石横一期烟囱冲洗水及排液系统改造
引用本文:吴刚.石横一期烟囱冲洗水及排液系统改造[J].电力环境保护,2010,26(5):45-47.
作者姓名:吴刚
作者单位:国电山东石横发电厂,山东,肥城,271621
摘    要:介绍了石横电厂一期烟气脱硫技改项目中烟囱及入口烟道排液系统改造情况,论述了烟囱及烟道排液系统改造要点、运行方式,提出了烟囱排液系统的改造方案。

关 键 词:燃煤电厂  烟囱排液  系统改造

Stack wash water and drain system reformation of Shiheng Power Plant
WU Gang.Stack wash water and drain system reformation of Shiheng Power Plant[J].Electric Power Environmental Protection,2010,26(5):45-47.
Authors:WU Gang
Abstract:The stack drain system reformation of FGD technical project in Shiheng Power Plant was introduced. The main point of stack and drain system reformation were elaborated, The operation mode was analyzed. The stack drain system reformation plan was proposed finally.
Keywords:coal - fired power plant  stack drain  system reformation