首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 104 毫秒
1.
This paper is an attempt to examine issues and problemsraised by agricultural biotechnology by drawing on the richnessof contemporary ideas in ethical theory and thereby contribute tothe project of establishing new approaches to these problems. Thefundamental argument is that many of the negative aspects ofagricultural biotechnology are generated at the level of theunderlying conceptual frameworks that shape the technology'sinternal modes of organization, rather than the unintendedeffects of the application of an inherently benevolent set oftechniques. If ``food ethics' is to address the adverse impacts ofagricultural biotechnology, it must ultimately challenge theseconceptual frames, which, I argue, emerge from Enlightenment,liberal, political, and economic theory.The translation of traditional bioethics (focusing on principlessuch as autonomy and rights, justice, and well being) into foodethics does not produce the critical tools that are ableadequately to challenge the harmful legacy of Enlightenmentthinking. What is needed are reorientations of ethics that arecapable of formulating concepts and approaches that to someextent break with the presuppositions that underpin biotechnologyat its foundation. This paper suggests that narrative andfeminist critiques of medical bioethics are a good place to startin this project.  相似文献   

2.
Academics and policy makers seeking to deconstruct landscape face major challenges conceptually, methodologically and institutionally. The meaning(s), identity(ies) and management of landscape are controversial and contested. The European Landscape Convention provides an opportunity for action and change set within new governance agendas addressing interdisciplinarity and spatial planning. This paper critically reviews the complex web of conceptual and methodological frameworks that characterise landscape planning and management and then focuses on emerging landscape governance in Scotland within a mixed method approach involving policy analyses, semi-structured interviews and best practice case studies. Using Dower's (2008) criteria from the Articles of the European Landscape Convention, the results show that whilst some progress has been made in landscape policy and practice, largely through the actions of key individuals and champions, there are significant institutional hurdles and resource limitations to overcome. The need to mainstream positive landscape outcomes requires a significant culture change where a one-size-fits-all approach does not work.  相似文献   

3.
Excessive exploitation of and skewed access to dwindling water resources raise serious water justice concerns. Environmental justice movements and related literature have raised critical questions regarding the unequal distribution of the costs and benefits of a development paradigm that is founded on excessive exploitation and appropriation of natural resources. This paper explores the growing relevance of a water justice framework that addresses both the social and ecological aspects of water use and appropriation, with reference to a four-decade long water conflict over the Chaliyar River in Kerala, South India. It highlights how ecosystem degradation and denial of justice go hand in hand. The paper argues that the framing and articulation of the conflict in a partisan manner led to the glossing over of certain critical features, thus preventing a full view of water injustices. It also failed to inform subsequent policies and practices in this regard.  相似文献   

4.
5.
6.
Abstract

This article reports the findings of a qualitative study with residents living in six deprived neighbourhoods in the UK and the front-line workers and local policymakers responsible for the renewal of these areas. The study was an attempt to raise awareness of local environmental concerns in the context of a national and local policy agenda, which has, until recently, largely overlooked the impacts of degraded environments on the lives and activities of the people who live in them. A key aim for the study was to raise people's concerns with local decision-makers and examine how far these might be addressed through the existing financial, administrative and legislative arrangements for neighbourhood renewal in the UK, namely Local Strategic Partnerships. The research was designed to provide practical lessons and policy recommendations for others wishing to raise the profile of environmental justice in the context of neighbourhood level regeneration projects, in both the UK and elsewhere in the ‘developed’ world.  相似文献   

7.
Management of fresh water resources meets a range of often conflicting interests. Waterways usually run across political and administrative borders and hence make management difficult and collective action politically challenging. In order to meet these challenges, multi-level bioregional approaches to water management have been called for. Such an approach is institutionalised in the EU's Water Framework Directive (WFD). This paper presents the experiences of the Morsa water sub-district in southern Norway, a pilot for implementing the WFD. The paper discusses Morsa in the light of four principles for multi-level water governance: management on a bioregional scale; polycentric governance; public participation; and an experimental approach to water governance. Contrary to widely held assumptions that collective action in polycentric networks will be difficult because actors will follow their own narrow interests, the findings demonstrate how this is not an absolute truth, and how social action cannot be fully explained by rational action theories. The analysis concludes that the relative success of Morsa relates to a complex of factors, including openness of practices and active involvement of key actors, strong but including leadership, and a knowledge based ‘hybrid’ type of multi-level network combining horizontal and vertical network governance.  相似文献   

8.
This paper seeks to find possibilities forreconciliation of the implementation of theprecautionary principle and the promotion ofinternational trade of genetically modified organisms,based on the assumption that a sustainabledevelopment is a right objective to strive for. Itstarts with an explanation of the background and therole of the precautionary principle, and describes inwhat way measures based on the precautionary principlecan easily lead to the creation of trade barriers. Thearticle then examines to what extent the WTO (WorldTrade Organisation) Agreements allow theimplementation of the precautionary principle. Inaddition, structural conflicts between the perceptionof the precautionary principle and the concept oftrade liberalisation will be evoked. The last sectionof the paper analyses to what extent the WTO rulesprovide possibilities to avoid or solve theseconflicts in order to attempt to answer the mainquestion: are the precautionary principle and theinternational trade of genetically modified organismsreconcilable?  相似文献   

9.
10.
In public debates, agricultural biotechnology is almost invariably discussed as a potential threat to the environment and to human health. Without downplaying the risks associated with this technology we emphasize that if properly regulated, it can be a forceful tool to solve environmental problems and promote human health. Agricultural biotechnology can reduce environmental problems in at least three ways: it can diminish the need for environmentally damaging agricultural practices such as pesticides, fertilizers, tillage, and irrigation. It can reduce the land area needed for agriculture, thus reducing the CO2 effect of agriculture and improving biodiversity. It can produce energy in a CO2-neutral way (especially if new technologies involving the cultivation of microalgae become successful). Furthermore, agricultural biotechnology can have positive effects on human health by decreasing occupational and dietary exposure to pesticides, improving the nutritional value of food, and producing pharmaceuticals more efficiently. We argue that those who wish to give high priority to environmental goals cannot afford any longer to be mere onlookers while others decide the future directions of agricultural biotechnology.  相似文献   

11.
Sedimentation is emerging as a key issue in sustainable reservoir management. One approach to controlling reservoir sedimentation is to trap sediment in hydraulic structures upstream of the reservoir. In the 1,163‐km2 catchment of the Dahan River (Taiwan) over 120 “sabo” dams were built to reduce sediment yield to Shihmen Reservoir. Built in 1963 for water supply, Shihmen has lost over 40% of its 290‐Mm3 storage capacity to sedimentation. Most of these upstream structures were small, but three had capacities >9 Mm3. Field measurements and historical data from the Water Resources Agency show most smaller dams had filled with sediment by 1976. The three largest were full or nearly so by 2007, when one (Barlin Dam) failed, releasing a pulse of 7.5 Mm3, most of its 10.4 Mm3 stored sediment downstream. The Central Range of Taiwan is rapidly eroding (denudation rates 3‐6 mm/yr), so geologically high loads make sediment problems manifest sooner. Even in other environments, however, eventually small dams built upstream of large reservoirs are likely to fill themselves, creating multiple small sediment‐filled reservoirs, some located in sites inaccessible to mechanical removal. Our analysis suggests sabo dams do not offer a long‐term basis for controlling reservoir sedimentation in such a high‐sediment yield environment. Sustainable solutions must somehow pass sediment downstream, as would be accomplished by a sediment bypass around Shihmen Reservoir, as now being studied.  相似文献   

12.
The Balbina Dam in Brazil's state of Amazonas floods 2360 km2 of tropical forest to generate an average of only 112.2 MW of electricity. The flat topography and small size of the drainage basin make output small. Vegetation has been left to decompose in the reservoir, resulting in acidic, anoxic water that will corrode the turbines. The shallow reservoir contains 1500 islands and innumerable stagnant bays where the water's residence time will be even longer than the average time of over one year. Balbina was built to supply electricity to Manaus, a city that has grown so much while the dam was under construction that other alternatives are already needed. Government subsidies explain the explosive growth, including Brazil's unified tariff for electricity. Alternative power sources for Manaus include transmission from more distant dams or from recently discovered oil and natural gas deposits. Among Balbina's impacts are loss of potential use of the forest and displacement of about one third of the surviving members of a much-persecuted Amerindian tribe: the Waimiri-Atroari. The dam was closed on 1 October 1987 and the first of five generators began operation in February 1989. The example of Balbina points to important ways that the decision-making process could be improved in Brazil and in the international funding agencies that have directly and indirectly contributed to the project. Environmental impact analyses must be completed prior to decisions on overall project implementation and must be free of influence from project proponents. The current environmental impact assessment system in Brazil, as in many other countries, has an undesirable influence on science policy, in addition to failing to address the underlying causes of environmentally destructive development processes and inability to halt irreversible projects like Balbina.  相似文献   

13.
In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.  相似文献   

14.
Incorporation of environmental flow releases from reservoirs has proven to be challenging due to fear of losses to existing water uses. Moreover environmental flow requirements (EFR) have not often been operationalized. This study compares the possibility of implementing dynamic EFR based on natural flows lagged against an upstream unregulated gauging point with static EFR. It simulates different scenarios with a high flow release in the wet season and analyses its impacts on hydropower production. This method accounts fully for the natural variability of environmental flows, implying less pressure on existing water uses during relatively dry years. Joint operation of two cascading dams vs. individual operation for EFR was also explored. These approaches were tested for the Zambezi River basin in Southern Africa using a water resources model, WAFLEX. Historic data on reservoir water levels, releases and power generation of the hydropower schemes were synthesized. Combining these yielded a validated series of monthly flow data for a 28 year period (1982‐2010). The results show that Kariba and Cahora Bassa reservoirs face a reduction in power produced when they would annually release an environmental flow. However, the dynamic EFR method entails smaller hydropower losses. Joint environmental flow operations will reduce overall basin power production more than if Cahora Bassa alone would release an environmental flow. However, such joint operation would be more beneficial to the ecosystem.  相似文献   

15.
River systems have been altered worldwide by dams and diversions, resulting in a broad array of environmental impacts. The use of a process-based, hierarchical framework for assessing environmental impacts of dams is explored here in terms of a case study of the Kootenai River, western North America. The goal of the case study is to isolate and quantify the relative effects of multiple dams and other river management activities within the study area and to inform potential restoration strategies. In our analysis, first-order impacts describe broad changes in hydrology (determined from local stream gages), second-order impacts quantify resultant changes in channel hydraulics and bed mobility (predicted from a 1D flow model), and third-order impacts describe consequences for recruitment of riparian trees (recruitment box analysis). The study area is a 233km reach bounded by two dams (Libby and Corra Linn). Different times of dam emplacement (1974 and 1938, respectively) allow separation of their relative impacts. Results show significant changes in 1) the timing, magnitude, frequency, duration and rate of change of flows, 2) the spatial and temporal patterns of daily stage fluctuation, unit stream power, shear stress, and bed mobility, and 3) the potential for cottonwood recruitment (Populus spp.). We find that Libby Dam is responsible for the majority of first and second-order impacts, but that both dams diminish cottonwood recruitment; operation of Corra Linn adversely affects recruitment in the lower portion of the study reach by increasing stage recession rates during the seedling establishment period, while operation of Libby Dam affects recruitment in the middle and upper portions of the study reach by changing the timing, magnitude, and duration of flow. We also find that recent experimental flow releases initiated in the 1990s to stimulate recovery of endangered native fish may have fortuitous positive effects on cottonwood recruitment potential in the lower portion of the river. This case study demonstrates how a process-based, hierarchical framework can be used for quantifying environmental impacts of dam operation over space and time, and provides an approach for evaluating alternative management strategies.  相似文献   

16.
/ There are tens of thousands of small dams in the United States; many of these aging structures are deteriorating. Governments and dam owners face decisions regarding repair or removal of these structures. Along with the many benefits society derives from dams and their impoundments, numerous recent ecological studies are revealing the extensive alteration and degradation of river ecosystems by dams. Dam removal-a principal restoration strategy-is an infrequent event. The major reasons for removal have been public safety and the high costs associated with repair; the goal of river ecosystem restoration now warrants greater attention. Substantial study is being given to the environmental aspects of dams and dam removals, but very little attention has been given to the socioeconomic and institutional dimensions associated with the removal of dams, although these factors play a significant role in the removal decision-making process. Based on a case study of dam removals in Wisconsin-where more than 30 of the state's 3600 small dams have been removed in the past few decades-legal, financial, and socioeconomic issues associated with dam removal are documented and assessed. Dam removal has been complex and contentious, with limited community-based support for removal and loss of the impounded waters. In cases examined here, the estimated costs of repairing a dam averaged more than three times the cost of removal. The availability of governmental financing has been a key determinant in removal decisions. Watershed-scale ecological considerations are not major factors for most local interests. As watershed management and restoration increasingly include dam removal options as part of an integrated strategy, more attention will need to be focused on socioeconomic factors and stakeholder perspectives-variables that strongly influence the viability of this management alternative.KEY WORDS: Dam removal; River restoration; Institutions; Stakeholders  相似文献   

17.
“Avança Brasil” (Forward Brazil) is a package of 338 projects throughout Brazil; the portion of the plan to be carried out in Brazil's Legal Amazon region totals US$43 billion over 8 years, US$20 billion of which would be for infrastructure causing environmental damage. Brazil's environmental impact assessment system is not yet capable of coping with the challenge presented by Avança Brasil. Generic problems with the licensing process include stimulation of a lobby in favor of construction before decisions are made on the advisability of the projects, the “dragging effect” of third parties, whereby economic activity is attracted to the infrastructure but escapes the environmental impact assessment system, a tendency for consulting firms to produce favorable reports, a bureaucratic emphasis on the existence of steps without regard to the content of what is said, and the inability to take account of the chain of events unleashed when a given project is undertaken.The environmental and social costs of forest loss are high; among them is loss of opportunities for sustainable use of the forest, including loss of environmental services such as biodiversity maintenance, water cycling, and carbon storage. The benefits of export infrastructure are meager, especially from the point of view of generating employment. Much of the transportation infrastructure is for soybeans, while the hydroelectric dams contribute to processing aluminum. The example of Avança Brasil makes clear the need to rethink how major development decisions are made and to reconsider a number of the plan's component projects.  相似文献   

18.
The increase in energy demand due to economic and population growth necessitates the expansion of the Brazilian energy supply. Hydropower energy, a renewable energy source, arguably clean, presents an energy solution for many countries such as Brazil, with large hydric reservoirs, which help them reduce energy dependence on fossil and imported fuel sources. However, it must be emphasized that without careful planning, the creation of hydropower plants will cause severe social and environmental damage due to the large areas that need to be flooded for the implementation of these plants. The installation of hydropower plants floods vast forest areas, causing loss of biodiversity, displacement of native Brazilian people and riverside populations, and changes to the water acid levels and the natural course of rivers. To mitigate these effects, authorities must first conduct a study on installation possibilities and potential socio‐environmental consequences, to be interpreted and used by the agents involved. Aiming to analyze the social‐environmental impacts of the hydropower plants, this research seeks to investigate the capacity of mitigation of the negative effects of the implementation of the hydropower plants, specifically with regard to the Belo Monte plant, Brazil.  相似文献   

19.
Brazil's Tucuruí Dam provides valuable lessons for improving decision-making on major public works in Amazonia and elsewhere. Together with social impacts, which were reviewed in a companion paper, the project's environmental costs are substantial. Monetary costs include costs of construction and maintenance and opportunity costs of natural resources (such as timber) and of the money invested by the Brazilian government. Environmental costs include forest loss, leading to both loss of natural ecosystems and to greenhouse gas emissions. Aquatic ecosystems are heavily affected by the blockage of fish migration and by creation of anoxic environments. Decay of vegetation left in the reservoir creates anoxic water that can corrode turbines, as well as producing methane and providing conditions for methylation of mercury. Defoliants were considered for removing forest in the submergence area but plans were aborted amid a public controversy. Another controversy surrounded impacts of defoliants used to prevent regrowth along the transmission line. Mitigation measures included archaeological and faunal salvage and creation of a “gene bank” on an island in the reservoir. Decision-making in the case of Tucuruí was virtually uninfluenced by environmental studies, which were done concurrently with construction. The dam predates Brazil's 1986 requirement of an Environmental Impact Assessment. Despite limitations, research results provide valuable information for future dams. Extensive public-relations use of the research effort and of mitigation measures such as faunal salvage were evident. Decision-making was closely linked to the influence of construction firms, the military, and foreign financial interests in both the construction project and the use of the resulting electrical power (most of which is used for aluminum smelting). Social and environmental costs received virtually no consideration when decisions were made, an outcome facilitated by a curtain of secrecy surrounding many aspects of the project. Despite improvements in Brazil's system of environmental impact assessment since the Tucuruí reservoir was filled in 1984, many essential features of the decision-making system remain unchanged.  相似文献   

20.
Environmental Impact Assessment (EIA) is a systematically constructed procedure whereby environmental impacts caused by proposed projects are examined. Geographical Information Systems (GIS) are crucially efficient tools for impact assessment and their use is likely to dramatically increase in the near future. GIS have been applied to a wide range of different impact assessment projects and dams among them have been taken as the case work in this article. EIA Regulation in force in Turkey requires the analysis of steering natural processes that can be adversely affected by the proposed project, particularly in the section of the analysis of the areas with higher landscape value. At this point, the true potential value of GIS lies in its ability to analyze spatial data with accuracy. This study is an attempt to analyze by GIS the areas with higher landscape value in the impact assessment of dam constructions in the case of Seyhan-K?prü Hydroelectric Dam project proposal. A method needs to be defined before the overlapping step by GIS to analyze the areas with higher landscape value. In the case of Seyhan-K?prü Hydroelectric Dam project proposal of the present work, considering the geological conditions and the steep slopes of the area and the type of the project, the most important natural process is erosion. Therefore, the areas of higher erosion risk were considered as the Areas with Higher Landscape Value from the conservation demands points of view.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号