a methodological foundation in social participation.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号