排序方式: 共有4条查询结果,搜索用时 424 毫秒
1
1.
The Science of Nature - 相似文献
2.
Michael Ahlheim Benchaphun Ekasingh Jirawan Kitchaicharoen Andreas Neef Chapika Sangkapitux 《Journal of Environmental Planning and Management》2010,53(2):163-182
Although contingent valuation is the dominant technique for the valuation of public projects, especially in the environmental sector, the high costs of contingent valuation surveys prevent the use of this method for the assessment of relatively small projects. The reason for this cost problem is that typically only contingent valuation studies which are based on face-to-face interviews are accepted as leading to valid results. Particularly in countries with high wages, face-to-face surveys are extremely costly considering that for a valid contingent valuation study a minimum of 1000 completed face-to-face interviews is required. This paper tries a rehabilitation of mail surveys as low-budget substitutes for costly face-to-face surveys. Based on an empirical contingent valuation study in Northern Thailand, it is shown that the validity of mail surveys can be improved significantly if so-called Citizen Expert Groups are employed for a thorough survey design. 相似文献
3.
Scherrenberg SM Neef R Menkveld HW van Nieuwenhuijzen AF van der Graaf JH 《Water environment research》2012,84(1):25-33
In 2000, the European Union adopted the European Water Framework Directive (WFD) (European Commission, 2000). The WFD focuses on increasingly stringent nutrient standards including ultra low nitrogen (< 2.2 mg N-total/L) and phosphorus concentrations (< 0.15 mg total phosphorus/L) in receiving surface waters and in relevant point sources like wastewater treatment plant (WWTP) effluent. Expansion of WWTPs with advanced post-treatment processes, like effluent filtration, is widely proposed to meet possible future effluent discharge standards. When combining biological nitrate-nitrogen and chemical phosphorus removal in one filter, phosphorus limitation in the denitrifying process may occur. This study investigated where in the filter bed and under which conditions phosphorus limitation occurs. Profile measurements for nitrate, nitrite, and orthophosphorus (PO4-P) combined with chemical oxygen demand (COD) and 02 were conducted. Results showed that the required PO4-P/NOx-N ratio is approximately 0.006 mg/mg after phosphorous precipitation and flocculation. Profile measurements have proven to be an applicable and useful tool. It showed how nitrate and orthophosphorus are removed through the filter bed based on the PO4-P/NOx-N ratio. When orthophosphorus is removed more rapidly and efficiently compared to nitrate, the PO4-P/NOx-N ratio decreases. When PO4-P/NOx-N ratio thresholds are approximately 0.006 mg/mg for a certain period of time and water temperatures varied significantly, orthophosphorus limitation may occur. Changing the filter-bed configuration or decreasing the coagulant dosage can prevent limitation of the denitrifying process because of a phosphorous shortage. 相似文献
4.
1