首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This article evaluates the implementation of Proposition O, a stormwater cleanup measure, in Los Angeles, California. The measure was intended to create new funding to help the city comply with the Total Maximum Daily Load requirements under the federal Clean Water Act. Funding water quality objectives through a bond measure was necessary because the city had insufficient revenues to deploy new projects in its budget. The bond initiative required a supermajority vote (two-thirds of the voters), hence the public had to be convinced that such funding both was necessary and would be effective. The bond act language included project solicitation from the public, as well as multiple benefit objectives. Accordingly, nonprofit organizations mobilized to present projects that included creating new parks, using schoolyards for flood control and groundwater recharge, and replacing parking lots with permeable surfaces, among others. Yet few, if any, of these projects were retained for funding, as the city itself also had a list of priorities and higher technical expertise in justifying them as delivering water quality improvements. Our case study of the implementation of Proposition O points to the potentially different priorities for the renovation of urban infrastructure that are held by nonprofit organizations and city agencies and the importance of structuring public processes clearly so that there are no misimpressions about funding and implementation responsibilities that can lead to disillusionment with government, especially under conditions of fiscal constraints.  相似文献   

2.
Abstract: Recent water sector reforms and increased scarcity and vulnerability of water resources, combined with declining public funding available for large scale infrastructure investment in the sector, have led to a greater awareness by the Government of Vietnam for the need to analyze water resource allocation and use in an integrated fashion, at the basin scale, and from a perspective of economic efficiency. In this study we focus on the development, application, and selected policy analyses using an integrated economic hydrologic river basin model for the Dong Nai River Basin in southern Vietnam. The model framework depicts the sectoral structure and location of water users (agriculture, industry, hydropower, domestic, and the environment) and the institutions for water allocation in the basin. Water benefit functions are developed for the major water uses subject to physical limitations and to constraints of system control and policy. Based on this modeling framework, we will analyze policies that can affect water allocation and use at the basin level, including both basin-specific and general macroeconomic policies.  相似文献   

3.
“Avança Brasil” (Forward Brazil) is a package of 338 projects throughout Brazil; the portion of the plan to be carried out in Brazil's Legal Amazon region totals US$43 billion over 8 years, US$20 billion of which would be for infrastructure causing environmental damage. Brazil's environmental impact assessment system is not yet capable of coping with the challenge presented by Avança Brasil. Generic problems with the licensing process include stimulation of a lobby in favor of construction before decisions are made on the advisability of the projects, the “dragging effect” of third parties, whereby economic activity is attracted to the infrastructure but escapes the environmental impact assessment system, a tendency for consulting firms to produce favorable reports, a bureaucratic emphasis on the existence of steps without regard to the content of what is said, and the inability to take account of the chain of events unleashed when a given project is undertaken.The environmental and social costs of forest loss are high; among them is loss of opportunities for sustainable use of the forest, including loss of environmental services such as biodiversity maintenance, water cycling, and carbon storage. The benefits of export infrastructure are meager, especially from the point of view of generating employment. Much of the transportation infrastructure is for soybeans, while the hydroelectric dams contribute to processing aluminum. The example of Avança Brasil makes clear the need to rethink how major development decisions are made and to reconsider a number of the plan's component projects.  相似文献   

4.
Triggered by recent flood catastrophes and increasing concerns about climate change, scientists as well as policy-makers increasingly call for making long-term water policies to enable a transformation towards flood resilience. A key question is how to make these long-term policies adaptive so that they are able to deal with uncertainties and changing circumstances. The paper proposes three conditions for making long-term water policies adaptive, which are then used to evaluate a new Dutch water policy approach called ‘Adaptive Delta Management’. Analysing this national policy approach and its translation to the Rotterdam region reveals that Dutch policy-makers are torn between adaptability and the urge to control. Reflecting on this dilemma, the paper suggests a stronger focus on monitoring and learning to strengthen the adaptability of long-term water policies. Moreover, increasing the adaptive capacity of society also requires a stronger engagement with local stakeholders including citizens and businesses.  相似文献   

5.
Public private partnerships (PPPs) allow the Indian Government to leverage private capital for meeting the widening demand-supply gap in the provision of infrastructure services. The private sector, however, prefers to limit the participation to financially attractive projects only, thereby resulting in patterns of infrastructure creation impeding the progress towards sustainable development. In order to promote sustainable development, the PPP procurement process should focus on incentivising the private sector for sustainable infrastructure development rather than concentrating on ensuring financial sustainability only. This paper discusses the principles-based PPP-specific framework that has been developed to facilitate assessment of PPP projects' progress towards sustainable development. The framework development was based on a holistic approach to sustainability assessment and subsequently validated through questionnaire survey with key stakeholders in the Indian PPP programme. This framework will provide the decision makers with appropriate decision aid for integration of sustainable development principles in the PPP procurement process.  相似文献   

6.
Environmental impact assessment (EIA) has been promoted as an instrument for preventive environmental management in construction projects, but its performance in safeguarding the environment through influencing project decision-making is questioned. This paper probes the underlying reasons from a governance perspective as an important supplement to the regulatory and technical perspectives. A framework, with process integration, professional governance, and public engagement being its key components, is proposed to analyze the governance arrangements that enable or inhibit the effective functioning of EIA, based on which a comparative study of three infrastructure projects in China, the United States and Finland was conducted. The results reveal that, while the level of process integration and public engagement of EIA determines the degree to which EIA influences project decisions, it is the professional governance that controls the accountability of EIA. The paper has implications on institutionally where efforts should be directed to improve the performance of EIA.  相似文献   

7.
Summary Many Third World Countries (TWCs), like Ghana, have not concerned themselves seriously with environmental problems as part of the entire socio-economic development process, until recently. This, for example, can be seen in their environmental policies and the rate at which these now are being made. Not only are environmental issues being considered in the formulation and implementation of new development programmes and projects, but it is being realised that earlier implemented projects need some evaluation,ex post, for possible, correction of past mistakes or, at least, as a source of self-containment. Thus, there has been interest in the impact assessment of past macro-projects as agricultural and resettlement schemes.An attempt is made to apply a simple matrices methodology to theex post evaluation of the Kpong Hydro-electric Project resettlement aspect, based on identified project and environment components. The results show that the impact on the socio- economic life of the settlers is positively greater than the physical and biological impacts. But considering other elements of the programme package and taking a perspective view, the settlers are after all, no better off. In view of the fact that a number of such schemes are now under consideration, it is useful for policy-makers and planners to learn from these lessons.Sam Ofori-Cudjoe is a Lecturer in Geography at the University of Cape Coast, Ghana. He is currently studying planning research at the Centre for Planning, University of Strathclyde, Glasgow. He obtained a BA (Hons) in Geography from the Department of Geography, University of Ghana, Legon, in 1978, and a MSc (Regional Planning) from the Department of Planning, University of Science and Technology (UST), Kumasi, Ghana, in 1981.  相似文献   

8.
ABSTRACT: Typically, infrastructure agencies build massive water projects to serve expanding populations in emerging country cities, but collect and treat only a fraction of the resulting wastewater. This effluent often overwhelms existing sewerage systems and fouls waterways. Cleaning urban waterways requires large investments over long terms and the political will to make and sustain them. This challenge - difficult in advanced countries - becomes daunting with the scarce resources and weak institutions typical of emerging countries. This paper presents a framework to structure such a strategy, and applies it to Madras, India. It consists of three parts: (1) setting a vision through a participatory process; (2) macro investments mainly in wastewater treatment that use least-cost methods; and (3) micro investments in small projects that involve local people and galvanize public support. The macro investment, $350 million for Madras, appears very large, but averages out to $66 per capita, far below the $1,000-$2,000 typical of advanced country cities. Micro projects to be undertaken by Non-Governmental Organizations (NGOs) included an independent wastewater monitoring program, sanitary upgrading of slums along waterways banks, a cattle waste demonstration project, and an industrial pollution survey. Together, a macro/micro strategy promises the funding and political will to achieve a balanced vision of waterways quality.  相似文献   

9.
Traditional construction practices provide little opportunity for environmental remediation to occur in urban areas. As concerns for environmental improvement in urban areas become more prevalent, innovative practices which create ecosystem services and ecologically functional land cover in cities will be in higher demand. Green roofs are a prime example of one of these practices. The past decade has seen the North American green roof industry rapidly expand through international green roof conferences, demonstration sites, case studies, and scientific research. This study evaluates existing international and North American green roof policies at the federal, municipal, and community levels. Green roof policies fall into a number of general categories, including direct and indirect regulation, direct and indirect financial incentives, and funding of demonstration or research projects. Advantages and disadvantages of each category are discussed. Salient features and a list of prompting standards common to successfully implemented green roof strategies are then distilled from these existing policies. By combining these features with data collected from an experimental green roof site in Athens, Georgia, the planning and regulatory framework for widespread green roof infrastructure can be developed. The authors propose policy instruments be multi-faceted and spatially focused, and also propose the following recommendations: (1) Identification of green roof overlay zones with specifications for green roofs built in these zones. This spatial analysis is important for prioritizing areas of the jurisdiction where green roofs will most efficiently function; (2) Offer financial incentives in the form of density credits and stormwater utility fee credits to help overcome the barriers to entry of the new technology; (3) Construct demonstration projects and institutionalize a commitment greening roofs on publicly-owned buildings as an effective way of establishing an educated roofing industry and experienced installers for future green roof construction.  相似文献   

10.
Arbuckle, Jr., J. Gordon, 2012. Clean Water State Revolving Fund Loans and Landowner Investments in Agricultural Best Management Practices in Iowa. Journal of the American Water Resources Association (JAWRA) 1‐9. DOI: 10.1111/j.1752‐1688.2012.00688.x Abstract: Clean Water State Revolving Fund (CWSRF) loan programs for water quality have traditionally funded infrastructure projects at the community, municipality, or state level. They are increasingly being used to support individual landowner adoption of agricultural best management practices (BMPs) for nonpoint source pollution abatement. In 2005, the Iowa CWSRF initiated the Local Water Protection Program (LWPP) to increase the scope, scale, and rate of agricultural BMP establishment. This research examines the effectiveness of that program through a comparison of survey data from LWPP participants and state cost‐share recipients who were eligible for loans, but did not take them. Loan recipients’ assessments of the program were overwhelmingly positive, with near‐universal satisfaction with both the loan product and process. Results of statistical analyses indicate that loan recipients invested substantially more in conservation than nonrecipients. Evidence suggests that by helping program participants to overcome financial constraints, loans are facilitating larger and accelerated investments in conservation. Although findings indicate that conservation loans can play an important role in funding conservation, loan recipients also still depend on cost‐share. Loans are not necessarily a substitute for traditional forms of conservation funding, but rather another tool that landowners and conservation professionals can employ to facilitate investments in BMPs.  相似文献   

11.
Differences between scientist and policy-maker response types and times, or the “how” and “when” of action, constrain effective water resource management in suburbanizing watersheds. Policy-makers are often rushed to find a single policy that can be applied across an entire, homogeneous, geopolitical region, whereas scientists undertake multiyear research projects to appreciate the complex interactions occurring within heterogeneous catchments. As a result, watershed management is often practiced with science and policy out of synch. Meanwhile, development pressures in suburban watersheds create changes in the social and physical fabric and pose a moving target for science and policy. Recent and anticipated advances in the scientific understanding of urbanized catchment hydrology and pollutant transport suggest that management should become increasingly sensitive to spatial heterogeneities in watershed features, such as soil types, terrain slopes, and seasonal watertable profiles. Toward this end, policy-makers should encourage funding scientific research that characterizes the impacts of these watershed heterogeneities within a geopolitical zoning and development framework.  相似文献   

12.
ABSTRACT: The environment surrounding urban streams imposes constraints upon stream enhancement projects. Constraints include bridges, culverts, highways, sewer and water lines, lack of easements, and other floodplain structures. The consequences of failure of these infrastructure constraints can be significant and should be considered in the design process. Fault tree analysis provides a systematic technique for analyzing the interactions of events that could lead to infrastructure failure. A case study of a stream in Pittsburgh, Pennsylvania, shows that fault tree analysis can effectively model the interactions between the stream system and the infrastructure constraints and predict the most likely modes of failure. In addition, the relative success of alternative designs and failure mitigation techniques can be assessed using this analysis tool, lending insight into the urban stream enhancement design process. The method could also provide justification in the design permitting process and input for risk assessment.  相似文献   

13.
Stream restoration and enhancement projects: is anyone monitoring?   总被引:3,自引:2,他引:1  
Declines in salmon stocks and general watershed health in Washington State, USA, have led to an increase in stream restoration and enhancement projects initiated throughout the state. The increasing number of projects has also raised questions regarding the monitoring of these efforts. Project managers receiving hydraulic project approvals (HPAs) were surveyed to determine whether monitoring was taking place on their projects. About half the project managers surveyed reported the collection of baseline data and the use of biological, physical, chemical, or other water quality measures for their projects. Of those who reported collection of monitoring data, only 18% indicated that monitoring was required. Respondents were also asked to rank the importance of various project goals on a Likert scale. Project managers with projects focusing on “engineering” goals (e.g., roadbed stabilization) were less likely than other project managers to collect baseline monitoring data. Project managers with projects focusing on “restoration/ecological” or “fisheries” goals were more likely than other project managers to collect monitoring measures. Although monitoring appears to be taking place in slightly more than half of the projects surveyed, the nature of the data collected varies widely across projects, and in most cases the monitoring effort is voluntary. This suggests that project sponsors, funders, and managers must consider the issues involved in requiring appropriate monitoring, establishing standardized monitoring guidelines, the time frames in which to monitor, providing other incentives for conducting monitoring, and ensuring adequate funding for monitoring efforts.  相似文献   

14.
There is currently a considerable emphasis on delivering major renewable energy infrastructure projects. Such projects will have impacts on local communities; some impacts may be perceived as positive but others will be viewed more negatively. Any just regulatory process for considering and permitting such infrastructure will need to heed the concerns that local communities voice. But what counts as a local voice? In this paper it is argued that the regulatory process plays a performative role, constructing what counts as a local voice. Furthermore, this has consequences for how regulatory deliberations proceed and the outcomes of regulatory processes. The empirical basis for this argument is a study of major offshore renewable energy infrastructure in England and Wales and the way that it is regulated through a specific regime – the Nationally Significant Infrastructure Projects (NSIPs) regime established by the Planning Act 2008. Through a detailed study of eight projects that have passed through the regime, the analysis unfolds the way that the voices of local residents, local businesses, local NGOs and local authorities are constructed in the key boundary object of the Examining Authority’s report; it then draws out the implications for the mitigation measures that are negotiated. The research suggests that what counts as a local voice is constrained by how the performative role of the NSIPs regulatory regime differentiates between interests and suggests that new ways of giving voice to local people are required.  相似文献   

15.
Applying the concept of sustainability to invasive species management (ISM) is challenging but necessary, given the increasing rates of invasion and the high costs of invasion impacts and control. To be sustainable, ISM must address environmental, social, and economic factors (or “pillars”) that influence the causes, impacts, and control of invasive species across multiple spatial and temporal scales. Although these pillars are generally acknowledged, their implementation is often limited by insufficient control options and significant economic and political constraints. In this paper, we outline specific objectives in each of these three “pillars” that, if incorporated into a management plan, will improve the plan’s likelihood of sustainability. We then examine three case studies that illustrate how these objectives can be effectively implemented. Each pillar reinforces the others, such that the inclusion of even a few of the outlined objectives will lead to more effective management that achieves ecological goals, while generating social support and long-term funding to maintain projects to completion. We encourage agency directors and policy-makers to consider sustainability principles when developing funding schemes, management agendas, and policy.  相似文献   

16.
We present a simulation model developed to communicate a potential investment trap associated with using man‐made river engineering to protect built infrastructure. A small system dynamics model in STELLA? was constructed following a collaborative model‐building process to increase understanding among stakeholders of the role natural capital plays in wealth creation. We set out to explore the dynamic relationship between investing tax revenue in natural capital (specifically forested headwaters and low land wetlands) rather than built capital (specifically stopbanks) for flood protection in the Manawatū watershed, New Zealand. Significant investment is currently required to maintain and enhance river engineering infrastructure and keep pace with changes in the river's geomorphology. Viewed from a systems perspective, we suggest diversion of a proportion of existing funding into restoration of forested headwaters on steep slopes and restoration of functioning wetlands on floodplains could in the longer term provide an effective approach to flood protection. Co‐benefits of increased natural capital include the ecosystem services nutrient cycling, sediment capture, water purification, biodiversity, pollination, and cultural and recreational values. Overcoming an investment trap requires a longer term perspective. This simple model consisting of two feedback loops and two delays aims to contribute to an ongoing stakeholder dialogue concerning the Manawatū River watershed in New Zealand.  相似文献   

17.
ABSTRACT: The Federal Government's interest and involvement in water resource development in discussed in the context of project financing and cost sharing. After drawing a clear distinction between the two issues - who puts up the money, and who repays over time - the authors survey a number of Federal acts from which have evolved nearly 200 separate cost-sharing rules. Selected cost sharing and financing issues discussed include consistency in policies, rehabilitation of urban water supply systems, multipurpose water quality projects, and ground water management. Two proposals for cost/finance sharing reform introduced in the 96th Congress are discussed in detail and their impacts compared with current policy. The joint venture approach (Administration proposal) results in an effective composite cost share which changes significantly but not drastically (from 19 to 35 percent non-Federal share for a hypothetical project). The block grant approach (Domenici-Moynihan proposal) would alter the regional distribution of Federal water developement funding from the South and West to the Northwest and North Central States.  相似文献   

18.
This study proposes a technical procedure based on a life cycle approach for implementation of the environmental sustainability assessment (ESA) of several waste-to-energy (WtE) plants located in Spain. This methodology uses two main variables: the natural resources sustainability (NRS) and the environmental burdens sustainability (EBS). NRS includes the consumption of energy, materials, and water, whereas EBS considers five burdens to air, five burdens to water, and two burdens to land. To reduce the complexity of ESA, all variables were normalised and weighted using the threshold values proposed in the European Pollutant Release and Transfer Register regulation. The results showed the plants studied had a greater consumption of natural resources than Spain, ranging from 1.1 to 2.0 times higher than the Spanish reference consumption. The comparison of Spain with the BREF reference on waste incineration showed that only in the variable related to materials, did Spain have a lower consumption (1.80 times lower). In terms of EBS, air and land impacts were the highest contributors to global burden. The WtE plants presented higher burdens to air and water than Spain, whereas only one plant exceeded the average burden to land of Spain. Finally, this paper demonstrated the usefulness of the ESA methodology to reduce the complexity of LCA and assist the decision-making process in choosing the best option from an environmental point of view. This procedure can be used to obtain an overview of the environmental performance of WtE plants, as well as to assess individual burdens and thereby determine the main environmental hotspots, thereby improving the critical points of the process.  相似文献   

19.
Conditions in Guatemala's Rio Dulce National Park (RDNP) present an immediate decision-making challenge concerning the reversal of current destructive environmental trends, and in establishing policies for restoration, protection, and sustainable use. This article summarises results of environmental assessment activities undertaken at three levels: an environmental impact assessment (EIA) of a proposed industrial forestry activity, an environmental assessment of management options for the Rio Dulce National Park, and water management planning for the Rio Dulce/Lago Izabal watershed. A key result of the EIA was to prohibit construction of a barge terminal within the boundaries of the park because it could set a precedent for future development. Management options for the park focused on establishing land-use controls, dealing with river transport more effectively, and identifying funding mechanisms to implement solutions. At the watershed scale, a strategic approach was recommended to identify priority issues for initiating change toward sustainability in the region.  相似文献   

20.
Western water infrastructure was funded in the early and mid‐20th Century through federal financing through the Bureau of Reclamation. Over the past 30 years, federal financing has been less forthcoming, which has been commensurate with an increase in the need for financing rehabilitation and replacement of western irrigation infrastructure. As federal appropriations have declined, there has been increased interest in alternative approaches to infrastructure including public–private partnerships (P3s), loan guarantees, or title transfer of federal infrastructure. However, two of these approaches — P3s and loan guarantees — are precluded by existing federal budgetary policies, particularly Office of Management and Budget (OMB) scoring practices. If the OMB changed its policies for P3s or loan guarantees, private capital could play an important role in recapitalizing aging Reclamation infrastructure.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号