首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
环保管理   1篇
污染及防治   1篇
  2013年   1篇
  2008年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
The purpose of this investigation was to determine the influence of humic acids (HA) and Ca-montmorillonite (CaM) on the solid-phase extraction (SPE) efficiency of atrazine, alachlor and α-cypermethrin from water samples at various pH-values. The nature and intensity of binding of the studied pesticides to CaM were determined by X-ray diffraction analysis and termogravimetric analysis (TGA) test. The studied pesticides eluted from discs were analysed by thin-layer chromatography (TLC). The effects of CaM and humic acid were generally pH-dependent and acted independently in extraction efficiency influence. Lower recovery of pesticides was observed at higher pH values when CaM was ≥0.1 g and was attributed to greater dispersion of clay, increased surface area and subsequent adsorption. Concentrations of dissolved organic carbon (DOC) in humic acid had less effect on the extraction efficiency when water was at pH 8 compared to water at pH 2, which was probably due to greater nonpolar interactions of the pesticides to the charge-neutralized humic acid molecule.  相似文献   
2.
The concentrations of sediment and turbidity in stream water were monitored during culvert removals to determine the short term effects of road obliteration. Sediment concentration was measured at 11 stream crossings among two locations in Idaho and one in Washington. Sediment concentration immediately below the culvert outlet exceeded levels above the culvert outlet by at least three orders of magnitude at all stream crossings. Sediment yields ranged from 170 to less than 1kg in the 24-h period following culvert removal. Turbidity exceeded the regulatory limits during culvert removal at all locations monitored in this study and remained above the limits beyond the monitoring periods of 24h at four of the locations. Sediment concentrations 100m downstream of the culvert outlet were reduced by an order of magnitude, but did not change the turbidity values sufficiently to meet regulatory limits. Sediment concentrations an average of 810m downstream of the culvert outlet were similar to sediment concentrations above the culvert for the entire excavation period and turbidity regulations were met. Mitigation consisting of two straw bales placed in the stream caused a significant reduction in sediment yield from an average of 67kg to an average of 1.6kg.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号