首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
ABSTRACT: The rehabilitation of urban stream channels and riparian areas involves a potentially large number of design alternatives. When substantial modifications are planned, water surface profile models (e.g., HEC-2) provide a means for a thorough and efficient evaluation of many design variations. The rehabilitation of a reach of Paradise Creek, Idaho, utilized the REC-2 model to verify the appropriateness of a new channel geometry and explore the consequences of variable floodplain geometries and excavation depths. The desirability of habitat diversity, coupled with the constraints of minimized earthwork costs and adequate flow capacity, framed the floodplain design question. The final design geometry was iteratively approached using the HEC-2 model to mimic the existing channel capacity. This modeling framework produces as output computed water surface elevations for the design channel and floodplain under any discharge. Hence, the method provides the means for demonstrating that rehabilitation designs will (or will not) cause increases in flood elevations, an assessment that is generally required for project approval.  相似文献   

2.
Densmore, Roseann V. and Kenneth F. Karle, 2009. Flood Effects on an Alaskan Stream Restoration Project: The Value of Long‐Term Monitoring. Journal of the American Water Resources Association (JAWRA) 45(6):1424‐1433. Abstract: On a nationwide basis, few stream restoration projects have long‐term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long‐term and event‐based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long‐term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross‐sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25‐year flood on the stream and floodplain geometry and riparian vegetation. The long‐term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.  相似文献   

3.
Abstract: The effect of stream restoration on hyporheic functions has been neglected, although channel rehabilitation projects have a potential to alter stream‐ground‐water interactions. The present study examined the effect of an artificially constructed gravel bar and re‐meandered stream channel on lateral hyporheic exchange flow and chemistry in two lowland N‐rich streams in southern Ontario, Canada. Nitrate concentrations were relatively high, ranging from 0.5 to 1.3 mg N/l in both streams during spring through fall months. However, nitrate concentrations showed a steep decline as stream water entered the gravel bar and the meander bends. Differences between observed and predicted nitrate concentrations based on conservative ion concentration patterns indicated that 40‐100 and 68‐98% of the nitrate entering the hyporheic zone was removed in the gravel bar and meanders, respectively. Rapid depletion of dissolved oxygen concentrations along lateral hyporheic flow paths and denitrifying potentials assayed by the acetylene block technique in hyporheic sediments suggests that denitrification was an important mechanism of nitrate depletion. Despite the high rate of nitrate removal, the flux of stream water laterally entering the constructed gravel bar and meander bends was very small, and hyporheic nitrate removal was <0.015% of the daily stream load during base‐flow periods in summer and fall. The effects of restoration projects on hyporheic zone dynamics are often limited in lowland streams by low channel gradients and fine floodplain sediments with low interstitial flows that restrict the magnitude of the stream‐hyporheic connection.  相似文献   

4.
Geomorphic, hydraulic and hydrologic principles are applied in the design of a stable stream channel for a badly disturbed portion of Badger Creek, Colorado, and its associated riparian and meadow complexes. The objective is to shorten the period of time required for a channel in coarse alluvium to recover from an impacted morphologic state to a regime condition representative of current watershed conditions. Channel geometry measurements describe the stream channel and the normal bankfull stage in relatively stable reaches. Critical shear stress equations were used to design a stable channel in noncohesive materials with dimensions which approximate those of less disturbed reaches. Gabion controls, spaced at approximately 300 m intervals, are recommended to help reduce the chance of lateral migration of the newly constructed channel. Controls are designed to allow for some vertical adjustment of the channel bed following increased bank stability due to revegetation. The flood plain is designed to dissipate flood flow energy and discourage multiple flood channels. The channel has approximately a 90 percent chance of remaining stable the first two years following construction, the time estimated for increased stability to occur due to revegetation.  相似文献   

5.
ABSTRACT: The designs of stream channel naturalization, rehabilitation, and restoration projects are inherently fraught with uncertainty. Although a systematic approach to design can be described, the likelihood of success or failure of the design is unknown due to uncertainties within the design and implementation process. In this paper, a method for incorporating uncertainty in decision‐making during the design phase is presented that uses a decision analysis method known as Failure Modes and Effects Analysis (FMEA). The approach is applied to a channel rehabilitation project in north‐central Pennsylvania. FMEA considers risk in terms of the likelihood of a component failure, the consequences of failure, and the level of difficulty required to detect failure. Ratings developed as part of the FMEA can provide justification for decision making in determining design components that require particular attention to prevent failure of the project and the appropriate compensating actions to be taken.  相似文献   

6.
Complex relationships between stream functions and processes make evaluation of stream modification projects difficult. Informed by vague objectives and minimal monitoring data, post‐construction project evaluations can often be a subjective attribution of success or failure. This article provides a simple framework to rapidly describe the degree of damage in stream modification projects performed in constrained settings. Based on widely accepted evaluations of physical habitat quality and stream stability, the damage states framework describes a continuum of damage in multiple categories that relate natural stream functions to the often desired state of static equilibrium. Given that channel form is closely related to stream function, it follows that changes to the channel form result in changes in function. The damage states focus on damage to flow hydraulics, sediment transport and channel equilibrium, hydraulic, and geomorphic parameters that describe basic stream functioning and support higher level functions in the modified channel. The damage states can be used in decision making as a systematic method to determine the need for repair and design adjustments.  相似文献   

7.
River flooding impacts human life and infrastructure, yet provides habitat and ecosystem services. Traditional flood control (e.g., levees, dams) reduces habitat and ecosystem services, and exacerbates flooding elsewhere. Floodplain restoration (i.e., bankfull floodplain reconnection and Stage 0) can also provide flood management, but has not been sufficiently evaluated for small frequent storms. We used 1D unsteady Hydrologic Engineering Center's River Analysis System to simulate small storms in a 5 km-long, second-order generic stream from the Chesapeake Bay watershed, and varied % channel restored (starting at the upstream end), restoration location, restoration bank height (distinguishes bankfull from Stage 0 restoration), and floodplain width/Manning's n. Stream restoration decreased (attenuated) peak flow up to 37% and increased floodplain exchange by up to 46%. Floodplain width and % channel restored had the largest impact on flood attenuation. The incremental effects of new restoration projects on flood attenuation were greatest when little prior restoration had occurred. By contrast, incremental effects on floodplain exchange were greatest in the presence of substantial prior restoration, setting up a tradeoff. A similar tradeoff was revealed between attenuation and exchange for project location, but not bank height or floodplain width. In particular, attenuation and exchange were always greater for Stage 0 than for bankfull floodplain restoration. Stage 0 thus may counteract human impacts such as urbanization.  相似文献   

8.
A 0.9 km-reach of Uvas Creek, California, was reconstructed as a sinuous, meandering channel in November 1995. In February 1996, this new channel washed out. We reviewed project documents to determine the basis for the project design and conducted our own historical geomorphological study to understand the processes operating in the catchment and project reach. The project was designed using a popular stream classification system, based on which the designers assumed that a "C4" channel (a meandering gravel-bed channel) would be stable at the site. Our historical geomorphological analysis showed that the reach had been braided historically, typical of streams draining the Franciscan Formation in the California Coast Ranges, with episodic flows and high sand and gravel transport. After the project washed out, Uvas Creek reestablished an irregular, braided sand-and-gravel channel, although the channel here was narrower than it had been historically, probably due to such factors as incision caused by gravel mining. Our study casts doubt on several assumptions common in many stream restoration projects: that channel stability is always an appropriate goal; that channel forms are determined by flows with return periods of about 1.5 years; that a channel classification system is an easy, appropriate basis for channel design; and that a new channel form can be imposed without addressing the processes that determine channel form.  相似文献   

9.
ABSTRACT: Streambank protection projects are intended to prevent streambank erosion, thereby preventing streambank failure and maintaining a desirable channel alignment. Streambank erosion is a natural process of unaltered, dynamic river systems, and protection projects seek to impose stability on this natural system. The environmental impacts of such projects are primarily changes to terrestrial and aquatic habitats and to aesthetics. Adverse environmental impacts have been minimized and enhancement of existing habitat and aesthetics have been achieved through the development of new, innovative designs or modifications to existing designs and through use of construction and maintenance practices that promote habitat and aesthetics. Designs based on channel flow characteristics, e.g., revetments using a variety of structural materials, can result in preservation of wildlife habitat by reducing the use of structural protection by matching the erosion potential of flow at the bank with the protection capability of the materials used. Designs based on streambed stabilization prevent bank failure caused by bank undermining, result in preservation or establishment of streamside vegetation, and enhance aesthetics. Protection schemes that manage and preserve floodplains, berms, and riparian areas preserve the natural condition of the floodplain area. Designs based on deflection of erosive flows, e.g., dikes, minimize disturbance to the bank vegetation and create low-velocity aquatic habitats. Use of vegetation for bank protection is most effective when used in combination with structural components. Construction and maintenance practices can be scheduled and modified to minimize impacts to floodplain areas and to enhance wildlife habitat while preserving the integrity of the protection structure.  相似文献   

10.
This study demonstrates the integration of rehabilitation and flood management planning in a steep, boulder-bedded stream in a coastal urban catchment on the South Island of New Zealand. The Water of Leith, the primary stream flowing through the city of Dunedin, is used as a case study. The catchment is steep, with a short time of concentration and rapid hydrologic response, and the lower stream reaches are highly channelized with floodplain encroachment, a high potential for debris flows, significant flood risks, and severely degraded aquatic habitat. Because the objectives for rehabilitation and flood management in urban catchments are often conflicting, a number of types of analyses at both the catchment and the reach scales and careful planning with stakeholder consultation were needed for successful rehabilitation efforts. This included modeling and analysis of catchment hydrology, fluvial geomorphologic assessment, analysis of water quality and aquatic ecology, hydraulic modeling and flood risk evaluation, detailed feasibility studies, and preliminary design to optimize multiple rehabilitation and flood management objectives. The study showed that all of these analyses were needed for integrated rehabilitation and flood management and that some incremental improvements in stream ecological health, aesthetics, and public recreational opportunities could be achieved in this challenging environment. These methods should be considered in a range of types of stream rehabilitation projects.  相似文献   

11.
Given the unique biogeochemical, physical, and hydrologic services provided by floodplain wetlands, proper management of river systems should include an understanding of how floodplain modifications influence wetland ecosystems. The construction of levees can reduce river–floodplain connectivity, yet it is unclear how levees affect wetlands within floodplains, let alone the cumulative impacts within an entire watershed. This paper explores spatial relationships between levee and floodplain wetland systems in the Wabash Basin, United States. We used a hydrogeomorphic floodplain delineation technique to map floodplain extents and identify wetlands that may be hydrologically connected to river networks. We then spatially examined the relationship between levee presence, wetland area, and other river network attributes within discrete subbasins. Our results show that cumulative wetland area is relatively constant in subbasins that contain levees, regardless of maximum stream order within the subbasin. In subbasins that do not contain levees, cumulative wetland area increases with maximum stream order. However, we found that wetland distributions around levees can be complex, and further studies on the influence of levees on wetland habitat may need to consider finer resolution spatial scales.  相似文献   

12.
Abstract: Despite widespread interest, few sediment budgets are available to document patterns of erosion and sedimentation in developing watersheds. We assess the sediment budget for the Good Hope Tributary, a small watershed (4.05 km2) in Montgomery County, Maryland, from 1951‐1996. Lacking monitoring data spanning the period of interest, we rely on a variety of indirect and stratigraphic methods. Using regression equations relating sediment yield to construction, we estimated an upland sediment production of 5,700 m3 between 1951 and 1996. Regression equations indicate that channel cross‐sectional area is correlated with the extent of development; these relationships, when combined with historical land use data, suggest that upland sediment yield was augmented by 6,400 m3 produced by enlargement of first‐order and second‐order stream channels. We used dendrochronology to estimate that 4,000 m3 of sediment was stored on the floodplain from 1951‐1996. The sediment yield from the watershed, obtained by summing upstream contributions, totals 8,100 m3 of sediment, or 135 tons/km2/year. These results indicate that upland erosion, channel enlargement, and floodplain storage are all significant components of the sediment budget of our study area, and all three are approximately equal in magnitude. Erosion of “legacy” floodplain sediments originally deposited during poor agricultural practices of the 19th and early 20th Centuries has likely contributed between 0 and 20% of the total sediment yield, indicating that these remobilized deposits are not a dominant component of the sediment yield of our study area.  相似文献   

13.
ABSTRACT: The purpose of this literature review is to identify and quantify the effects of channelization and to examine the feasibility and acceptability of alternative methods of flood control. In the past 150 years, over 200,000 miles of stream channels have been modified. Channelization can affect the environment by draining wetland, cutting off oxbows and meanders, clearing floodplain hardwoods, lowering ground water levels, reducing ground water recharge from stream flow, and increasing erosion sedimentation, channel maintenance, and downstream flooding. Channelization reduces the size, number, and species diversity of fish in streams. In a wet climate, the fishery requires less than 10 years to fully recover. However, in the drier climates, the fishery may never fully recover. In general, channel modifications have performed as designed for flood abatement. The Arthur D. Little Study (1973) reported that direct benefits estimated during channelization planning have been conservative and that damage reduction has been impressive. Diking seems to be a viable alternative to channel dredging. Dikes minimize destruction of wetland and eliminate the need for removing vegetation from the existing stream banks.  相似文献   

14.
ABSTRACT: Stability of vegetated and bare riprap revetments along a Sacramento River reach during the flood of record was assessed. Revetment damages resulting from the flood were identified using records provided by the U.S. Army Corps of Engineers and verified by contacts with local interests. Vegetation on revetments along a 35.6-mile reach was mapped using inspection records and stereo interpretation of aerial phoths taken shortly before and after the flood. A follow-up field inspection was conducted in September 1989. Revetment age, material, bank curvature, vegetation, and damage were mapped from a boat. Mapping results from both 1986 and 1989 were placed in a data base. About 70 percent of the bank line of the study reach was revetted. About two-thirds of the revetment was cobble; one-third was quarry stone. Revetment vegetation varied from none to large (> 50-inch diameter) cotton-woods. About 10 percent of the revetted bank line supported some type of woody vegetation. Damage rates for revetments supporting woody vegetation tended to be lower than for unvegetated revetments of the same age located on banks of similar curvature. Chisquared tests indicated damage rates were greater for older (pre-1950 construction) revetments, but were unable to detect differences based on vegetation or bank curvature. Research is needed to generate design criteria and construction techniques to allow routine use of woody plants in bank protection structures.  相似文献   

15.
ABSTRACT: Incised channels are caused by an imbalance between sediment transport capacity and sediment supply to the stream. The resulting bed and bank erosion alter channel morphology and stability. Geomorphological models of incised channel evolution can provide guidance in the selection of engineering design alternatives for incised channel rehabilitation. This paper describes how incised channel evolution models may be coupled with a dimensionless stability diagram to facilitate evaluation of rehabilitation alternatives. In combination, the models provide complementary views of channel processes from geomorphic and engineering perspectives.  相似文献   

16.
ABSTRACT: Urban development has compromised the quality of physical elements offish habitat in low‐order spawning and rearing streams. In order to identify where priorities should lie in stream rehabilitation, field surveys of a number of streams were conducted near Vancouver, British Columbia. All of the streams were located in watersheds which were urbanized approximately 20 years earlier. The study watersheds ranged from 5 to 77 percent total impervious area (percent TIA). The urban streambeds were found to have less fine material and slightly higher values of intragravel dissolved oxygen than in rural streams. This improved gravel quality is attributed to the higher peak flows generated by impervious areas, and the reduced recruitment of fine material in the urban watersheds. Summer base flow was uniformly low when imperviousness was above 40 percent, evidenced by a decrease in velocity rather than water depth. Large woody debris (LWD) was scarce in all streams with > 20 percent TIA. A healthy buffer zone and abundant LWD were found to stabilize stream banks. The introduction of LWD is considered the most important strategy for stream rehabilitation. Stormwater detention ponds, in contrast, are concluded to have few hydrological benefits if constructed after a stream has reached its urban equilibrium.  相似文献   

17.
ABSTRACT: Bank erosion along a river channel determines the pattern of channel migration. Lateral channel migration in large alluvial rivers creates new floodplain land that is essential for riparian vegetation to get established. Migration also erodes existing riparian, agricultural, and urban lands, sometimes damaging human infrastructure (e.g., scouring bridge foundations and endangering pumping facilities) in the process. Understanding what controls the rate of bank erosion and associated point bar deposition is necessary to manage large alluvial rivers effectively. In this study, bank erosion was proportionally related to the magnitude of stream power. Linear regressions were used to correlate the cumulative stream power, above a lower flow threshold, with rates of bank erosion at 13 sites on the middle Sacramento River in California. Two forms of data were used: aerial photography and field data. Each analysis showed that bank erosion and cumulative effective stream power were significantly correlated and that a lower flow threshold improves the statistical relationship in this system. These correlations demonstrate that land managers and others can relate rates of bank erosion to the daily flow rates of a river. Such relationships can provide information concerning ecological restoration of floodplains related to channel migration rates as well as planning that requires knowledge of the relationship between flow rates and bank erosion rates.  相似文献   

18.
This paper recounts our predictions of channel evolution of the Black Vermillion River (BVR) and sediment yields associated with the evolutionary sequence. Channel design parameters allowed for the prediction of stable channel form and coincident sediment yields. Measured erosion rates and basin‐specific bank erosion curves aided in prediction of the stream channel succession time frame. This understanding is critical in determining how and when to mitigate a myriad of instability consequences. The BVR drains approximately 1,062 km2 in the glaciated region of Northeast Kansas. Once tallgrass prairie, the basin has been modified extensively for agricultural production. As such, channelization has shortened the river by nearly 26 km from pre‐European dimensions; shortening combined with the construction of numerous flow‐through structures have produced dramatic impacts on discharge and sediment dynamics. Nine stream reaches were established within three main tributaries of the BVR in 2007. Reaches averaged 490 m in length, were surveyed, and assessed for channel stability, while resurveys were conducted annually through 2010 to monitor change. This work illustrates the association of current stream state, in‐channel sediment contributions, and prediction of future erosion rates based on stream evolution informed by multiple models. Our findings suggest greater and more rapid sedimentation of a federal reservoir than has been predicted using standard sediment prediction methods.  相似文献   

19.
Abstract: Natural channel designs often incorporate rigid instream structures to protect channel banks, provide grade control, promote flow deflection, or otherwise improve channel stability. The long term impact of rigid structures on natural stream processes is relatively unknown. The objective of this study was to use long term alluvial channel modeling to evaluate the effect of rigid structures on channel processes and assess current and future stream channel stability. The study was conducted on Oliver Run, a small stream in Pennsylvania relocated due to highway construction. Field data were collected for one year along the 107 m reach to characterize the stream and provide model input, calibration, and verification data. FLUVIAL-12 was used to evaluate the long term impacts of rigid structures on natural channel adjustment, overall channel stability, and changing form and processes. Based on a consideration of model limitations and results, it was concluded that the presence of rigid structures reduced channel width-to-depth ratios, minimized bed elevation changes due to long term aggradation and degradation, limited lateral channel migration, and increased the mean bed material particle size throughout the reach. Results also showed how alluvial channel modeling can be used to improve the stream restoration design effort.  相似文献   

20.
Effects of channel incision on base flow stream habitats and fishes   总被引:2,自引:0,他引:2  
Channel incision is a widespread phenomenon that results in stream and riparian habitat degradation. Fishes and physical habitat variables were sampled at base flow from three incised stream channels and one reference stream in northwest Mississippi, USA, to quantify incision effects on fish habitat and provide a basis for habitat rehabilitation planning and design. Incised channels were sampled in spring and autumn; the reference channel was sampled only in the autumn. Incised channel habitat quality was inferior to the reference channel despite the presence of structures designed to restore channel stability. Incised channels had physical habitat diversity levels similar to a nonincised reference channel, but contained fewer types of habitat. At base flow, incised channels were dominated by shallow, sandy habitats, moderate to high mean local Froude numbers, and had relatively little organic debris in their beds. In contrast, the reference stream had greater mean water depth, contained more woody debris, and provided more deep pool habitat. Fish assemblages in incised channels were composed of smaller fishes representing fewer species relative to the reference site. Fish species richness was directly proportional to the mean local Froude number, an indicator of the availability of pool habitat.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号