首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
In this study, an interval-parameter two-stage mixed integer linear programming (ITMILP) model is developed for supporting long-term planning of waste management activities in the City of Regina. In the ITMILP, both two-stage stochastic programming and interval linear programming are introduced into a general mixed integer linear programming framework. Uncertainties expressed as not only probability density functions but also discrete intervals can be reflected. The model can help tackle the dynamic, interactive and uncertain characteristics of the solid waste management system in the City, and can address issues concerning plans for cost-effective waste diversion and landfill prolongation. Three scenarios are considered based on different waste management policies. The results indicate that reasonable solutions have been generated. They are valuable for supporting the adjustment or justification of the existing waste flow allocation patterns, the long-term capacity planning of the City's waste management system, and the formulation of local policies and regulations regarding waste generation and management.  相似文献   

2.
The author takes a simplified look at the structure of waste disposal costs in the UK. The immediate impression is that landfill costs are so significantly cheaper than other disposal options, on average, that considerable escalation in landfill costs, for whatever reason, would be needed to make it lose its predominance. The analysis also demonstrates that the more futuristic technologies may well have a role to play provided the initial estimates of per tonne costs are borne out by commercial ventures.  相似文献   

3.
The twentieth century saw a dramatic increase in the production of urban solid waste, reflecting unprecedented global levels of economic activity. Despite some efforts to reduce and recover the waste, disposal in landfills is still the most usual destination. However, landfill has become more difficult to implement because of its increasing cost, community opposition to landfill siting, and more restrictive environmental regulations regarding the siting and operation of landfills. Moreover, disposal in landfill is the waste destination method with the largest demand for land, while land is a resource whose availability has been decreasing in urban systems. Shortage of land for landfills is a problem frequently cited in the literature as a physical constraint. Nonetheless, the shortage of land for waste disposal has not been fully studied and, in particular, quantified. This paper presents a method to quantify the relationship between the demand and supply of suitable land for waste disposal over time using a geographic information system and modelling techniques. Based on projections of population growth, urban sprawl and waste generation the method can allow policy and decision-makers to measure the dimension of the problem of shortage of land into the future. The procedure can provide information to guide the design and schedule of programs to reduce and recover waste, and can potentially lead to a better use of the land resource. Porto Alegre City, Brazil was used as the case study to illustrate and analyse the approach. By testing different waste management scenarios, the results indicated that the demand for land for waste disposal overcomes the supply of suitable land for this use in the study area before the year 2050.  相似文献   

4.
吴宇 《中国环境管理》2024,16(1):162-168
我国在联合国大会上提出了“2030年碳达峰2060年碳中和”的目标。为达成此目标,固体废物治理领域也需要积极作出响应。固体废物治理体系的核心是固体废物的处置。不同的固体废物处置方式有着不同的碳排放结果,填埋或焚烧方式处置所排放的温室气体量都远大于循环利用的方式。应以固体废物领域碳排放统一核算制度为基石,从推进政策实施和立法修改等的多个层面上去因应。立法面向上,《固体废物污染环境防治法》《清洁生产促进法》《循环经济促进法》乃至编纂中的“环境法典”都应当围绕减碳模式的固体废物处置方式改进和制定相关法律规范;制度建设面向上,以固体废物碳排放强制核算法律制度建设为主,通过碳排放强制核算制度规范相关主体及其权利义务关系并深度挖掘固体废物处置的碳减排潜力。  相似文献   

5.
Summary As landfill sites reach capacity and are under environmental regulations to close, communities across America face solid waste disposal crises. The City of Baltimore, Maryland, after initially choosing an experimental technology which failed, turned to a proven mass-burn resource recovery system for solid waste disposal. Through a process called privatization, the City shielded itself from financial risk associated with the operation of the plant. Signal Environmental Systems owns and operates the refuse-to-energy facility, which features a mass-burn technology developed in Switzerland by Von Roll, Inc., and charges the City a service fee per ton of refuse processed.The success of the partnership between the public and private sectors for the provision of efficient and reliable solid waste disposal in the City and County of Baltimore can serve as a model for developing and implementing technologies to meet the many other challenges facing the country and the world as a whole.Alfred B. DelBello was at one time Lieutenant Governor of New York and County Executive of New York's Westchester County. As President and Chief Executive Officer of Signal Environmental Systems Inc., he describes a refuse-to-energy facility established by Signal in Baltimore, Maryland. Signal Environmental Systems are currently the largest provider of resource recovery plants in the USA, other contributors are Combustion Engineering, American Ref-Fuel and Ogden; with Foster Wheeler, Blount, and Dravo, being other significant participants.  相似文献   

6.
The state of solid waste recycling by scavengers in Onitsha, a heavily commercial city in Anambra State, and some other urban areas such as Nsukka, Enugu, and Port Harcourt was analyzed. Data were obtained through interviews of scavengers who deal with recyclables. Although the activities of scavengers are sub-optimal, they can have a great impact on Nigerian economy with respect to resource conservation, creation of job opportunities, and reduction of the magnitude of waste disposal problems. A cost analysis is presented to compare the different forms of recycling utilized by municipal solid waste management. It is shown that a well-planned recycling program with recycling and composting would result in 18.6% savings in waste management costs and 57.7% in landfill avoidance costs. However, if the compost materials are not recycled, the corresponding savings in cost become 8.6% and 28.6%, respectively. The option with the lowest cost involves encouraging individual households to separate at the source their recyclables, which are bought by scavengers. This results in 78.0% savings in waste management cost and 79.5% landfill avoidance cost. A low-cost approach aimed at the integration of scavenging activities into conventional solid waste management is presented.  相似文献   

7.
One of the most controversial planning issues internationally is the siting of waste disposal infrastructure in local communities. Compensation is viewed as a possible solution to siting difficulties in many countries. However, existing empirical evidence is conflicting as to whether or not compensation-based siting has reduced opposition to such developments. Thus, before compensation policy can be considered as the solution for recognising social costs and introducing equity into the waste planning system, it is important to understand why people reject waste disposal infrastructure developments and if this rejection continues over the lifetime of facility operations. This paper utilises information gathered through surveys to examine the effects of distance, local authority consultation efforts, experience and other factors, on attitudes towards non-hazardous solid waste landfill developments in two examples of a potential and actual host communities. Our findings suggest distance proxies expectations of environmental risk in communities with no experience of living with landfill infrastructure. Community consultations by authorities are consistently important, even after a landfill has been in operation for a number of years. This suggests to policy makers to consult thoroughly and adequately before pursuing compensation policies.  相似文献   

8.
Discussions of municipal solid waste (MSW) management are influenced increasingly by the concept of the waste hierarchy which, broadly speaking, places landfill as the least acceptable option for dealing with MSW, followed by incineration, recycling, re-use and reduction at source. In this paper, we want to question the wisdom of applying the waste hierarchy in a region with a low population density. The hierarchy was first developed with reference to the high population density areas such as the core of the EU. However, in low population density areas the economics of the various approaches to MSW is likely to be quite different. As a result, the application of the hierarchy could place an undue economic burden on a region relative to the environmental benefits that might arise. We estimate the costs, both internal and external, of the various methods of dealing with MSW in an area with the appropriate population density, drawing on information from a wide variety of sources. We find that landfill is significantly cheaper than in high population density areas, even when account is taken of the associated externalities. In addition, it is generally cheaper than the alternative methods. As such, we conclude that landfill should not be shunned as a disposal method in low population density areas.  相似文献   

9.
Solid waste management (SWM) is at the forefront of environmental concerns in the Lower Rio Grande Valley (LRGV), South Texas. The complexity in SWM drives area decision makers to look for innovative and forward-looking solutions to address various waste management options. In decision analysis, it is not uncommon for decision makers to go by an option that may minimize the maximum regret when some determinant factors are vague, ambiguous, or unclear. This article presents an innovative optimization model using the grey mini-max regret (GMMR) integer programming algorithm to outline an optimal regional coordination of solid waste routing and possible landfill/incinerator construction under an uncertain environment. The LRGV is an ideal location to apply the GMMR model for SWM planning because of its constant urban expansion, dwindling landfill space, and insufficient data availability signifying the planning uncertainty combined with vagueness in decision-making. The results give local decision makers hedged sets of options that consider various forms of systematic and event-based uncertainty. By extending the dimension of decision-making, this may lead to identifying a variety of beneficial solutions with efficient waste routing and facility siting for the time frame of 2005 through 2010 in LRGV. The results show the ability of the GMMR model to open insightful scenario planning that can handle situational and data-driven uncertainty in a way that was previously unavailable. Research findings also indicate that the large capital investment of incineration facilities makes such an option less competitive among municipal options for landfills. It is evident that the investment from a municipal standpoint is out of the question, but possible public–private partnerships may alleviate this obstacle.  相似文献   

10.
Waste disposal is an issue that is becoming increasingly important in policy terms in the European Union, and in Italy, a country showing strong geographical heterogeneity in waste management. This paper analyses the process of decoupling/delinking between economic growth and landfilling trends in a framework where economic, policy, geographical elements and spatial issues are all considered as drivers behind the phenomenon. We exploit an original and very rich provincial panel dataset over 1999–2005 for the 103 Italian provinces. Evidence shows that the observed ‘absolute’ decoupling between economic growth and landfilling is driven by a mix of structural factors. Among the main factors, population density, more than the provincial income level, emerges as a crucial driver: local opportunity costs and landfill externalities matter in shaping waste policies and local commitment to a transition away from landfilling of waste (landfill diversion). However, not only structural factors are relevant. If on the one hand landfill taxes are not a significant driver of the phenomenon, waste management tools, such as separated collection for recycling, and the tariff system connected to waste services, bring about significant effect on the amount of landfilled waste. Moreover, regarding the analysis of spatial interrelations across provinces, we note that the presence of incinerators in nearby provinces increases landfill diversion, due probably to free riding behaviour or intra-provinces ‘agreements’ on waste management; this is not true for nearby landfill sites, that cause for a given province a strong lock in effect. Future research could strengthen the analysis of policy effectiveness at regional level, focusing on policy endogeneity, and the full investigation of spatial correlations in waste disposal performances.  相似文献   

11.
Sustainable development goals are achievable through the installation of Material Recovery Facilities (MRFs) in certain solid waste management systems, especially those in rapidly expanding multi-district urban areas. MRFs are a cost-effective alternative when curbside recycling does not demonstrate long-term success. Previous capacity planning uses mixed integer programming optimization for the urban center of the city of San Antonio, Texas to establish that a publicly owned material recovery facility is preferable to a privatized facility. As a companion study, this analysis demonstrates that a MRF alleviates economic, political, and social pressures facing solid waste management under uncertainty. It explores the impact of uncertainty in decision alternatives in an urban environmental system. From this unique angle, waste generation, incidence of recyclables in the waste stream, routing distances, recycling participation, and other planning components are taken as intervals to expand upon previous deterministic integer-programming models. The information incorporated into the optimization objectives includes economic impacts for recycling income and cost components in waste management. The constraint set consists of mass balance, capacity limitation, recycling limitation, scale economy, conditionality, and relevant screening restrictions. Due to the fragmented data set, a grey integer programming modeling approach quantifies the consequences of inexact information as it propagates through the final solutions in the optimization process. The grey algorithm screens optimal shipping patterns and an ideal MRF location and capacity. Two case settings compare MRF selection policies where optimal solutions exemplify the value of grey programming in the context of integrated solid waste management.  相似文献   

12.
Sanitary landfilling is considered to be the most appropriate means of final disposal of solid wastes. Currently in Tanzania, the cheapest method of developing a landfill is by making use of natural depressions or former borrow pits and mine pits. This paper examines the impacts associated with the relocation of a waste disposal site from a crude disposal site at Vingunguti to a new landfill site at New MECCO quarry in Kunduchi area, both in Dar es Salaam, Tanzania. The paper focuses on the fate of scavenging and solid waste recycling which are currently taking place at Vingunguti site and mining as well as food vending activities at the proposed new landfill site. Scavenging and waste recycling were found to be important sources of income for some individuals in the city. Various items collected for recycling were found to be an important source of raw materials for some industries in Dar es Salaam. A total of 94% of all the miners were entirely dependent on stone mining and crushing as a sole means of income generation, and 68% of the miners had practised this activity for between 1 and 9 years. Finally the paper recommends that, selection of a waste disposal site should favour abandoned mines or borrow pits rather than operational ones. It also recommends that, waste recycling and scavenging be accommodated in other stages of the waste stream since they can not be practised at a sanitary landfill.  相似文献   

13.
生活垃圾的处置一直以填埋为主,垃圾填埋承载着巨大的环境压力,尤其是垃圾填埋产生的渗滤液会对地下水造成砷、汞污染。为了解北京市生活垃圾填埋场地下水砷、汞污染水平,在北京市5座生活垃圾填埋场布设采样点,采集36个地下水样品,采用氢化物发生-原子荧光法,分析了地下水砷、汞含量特征。结果表明,36个地下水样品砷浓度范围0.41~4.82μg/L,汞浓度范围0.024~0.121μg/L,北京市典型垃圾填埋场地下水样品不存在砷、汞污染问题。  相似文献   

14.
An interval-parameter two-stage chance-constraint mixed integer linear programming (ITCMILP) model is provided for supporting long-term planning of solid waste management in the City of Foshan, China. The ITCMILP is formulated by integrating interval-parameter, two-stage, mixed integer, and chance-constraint programming methods into a general framework, and can thus deal with multiple uncertainties associated with model parameters, constraints and objectives. Three scenarios are examined, covering combinations of various system conditions and waste management policies. Scenario 1 is designed for comparison purposes. Scenarios 2 and 3 correspond to situations when the existing landfill's life is to be extended. The results demonstrate that the centralized composting and incinerating facilities are desired for treating the organic waste flows. The tradeoff among system cost, violation risk, and the related policy implications are also analyzed. The results obtained could help decision makers gain in-depth insights into the impact of uncertainties on long-term solid waste management in the City of Foshan.  相似文献   

15.
上海市食品废弃物处理处置现状综述   总被引:1,自引:0,他引:1  
赵有亮 《四川环境》2010,29(2):128-133
对上海市生活垃圾中食品废弃物和餐厨垃圾近年来的产生状况进行了综述,讨论了上海市对生活垃圾中食品废弃物和餐厨垃圾的管理和处理处置现状,并分别进行了总结。最后对上海市食品废弃物的资源化利用进行了展望。  相似文献   

16.
城市生活垃圾填埋场甲烷气资源的产量估算及其利用   总被引:10,自引:0,他引:10  
本文论述了填埋场甲烷气体的产生过程及影响因素,介绍了三种产气量估算方法及其主要特点、适用范围,并指出运用数学模型对产气量作出预测,为垃圾填埋场气体收集与处理系统的设计提供可靠的依据。同时,论述了甲烷气体的减排和综合利用措施。  相似文献   

17.
南京市生活垃圾现状及综合处理对策研究   总被引:6,自引:1,他引:5  
根据采样结果与统计分析,文章总结了南京市生活垃圾的现状,以及其产量和组成特性的变化趋势。城市生活垃圾处理是一个复杂的系统工程,任何单一的处置措施都无法满足。针对现实处理,过程中存在的问题,作者提出了生活垃圾的综合方案,即以设施为依托,以技术为核心,以市场为动力的设施-技术-市场三位一体综合方案。  相似文献   

18.
In Mauritius, solid waste disposal has been a cause for concern since the 1980s. Currently, there is no segregation of waste and some 1200 tonnes of solid waste are generated daily by the 1.24 million inhabitants of the island. As processes such as recycling and composting are still in their infancy stage, most of the waste generated have to be disposed of at the sole landfill. The solid waste management practices of 1980s and early 1990s are no longer compatible with the changing composition and quantity of wastes now generated. As a result, there is an urgency to review the whole waste management system and come forward with sustainable solutions.This paper presents an overview of the disposal of non-hazardous solid waste in Mauritius and provides recommendations for improving the current disposal system.  相似文献   

19.
Biostabilization can remove considerable amounts of moisture and degradable organic materials from municipal solid waste (MSW), and can therefore be an effective form of pretreatment prior to landfill. The environmental and economic impacts of two combined processes, active stage biostabilization + sanitary landfill (AL), and active and curing stage biostabilization + sanitary landfill (ACL), were compared with sanitary landfill (SL) for MSW with high moisture content. The results indicated that land requirement, leachate generation, and CH(4) emission in the ACL process decreased by 68.6%, 89.1%, and 87.6%, respectively, and the total cost was reduced by 24.1%, compared with SL. This implies that a combined biostabilization and landfill process can be an environmentally friendly and economically feasible alternative to landfill of raw MSW with high moisture content. Sensitivity analysis revealed that treatment capacity and construction costs of biostabilization and the oxidation factor of CH(4) significantly influenced the costs and benefits of the AL and ACL process at an extremely low land price. When the land price was greater than 100 USD m(-2), it became the dominating factor in determining the cost of treatment and disposal, and the total costs of ACL were reduced to less than 40% of those of SL.  相似文献   

20.
In work, we compared two models for dealing with urban solid waste in Brazil, namely, management by contract and management by public–private partnership. Management by contract, which is widely used by the public sector (municipalities) for urban solid waste collection and disposal and for acquiring goods and services for periods not greater than 60 months, is governed by Federal Law 8.666/93. Management by public–private partnership is governed by Federal Law 11.079/04 for contracts worth more than US$11,000,000 and involves costs for the private partner and public partner. The financial return for the private partner must be clearly delineated and the contract should last from 5 to 35 years. Management by public–private partnership that involves the management of municipal solid waste is very recent in Brazil. For this reason, the comparison between the two forms of management of municipal solid waste (management by contract and management by public–private partnership) described in this work is unprecedented in this country. Both of these models are used in the municipality of São Bernardo do Campo in the State of São Paulo, Brazil. For this study, information was gathered through semi-structured interviews with public works managers in São Bernardo do Campo, with members of an Association of Recyclable Material Collectors and with managers of a company contracted by the São Bernardo do Campo city hall, and also by researching public documents provided by the city hall. The interviews with the managers of the municipality of São Bernardo do Campo, the Association and the company were held in the headquarters of each institution. The documents analyzed, such as the plan for dealing with municipal solid waste, contracts and bids were made available electronically. Analysis of the results indicated that management by a public–private partnership was more advantageous for dealing with urban solid waste than management by contract since the former provided a strong selective collection program, reduced the amount of solid waste sent to sanitary embankments, led to the recovery an area of land previously degraded by the incorrect disposal of urban solid waste and stimulated the installation of an energy recovery unit.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号