首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   7篇
  免费   0篇
废物处理   1篇
环保管理   4篇
综合类   2篇
  2017年   1篇
  2012年   1篇
  2010年   1篇
  2006年   1篇
  2005年   1篇
  1986年   1篇
  1983年   1篇
排序方式: 共有7条查询结果,搜索用时 170 毫秒
1
1.
Merten, Eric C., Nathaniel A. Hemstad, Randall K. Kolka, Raymond M. Newman, Elon S. Verry, and Bruce Vondracek, 2010. Recovery of Sediment Characteristics in Moraine, Headwater Streams of Northern Minnesota After Forest Harvest. Journal of the American Water Resources Association (JAWRA) 46(4): 733-743. DOI: 10.1111/j.1752-1688.2010.00445.x Abstract: We investigated the recovery of sediment characteristics in four moraine, headwater streams in north-central Minnesota after forest harvest. We examined changes in fine sediment levels from 1997 (preharvest) to 2007 (10 years postharvest) at study plots with upland clear felling and riparian thinning, using canopy cover, proportion of unstable banks, surficial fine substrates, residual pool depth, and streambed depth of refusal as response variables. Basin-scale year effects were significant (p < 0.001) for all responses when evaluated by repeated-measures ANOVAs. Throughout the study area, unstable banks increased for several years postharvest, coinciding with an increase in windthrow and fine sediment. Increased unstable banks may have been caused by forest harvest equipment, increased windthrow and exposure of rootwads, or increased discharge and bank scour. Fine sediment in the channels did not recover by summer 2007, even though canopy cover and unstable banks had returned to 1997 levels. After several storm events in fall 2007, 10 years after the initial sediment input, fine sediment was flushed from the channels and returned to 1997 levels. Although our study design did not discern the source of the initial sediment inputs (e.g., forest harvest, road crossings, other natural causes), we have shown that moraine, headwater streams can require an extended period (up to 10 years) and enabling event (e.g., high storm flows) to recover from large inputs of fine sediment.  相似文献   
2.
An evaluation of various metal purification processes subsequent to the leaching processing of the neodymium (Nd) product from neodymium–iron–boron (Nd–Fe–B) magnets has been conducted. These post-leaching purification processes included precipitation; replacement and electrolysis were studied in order to check the purity of the recovered neodymium. A hydrometallurgical investigation was adopted to digest the metal content of the scrap Nd–Fe–B magnets for the recovery of valuable Nd metal and other metals such as Fe, B, Co and Ni. The effect of leaching conditions such as solid-to-liquid ratio and temperature were optimized and 100 % Nd, 100 % Fe, 100 % B and 85.87 % Co leaching efficiencies were achieved under these conditions. The coating material of the magnet, Ni, achieved 50 % impregnation after increasing the reaction temperature to 70 °C. The metals present in the optimal leaching solution were recovered 99 % by pH adjustment. However, the replacement had the highest separation efficiency for the recovery of Nd metal. Further, the optimal leaching Nd–Fe–B solution was subjected to the electrolysis processes in order to verify the recovery efficiency for all metals.  相似文献   
3.
4.
ABSTRACT: The impact of forests on water has- been a subject of argument for more than a century. It still is; and many studies conform that there is no single right answer in the debate. In the Lake States, clearcutting natural peatlands will not change annual stream-flow nor will it seriously impact water quality if logging is done on frozen soils. However, clearcutting will cause water tables to fluctuate more, ranging from 9 cm higher to 19 cm lower than in peatlands with mature forests. Clearcutting upland hardwoods or conifers will increase annual strearnflow by 9 to 20 cm (a 30- to 80-percent increase). Streamfiow returns to preharvest levels in 12 to 15 years. Annual peak flows are at least doubled and snowmelt flood-peak increases may persist for 15 years. Water quality is not widely impacted, but operating logging equipment in stream channels will cause channel clogging by filamentous algae and loss of fish habitat. Permanent changes from forest to agricultural and urban land use on two-thirds or more of a watershed will significantly increase the size of flood peaks in the 2- to 30-year return interval storm or snowmelt.  相似文献   
5.
6.
Mass wasting and channel incision are widespread in the Nemadji River watershed of eastern Minnesota and northwestern Wisconsin. While much of this is a natural response to glacial rebound, sediment coring and tree ring data suggest that land use has also influenced these erosional processes. We characterized land use, inventoried mass wasting, surveyed stream channels and collected discharge data along segments of five streams in the Nemadji River watershed. Due to natural relief in this region, wetlands and agricultural lands are concentrated in the flatter terrain of the uplands of the Nemadji watershed, while forestland (coniferous or deciduous) is concentrated in the deeply incised (50-200% slope) stream valleys. Bankfull discharge was higher where forests had been converted from coniferous to deciduous forests and where there were fewer wetlands. Mass wasting increased exponentially with bankfull flows. While mass wasting was not correlated with forest type conversion and agricultural land use, it was negatively dependent upon wetland extent in headwater areas. Interactions between the spatial distribution of land use and terrain obfuscate any clear cause-and-effect relationships between land use, hydrology and fluvial processes.  相似文献   
7.
ABSTRACT: Clearcutting aspen from the upland portion of an upland peatland watershed in north central Minnesota caused snowmelt peak discharge to increase 11 to 143 percent. Rainfall peak discharge size increased as much as 250 percent during the first two years after clearcutting, then decreased toward precutting levels in subsequent years. Storm flow volumes from rain during the first two years increased as much as 170 percent but declined to preharvest volumes in the third year. Snowmelt volumes did not significantly change. Snowmelt peak discharge occurred about four to five days earlier after clearcutting, but the timing of storm flow from rainfall was not changed. Snowmelt peaks remained above precut size for nine years after clearcutting on an area undergoing natural regeneration to aspen saplings. Partial cutting - up to approximately one-half of the watershed - reduced peak snowmelt discharge because melt was desynchronized in cleared and forested parts. Clearing more than 2/3 of the watershed caused snowmelt flood peak size to double during years with snow packs in excess of seven inches of water that remained until a day when maximum air temperatures exceeded 60d?F.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号