首页 | 本学科首页   官方微博 | 高级检索  
     检索      

沈阳市地铁一号线项目施工期环境影响及对策研究
引用本文:靳之更,李巍.沈阳市地铁一号线项目施工期环境影响及对策研究[J].环境保护科学,2006,32(1):67-70.
作者姓名:靳之更  李巍
作者单位:沈阳环境科学研究院,沈阳,110016
摘    要:通过对沈阳地铁一号钱施工期产生的环境影响综合分析,研究该项目在建设中产生的噪声、振动、废水、废气及固体废弃物等污染物产生的规律和发生量,并提出缓解和控制环境影响的措施。

关 键 词:生态类型影响项目  施工期  对策措施
收稿时间:2005-02-03
修稿时间:2005-02-03

Environmental Impact and Countermeasure Study on Construction Time of Underground No.1 Project in Shenyang
Jin ZhiGeng;Li Wei.Environmental Impact and Countermeasure Study on Construction Time of Underground No.1 Project in Shenyang[J].Environmental Protection Science,2006,32(1):67-70.
Authors:Jin ZhiGeng;Li Wei
Abstract:The paper analyzed synthetically the environmental impact that is produced in construction time of under ground No. one of Shenyang, studied the generant rule and quantity of pollutants such as noise, vibration, waste water, waste gas and solid offal and etc. , proposed eonutermeasures to alleviate and control environmental impact.
Keywords:Ecology Influenced Project  Construction Time  Countermeasure
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号