首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 468 毫秒
1.
2.
The magnitude and composition of a region’s construction and demolition (C&D) debris should be understood when developing rules, policies and strategies for managing this segment of the solid waste stream. In the US, several national estimates have been conducted using a weight-per-construction-area approximation; national estimates using alternative procedures such as those used for other segments of the solid waste stream have not been reported for C&D debris. This paper presents an evaluation of a materials flow analysis (MFA) approach for estimating C&D debris generation and composition for a large region (the US). The consumption of construction materials in the US and typical waste factors used for construction materials purchasing were used to estimate the mass of solid waste generated as a result of construction activities. Debris from demolition activities was predicted from various historical construction materials consumption data and estimates of average service lives of the materials. The MFA approach estimated that approximately 610–780 × 106 Mg of C&D debris was generated in 2002. This predicted mass exceeds previous estimates using other C&D debris predictive methodologies and reflects the large waste stream that exists.  相似文献   

3.
During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented in practice.  相似文献   

4.
During the past decades, construction and demolition (C&D) waste issues have received increasing attention from both practitioners and researchers around the world. A plethora of research relating to C&D waste management (WM) has been published in scholarly journals. However, a comprehensive understanding of the C&D WM research is somehow absent in spite of its proliferation. The aim of this paper is to develop a framework that helps readers understand the C&D WM research as archived in selected journals. Papers under the topic of C&D WM are retrieved based on a set of rigorous procedures. The information of these papers is then analyzed with the assistance of the Qualitative Social Research (QSR) software package NVivo. A framework for understanding C&D WM research is created based on the analytic results. By following the framework, a bibliometric analysis of research in C&D WM is presented, followed by an in-depth literature analysis. It is found that C&D generation, reduction, and recycling are the three major topics in the discipline of C&D WM. Future research is recommended to (a) investigate C&D waste issues in wider scopes including design, maintenance and demolition, (b) develop a unified measurement for waste generation so that WM performance can be compared across various economies, and (c) enhance effectiveness of WM approaches (e.g. waste charging scheme) based on new WM concepts (e.g. Extended Producer Responsibility). In addition to the above research findings, the approach for producing the research framework can be useful references for other studies which attempt to understand the research of a given discipline.  相似文献   

5.
Journal of Material Cycles and Waste Management - The generation of construction and demolition (C&D) waste is increasing, while management of it is a major issue which has detrimental...  相似文献   

6.
Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste.  相似文献   

7.
Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.  相似文献   

8.
One methodology is proposed to estimate the quantification and composition of building-related construction and demolition (C&D) waste in a fast developing region like Shanghai, PR China. The varieties of structure types and building waste intensities due to the requirement of progressive building design and structure codes in different decades are considered in this regional C&D waste estimation study. It is concluded that approximately 13.71 million tons of C&D waste was generated in 2012 in Shanghai, of which more than 80% of this C&D waste was concrete, bricks and blocks. Analysis from this study can be applied to facilitate C&D waste governors and researchers the duty of formulating precise policies and specifications. As a matter of fact, at least a half of the enormous amount of C&D waste could be recycled if implementing proper recycling technologies and measures. The appropriate managements would be economically and environmentally beneficial to Shanghai where the per capita per year output of C&D waste has been as high as 842 kg in 2010.  相似文献   

9.
Quantifying construction and demolition (C&D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C&D waste generation at both regional and project levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteria - waste generation activity, estimation level and quantification methodology. Six categories of existing C&D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested.  相似文献   

10.
The environmental problem posed by construction and demolition waste (C&D waste) is derived not only from the high volume produced, but also from its treatment and disposal. Treatment plants receive C&D waste which is then transformed into a recycled mixed aggregate. The byproduct is mainly used for low-value-added applications such as land escape restoration, despite the high quality of the aggregate. In the present work, the chemical composition properties and grading curve properties of these aggregates are defined. Furthermore, the resulting recycled concrete with a high proportion of recycled composition, from 20% to 100% replacement of fine and coarse aggregate, is characterized physically and mechanically. An environmental study of the new construction material when all aggregates are substituted by C&D waste shows a low toxicity level, similar to that of other construction materials. The new material also has improved properties with respect to standard concrete such as high fire resistance, good heat insulation, and acoustic insulation.  相似文献   

11.
Journal of Material Cycles and Waste Management - Enormous generation of construction and demolition (C&D) waste along with municipal solid waste (MSW) is required to managed properly for...  相似文献   

12.
The construction and demolition (C&D) industry has been identified as a major source of waste. European Union legislation states that, by 2020, 70 % of C&D waste must be prepared for reuse, recycled or recovered. European Union member states must increase their C&D waste recycling percentages in order to meet this binding target. Utilization of mineral wool waste, often considered unrecyclable, could improve the recycling percentage of C&D waste. In this article, mineral wool production and waste volumes are estimated based on information from the Eurostat database. A literature survey is conducted to collect information about mineral wool material properties, current recycling methods, and barriers to recycling of mineral wool, and suitable methods for separating mineral wool from C&D waste streams and the economic viability of mineral wool recycling are discussed. It is noted that accurate estimation of mineral wool waste volumes is problematic due to the fragmented nature of available data. Based on the literature review, current methods for recycling mineral wool waste include utilization of mineral wool waste as a raw material in various products. Barriers to recycling include economic questions and issues related to the purity and health effects of mineral wool waste. Material properties of mineral wool waste, such as fire resistance, could provide improved properties in products utilizing mineral wool waste as a raw material.  相似文献   

13.
In this work, the fraction of construction and demolition waste (C&D waste) complicated and economically not feasible to sort out for recycling purposes is used to produce solid recovered fuel (SRF) through mechanical treatment (MT). The paper presents the mass, energy and material balances of this SRF production process. All the process streams (input and output) produced in MT waste sorting plant to produce SRF from C&D waste are sampled and treated according to CEN standard methods for SRF. Proximate and ultimate analysis of these streams is performed and their composition is determined. Based on this analysis and composition of process streams their mass, energy and material balances are established for SRF production process. By mass balance means the overall mass flow of input waste material stream in the various output streams and material balances mean the mass flow of components of input waste material stream (such as paper and cardboard, wood, plastic (soft), plastic (hard), textile and rubber) in the various output streams of SRF production process. The results from mass balance of SRF production process showed that of the total input C&D waste material to MT waste sorting plant, 44% was recovered in the form of SRF, 5% as ferrous metal, 1% as non-ferrous metal, and 28% was sorted out as fine fraction, 18% as reject material and 4% as heavy fraction. The energy balance of this SRF production process showed that of the total input energy content of C&D waste material to MT waste sorting plant, 74% was recovered in the form of SRF, 16% belonged to the reject material and rest 10% belonged to the streams of fine fraction and heavy fraction. From the material balances of this process, mass fractions of plastic (soft), paper and cardboard, wood and plastic (hard) recovered in the SRF stream were 84%, 82%, 72% and 68% respectively of their input masses to MT plant. A high mass fraction of plastic (PVC) and rubber material was found in the reject material stream. Streams of heavy fraction and fine fraction mainly contained non-combustible material (such as stone/rock, sand particles and gypsum material).  相似文献   

14.
One of the key aspects that must be taken into consideration within the framework of Sustainable Construction is the management of Construction and Demolition (C&D) Debris. As for other types of waste, specific handling procedures are required to manage C&D Debris; these include reduction, reuse, recycling, and if all other possibilities fail, recovery or disposal. For public planning strategies aimed at the management of C&D Debris to be effective, it is first necessary to have specific knowledge of the type of waste materials generated in a particular region. After verifying that the methods available to determine the production and composition of C&D Debris are limited, this paper presents a procedure to ascertain the production and composition of C&D Debris, in any region. The procedure utilizes data on the surface areas of newly constructed buildings, renovations and demolitions, which are estimated from available data for recent years, as well as information on the quantity of debris generated per surface area in any type of construction site, which is obtained from recently executed constructions or from the ground plans of older buildings. The method proposed here has been applied to Galicia, one of Spain’s autonomous communities, for which the quantity and composition of C&D Debris have been estimated for the horizon year 2011.  相似文献   

15.
Managing construction and demolition (C&D) wastes has challenged many municipalities with diminishing waste disposal capacity. Facing such challenges, the Massachusetts Department of Environmental Protection proposed a policy restricting the landfill disposal of certain C&D waste materials, if unprocessed. This research is to study the potential economic impact of such restriction on construction contractors and C&D waste processors. A spreadsheet-based systems analysis model has been developed to assist the cost-benefit evaluation for various C&D waste management scenarios. The model, developed based on the mass balance principle, is designed to track a C&D waste stream through the various stages of a waste management system, i.e. generation, source separation, processing, recycling, and final disposal. This model, by incorporating the material flow data with the cost/revenue data associated with each management activity, can then provide an economic analysis for a proposed C&D waste management scenario. A case study illustrating the application of this model for Massachusetts is also presented.  相似文献   

16.
Construction and demolition (C&D) waste is a pressing issue not only in Malaysia, but it is also a worldwide concern including the developed countries as well. C&D waste should be managed throughout the construction cycle. The concept of circular economy (CE) is an emerging notion that has the potential to be utilized as waste minimization approach. This paper aims to assess the potentials of incorporating the CE concept as an approach to minimizing C&D wastes, by developing a CE-based theoretical framework for C&D waste management in Malaysia. In line with this objective, a systematic review has been conducted to determine how CE can be operationalised as a strategy to minimize wastes, while considering it as a key factor for mitigating the environmental impacts. Based on the literature review, a CE-based theoretical framework has been proposed using Malaysia as a case study. The framework has been developed following a three-layer approach namely micro-, meso-, and macro-levels. Waste minimization strategies have been identified for each level taking into account the main stages in the construction industry, i.e., planning, designing, procurement, construction, and demolition. The different stakeholders involved at each stage and their interactions in the stages have also been identified.  相似文献   

17.
Journal of Material Cycles and Waste Management - In Brazil, municipal public authorities are responsible for construction and demolition (C&D) waste management. However, there is a lack of...  相似文献   

18.
Construction and demolition (C&D) wood frequently contains treated wood including wood treated with chromated copper arsenate (CCA). Many recycling options for such wood require that the product be essentially free of preservative chemicals. The objectives of this study were to document the characteristics of the wood waste stream and to evaluate the effectiveness of sorting methods for identifying treated wood. Sorting methods evaluated included visual sorting and visual sorting augmented with the use of PAN indicator stain and/or hand-held X-ray fluorescence (XRF) units. Experiments were conducted on two types of construction and demolition (C&D) wood: source separated loads containing only C&D wood and wood hand-picked from commingled loads of general C&D waste. Results showed that 77% of the treated wood was CCA-treated. For uncontaminated piles (<1% treated wood) of source separated C&D wood, visual sorting was found to effectively remove the small amounts of treated wood present. For piles of source separated wood that were contaminated (approximately 50% treated wood), visual sorts were not accurate and benefited from augmented sorting using PAN indicator stain. The handheld XRF devices were found to be effective for sorting commingled C&D wood, as PAN indicator stain was not as effective due to the excessive amount of surface dirt associated with commingled wood waste. Visual sorting of source separated wood was estimated to cost between US$21 to US$96 per metric ton. These costs depended upon the amount of treated wood and whether or not augmentation with PAN indicator was necessary. Visual sorting augmented with hand-held XRF units was estimated at US$113 per metric ton. The bulk of these costs were associated with labor. Future efforts should focus on reducing labor costs by mounting automated XRF units on conveyor systems.  相似文献   

19.

Gaza Strip is considered as one of the armed conflicts prone areas in Middle East. Several intensive conflicts occurred in Gaza Strip in 2008, 2012, 2014 and 2021. These conflicts caused massive destroying the infrastructures, facilities, and buildings, which affected all services and activities in Gaza Strip. One of the major post-conflict issues in Gaza strip is the management of resulted demolition waste including its removal, sorting, recycling, and material recovery. In May 2021, over than 370,000 tons of demolition waste composed of rubbles and debris was generated during 11 days of armed conflict. The accumulated previous experience of rubbles and debris removal and recycling in Gaza Strip supported to perform a quick management approach for safe removal of the post-conflict demolition waste and reuse/recycle the resulted waste materials in various applications. The sorting and transporting process of concreate and non-concreate rubble elements of the waste were carried out in cooperation between local and international agencies as emergency recovery-funded projects. The most proportion of rubbles are concrete aggregates, thus, the material recovery was conducted through crushing process for concrete rubbles and then reusing it for road rehabilitation or producing concrete building blocks. The large concrete blocks reused to be placed for shoreline protection for specific area along Gaza beach. The recycling of post-conflict demolition waste management projects in Gaza Strip brought economic and social benefits through the reuse and recycle of resources and creation of job opportunities. In conclusion, although the post-conflict demolition waste management is quite different from municipal/industrial waste management in Gaza Strip, it is conducted through applying similar techniques of disaster waste management in waste removal, and those of construction and demolition (C&D) waste management in sorting, crushing, and sieving for recycling.

  相似文献   

20.
Environmental management of construction and demolition waste in Kuwait   总被引:6,自引:0,他引:6  
There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号