首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Evaluation and comparison of alarm reset modes in advanced control room of nuclear power plants
Authors:Fei-Hui Huang  Sheue-Ling Hwang  Tzu-Chung Yenn  Yuan-Chang Yu  Chong-Cheng Hsu  Hao-Wu Huang  
Institution:aInstitute of Industrial Engineering and Engineering Management, National Tsing Hua University, Hsinchu 300, Taiwan, ROC;bInstitute of Nuclear Energy Research, Lungtan 325, Taiwan, ROC
Abstract:An automation function has been widely applied in main control room of nuclear power plants (NPPs). The alarm system of fourth nuclear power plant (FNPP) in Taiwan is also going to be developed with automatic technology that is expected to support the operators’ performance and reduce the number of alarms. In this study, an experiment with a training simulator as an advanced alarm system was conducted to compare the effects of different alarm reset modes on performance and subjective ratings. The objective was to evaluate the practicability of alarm system with only auto-reset function in FNPP. Results revealed that, using the auto-reset mode, participants had lower task load index (TLX) on effort in the first test trial and was more satisfied under multi-task condition. In contrast, using manual reset mode, participants were more satisfied on alarm handling, monitoring, and decision making. In other words, both reset modes are necessary to assist the operator in different aspects, but with only single reset mode is insufficient. The reset function in advanced alarm system therefore should be very flexible.
Keywords:Alarm system  Simulator  Advanced control rooms  Automatic system
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号