ABSTRACT: An optimal control methodology and computational model are developed to evaluate multi‐reservoir release schedules that minimize sediment scour and deposition in rivers and reservoirs. The sedimentation problem is formulated within a discrete‐time optimal control framework in which reservoir releases represent control variables and reservoir bed elevations, storage levels, and river bed elevations represent state variables. Constraints imposed on reservoir storage levels and releases are accommodated using a penalty function method. The optimal control model consists of two interfaced components: a one‐dimensional finite‐difference simulation module used to evaluate flow hydraulics and sediment transport dynamics, and a successive approximation linear quadratic regulator (SALQR) optimization algorithm used to update reservoir release policies and solve the augmented control problem. Hypothetical two‐reservoir and five‐reservoir networks are used to demonstrate the methodology and its capabilities, which is a vital phase towards the development of a more robust optimal control model and application to an existing multiple‐reservoir river network.  相似文献   

3.
ABSTRACT: Reservoirs, as well as lakes and estuaries, are subject to sediment accumulation. The rate at which sedimentation occurs is accelerated or diminished by man's activities. Acceptable rates of sedimentation are considered on the basis of costs of sediment storage and removal and a review of reservoirs constructed with sediment removal capabilities is given. The rates of reservoir sedimentation in the United States are summarized based on reliable data obtained from all sizes of reservoirs. Problems confronting the engineer concerning reservoir construction and maintenance are discussed on the basis of these data.  相似文献   

4.
Management of Sedimentation in Tropical Watersheds   总被引:2,自引:0,他引:2  
/ The sedimentation of reservoirs is a serious problem throughout the tropics, yet most attempts to control sedimentation in large river basins have not been very successful. Reliable information on erosion rates and sources of sediments has been lacking. In regions where geologically unstable terrain combines with high rainfall, natural erosion rates might be so high that the effects of human activity are limited. Estimates of natural erosion in these situations often have been poor because of the episodic nature of most erosion during large storms and because mass-wasting may supply much of the sediment. The predominance of mass-wasting in some watersheds can result in an unexpectedly high ratio of bedload to suspended load, shifting sedimentation to "live" rather than "dead" storage within reservoirs. Furthermore, the inappropriate use of the Universal Soil Loss Equation to assess the effectiveness of erosion control measures has led to inaccurate estimates of the sediment reduction benefits that could accrue to watershed treatment efforts. Although reducing erosion from cultivated areas is desirable for other reasons, efforts aimed at reducing reservoir sedimentation by controlling agricultural sources of erosion may have limited benefits if the principal sources are of natural origin or are associated with construction of the dams and reservoirs and with rural roads and trails. Finally, the most appropriate locations for watershed rehabilitation depend on the magnitude of temporary storage of colluvium and alluvium within the river basin: Where storage volume is large and residence time of sediment very long, reducing agricultural erosion may have limited impacts on sedimentation within the expected life of a reservoir. Systematic development and analysis of sediment budgets for representative watersheds is needed to address these limitations and thereby improve both the planning of river basin development schemes and the allocation of resources towards reducing sedimentation. When sedimentation of reservoirs is the key issue, sediment budgets must focus especially on channel transport rates and sediment delivery from hillsides. Sediment budgets are especially critical for tropical areas where project funds and technical help are limited. Once sediment budgets are available, watershed managers will be able to direct erosion control programs towards locations where they will be most effective. KEY WORDS: Tropical watersheds; Sedimentation; Reservoirs; Erosion control  相似文献   

5.
Economics of reservoir sedimentation and sustainable management of dams   总被引:2,自引:0,他引:2  
Accepted practice has been to design and operate reservoirs to fill with sediment, generating benefits from remaining storage over a finite period of time. The consequences of sedimentation and project abandonment are left to the future. This 'future' has already arrived for many existing reservoirs and most others will eventually experience a similar fate, thereby imposing substantial costs on society. Such costs could be avoided if sedimentation was minimized and dams were allowed to live forever. The fact that the world's inventory of suitable reservoir sites is limited provides an additional reason for encouraging the sustainable management of dams. This paper provides a framework for assessing the economic feasibility of sediment management strategies that would allow the life of dams to be prolonged indefinitely. Even if reduced accumulation or removal of sediment is technically possible, its economic viability is likely to depend on physical, hydrological and financial parameters. The model presented incorporates such factors and allows a characterization of conditions under which sustainable management would be desirable. The empirical implementation of the model draws upon the substantial amount of technical information available. We analyze the sustainability of reservoirs, with a focus on the trade-off between such sustainability and the short to medium term benefits which a reservoir is expected to produce. The results show that, for a very wide range of realistic parameter values, sustainable management of reservoirs is economically more desirable than the prevailing practice of forcing a finite reservoir life through excessive sediment accumulation.  相似文献   

6.
ABSTRACT: Many approaches are available for operation of a multipurpose reservoir during flood season; one of them is allocation of storage space for flood control. A methodology to determine a reservoir operation policy based on explicit risk consideration is presented. The objective of the formulation is to maximize the reservoir storage at the end of a flood season while ensuring that the risk of an overflow is within acceptable limits. The Dynamic Programming technique has been used to solve the problem. This approach has been applied to develop operation policies for an existing reservoir. The performance of the policy was evaluated through simulation and was found to be satisfactory.  相似文献   

7.
Forty‐five flood control reservoirs, authorized in the Watershed Protection and Flood Prevention Act 1954, were installed by United States Department of Agriculture (USDA) between 1969 and 1982 in the Little Washita River Experimental Watershed (LWREW), located in central Oklahoma. Over time, these reservoirs have lost sediment and flood storage capacity due to sedimentation, with rates dependent on upstream land use and climate variability. In this study, sedimentation rates for 12 reservoirs representing three major land use categories within LWREW were measured based on bathymetric surveys that used acoustic profiling system. Physiographic and climate attributes of drainage area of surveyed reservoirs were extracted from publicly available data sources including topographic maps, digital elevation models, USDA Natural Resource Conservation Service soils, and weather station databases. Correlation, principal component analysis, and stepwise regression were utilized to analyze the relationship between normalized reservoir sedimentation rates (ReSRa) and the drainage area characteristics to determine the major variables controlling sedimentation within the LWREW. Percent of drainage area with extreme slopes, saturated hydraulic conductivity, and maximum daily rainfall event recorded in spring explained most of the variability in ReSRa. It was also found that percent reduction in reservoir surface area can be used as a surrogate for estimating ReSRa. The implications of the results are discussed.  相似文献   

8.
ABSTRACT: A new method has been developed for estimating future reservoir storage capacities, allowing for sediment deposition and compaction. Reservoir sedimentation surveys for 117 reservoirs, conducted by the Illinois State Water Survey over the past 60 years, were used to determine regional constants K to represent the severity of sediment deposition in the reservoirs. More than half of the 82 water supply reservoirs investigated had records of reservoir sedimentation surveys, and their K values were calculated by using data from those sediment surveys. The average K values of the remaining non-surveyed water supply reservoirs were estimated from the regional distribution of the K values. Other important factors considered in the estimation of future reservoir storage capacities are the trap efficiency of the reservoirs and the variation of density of sediment deposits due to compaction. The model can also be used for analyzing the economics of alternative sites and of design features that can be incorporated in dams for reducing reservoir sedimentation.  相似文献   

9.
This is a study of the scientific component of an effort to restore an urban river by removing a low-head dam. The Secor Dam is owned by a local government entity near Toledo, Ohio. The proposed removal of the last structure impeding flow on the Ottawa River has broad appeal, but the owner is concerned about liability issues, particularly potential changes to the flood regime, the presence of contaminated sediments behind the dam, and possible downstream transport of reservoir sediments. Assessing sediment contamination involved sediment sampling and analysis of trace metals and organic contaminants. Forecasting sediment transport involved field methods to determine the volume and textural properties of reservoir and upstream sediment and calculations to determine the fate of reservoir sediments. Forecasting changes in the flood regime involved HEC-RAS hydrological models to determine before and after dam removal flood scenarios using LiDAR data imported into an ArcGIS database. The resulting assessment found potential sediment contamination to be minor, and modeling showed that the removal of the dam would have minimal impacts on sediment transport and flood hazards. Based on the assessment, the removal of the dam has been approved by its owners.  相似文献   

10.
11.
为了揭示悬浮泥沙(SSC)对水库水质的影响规律,对汾河水库进行样品收集和长期水质监测,采用水动力模型与泥沙转移和富营养化模型相结合的方法,将这三者关联耦合,并通过实测数据对模型进行参数率定和验证,分析含沙水和不含沙水中总氮(TN)、总磷(TP)、叶绿素a(Chla)、溶解氧(DO)四项指标,得出两者对水质造成的影响。结果表明:SSC对TN、TP的去除作用明显,对Chla、DO浓度分布影响较小,并计算了污染物的释放量以及贡献率,得出TP的负荷仅为16.47t,而贡献率高达25.25%。因此在汾河的污染控制方面应侧重削减磷,进而改善汾河地区的污染现状。  相似文献   

12.
为了揭示悬浮泥沙(SSC)对水库水质的影响规律,对汾河水库进行样品收集和长期水质监测,采用水动力模型与泥沙转移和富营养化模型相结合的方法,将这三者关联耦合,并通过实测数据对模型进行参数率定和验证,分析含沙水和不含沙水中总氮(TN)、总磷(TP)、叶绿素a(Chla)、溶解氧(DO)四项指标,得出两者对水质造成的影响。结果表明:SSC对TN、TP的去除作用明显,对Chla、DO浓度分布影响较小,并计算了污染物的释放量以及贡献率,得出TP的负荷仅为16.47t,而贡献率高达25.25%。因此在汾河的污染控制方面应侧重削减磷,进而改善汾河地区的污染现状。  相似文献   

13.
ABSTRACT: Operation of a storage‐based reservoir modifies the downstream flow usually to a value higher than that of natural flow in dry season. This could be important for irrigation, water supply, or power production as it is like an additional downstream benefit without any additional investment. This study addresses the operation of two proposed reservoirs and the downstream flow augmentation at an irrigation project located at the outlet of the Gandaki River basin in Nepal. The optimal operating policies of the reservoirs were determined using a Stochastic Dynamic Programming (SDP) model considering the maximization of power production. The modified flows downstream of the reservoirs were simulated by a simulation model using the optimal operating policy (for power maximization) and a synthetic long‐term inflow series. Comparing the existing flow (flow in river without reservoir operation) and the modified flow (flow after reservoir operation) at the irrigation project, the additional amount of flow was calculated. The reliability analysis indicated that the supply of irrigation could be increased by 25 to 100 percent of the existing supply over the dry season (January to April) with a reliability of more than 80 percent.  相似文献   

14.
ABSTRACT: Ground water is a vital resource in the Yun-Lin area of Taiwan. A substantial amount is continuously extracted, creating adverse effects such as land subsidence and seawater intrusion. Minimizing these negative impacts depends on regulating the rate of groundwater withdrawal. An optimal yield must be determined to establish a sound water management policy. A wide range of safe yields for Yun-Lin have already been proposed based on constant hydrological and hydrogeological parameters. By extending the results of those investigations, this study presents a decision analysis model. The optimal yield concept is introduced as well. The proposed model incorporates a probability density function for rainfall recharge and a loss function, derived from fluctuations in the ground water table. Through decision analysis, the optimum yield is obtained by minimizing the expected value of the loss function. The optimal yield varies monthly because the probability density function is time dependent. Analysis results suggest that the cumulative optimum yield of ground water in the area is 1.26 × 108 m3/year. If the probability distribution function for rainfall recharge is modified as new precipitation data become available, the above suggested yield may require revision in the future.  相似文献   

15.
16.
ABSTRACT: An heuristic iterative technique based upon stochastic dynamic programming is presented for the analysis of the operation of a three reservoir ‘Y’ shaped hydroelectric system. The technique is initiated using historical inflow data for the downstream reservoir. At each iteration the optimal policies for the downstream hydroelectric generating unit are used to provide relative weightings or targets for operation of upstream reservoirs. New input inflows to the downstream reservoir are then obtained by running the historical streamflow record through the optimal policies for the upstream reservoirs. These flows are then used to develop a new operating policy for the downstream reservoir and hence new targets for the upstream reservoirs. The process is continued until the operating policies for each reservoir provide the same overall system benefit for two successive iterations. Results obtained from the procedure are compared to the results obtained by historical operation of the system. The procedure is shown to develop operating policies which give benefits which are as close to the historical benefits as can be expected given the choice of the number of storage state variables.  相似文献   

17.
ABSTRACT: There is a pressing need for tools to predict the rates, magnitudes, and mechanisms by which sediment is removed from a reservoir following dam removal, as well as for tools to predict where this sediment will be deposited downstream and how it will impact downstream channel morphology. In the absence of adequate empirical data, a good initial approach is to examine the impacts of dam removal within the context of the geomorphic analogies of channel evolution models and sediment waves. Channel changes at two dam breaching sites in Wisconsin involved a succession of channel forms and processes consistent with an existing channel evolution model. Sediment transported downstream after removal of other dams suggests that reservoir sediment may be translated downstream either as a distinct wave or gradually eroded away. More extensive data collection on existing dam removals is warranted before undertaking the removal of a large number of dams. However, if removal is to proceed based on current knowledge, then geomorphic analogies can be used as the foundation for sediment management and stabilization schemes.  相似文献   

18.
ABSTRACT: As coal resources are developed in the Northern Great Plains regions, new reservoirs are being considered to meet expanding water demands. The amount of water available for industrial diversion, however, could be limited by regulations that require minimum flow levels to be maintained downstream of the reservoir sites. Computer simulations of potential reservoirs were used to determine to what extent, if any, instream flow requirements might limit the ability of reservoirs to deliver industrial water supplies. Data on instream flow requirements, potential reservoir sites, and historic runoff were input for the simulation of the Powder River Region of Montana and Wyoming. Results of the simulations compared the maximum amount of water available for industrial diversion with and without requiring instream flow criteria.  相似文献   

19.
20.
River basin computer simulation studies often do not properly include the complex legal and institutional factors governing water allocation. These factors include formal water rights and informal borrowing agreements among the basin water users. An attempt has been made in this study to show that such factors can be included. We also show that an optimal, integrated approach to reservoir operations in a river basin can do much to alleviate the burden of new demands placed on available water resources. The procurement of a firm water supply for a proposed coal fired power plant is analyzed as a case study. An efficient river basin simulation model is used to determine the viability of a scheme for providing an annual firm water supply to the plant, with consideration of the existing water storage and demands within the basin. Given the hydrologic sequence considered, the model results show that the proposed strategy is viable in that the required firm water supply can be realized without causing harm to decreed water users in the basin. However, integrated diversion and reservoir operations are required to assure a desirable uniform rate of delivery of reusable effluent to the power plant.  相似文献   