走向工作面贯通上山与支架快速回撤技术
引用本文:王志强,王树帅,苏泽华,黄鑫.走向工作面贯通上山与支架快速回撤技术[J].中国安全生产科学技术,2020,16(1):18-24.
作者姓名:王志强  王树帅  苏泽华  黄鑫
作者单位:(1.中国矿业大学(北京) 能源与矿业学院,北京 100083;2.中国矿业大学(北京)共伴生能源精准开采北京市重点实验室,北京 100083;3.中国矿业大学(北京)煤炭安全开采与地质保障国家级实验教学示范中心,北京 100083)
基金项目:* 基金项目: 国家自然科学基金青年基金项目(51404270);国家自然科学基金面上项目(51774289);中央高校基本科研业务费专项资金项目(2011QZ06);西部煤炭绿色安全开发国家重点实验室开放基金项目(SKLCRKF1903)
摘    要:针对走向工作面停采线与上山之间的护巷煤柱造成煤炭损失,支架回撤工艺复杂、巷道掘进量大等问题,提出走向工作面贯通上山与支架快速回撤技术。工作面贯通采区上山,利用上山回撤支架。在贯通前,利用压力拱模型分析剩余煤柱应力变化规律,并结合极限平衡区公式,确定让压煤柱为8 m;对贯通前基本顶合理断裂位置、让压调节机制、末采阶段采高进行了分析确定,并采取上山巷内补强支护及挂绳铺网措施。贯通上山后,首先利用支架对上山留巷,完成留巷后,利用上山回撤支架,先将上部端头3架逆时针旋转90°作为掩护架,在对剩余支架逐架回撤时,3个掩护架呈现台阶型。提出的技术取消了护巷煤柱及回撤通道,提高了煤炭采出率,减少了巷道掘进量,简化了回撤工艺。

关 键 词:贯通上山  支架回撤  末采工艺  煤柱应力  支架留巷

Technologies of uphill transfixion and rapid retracing of brackets in along strike working face
WANG Zhiqiang,WANG Shushuai,SU Zehua,HUANG Xin.Technologies of uphill transfixion and rapid retracing of brackets in along strike working face[J].Journal of Safety Science and Technology,2020,16(1):18-24.
Authors:WANG Zhiqiang  WANG Shushuai  SU Zehua  HUANG Xin
Institution:(1.School of Energy and Mining Engineering,China University of Mining and Technology (Beijing),Beijing 100083,China;2.Beijing Key Laboratory for Precise Mining of Intergrown Energy and Resources,China University of Mining and Technology (Beijing),Beijing 100083,China;3.National Demonstration Center for Experimental Safe Coal Mining and Geological Guarantee Education,China University of Mining and Technology (Beijing),Beijing 100083,China)
Abstract:Aiming at the problems that the entry protection coal pillars between the stopping line and uphill in the along strike working face will cause the coal loss,the retracing process of brackets is complex and the excavation amount is large,the technologies of uphill transfixion and rapid retracing of brackets in the along strike working face were put forward.The working face transfixed the uphill,and the brackets were retracted by using the uphill.Before the transfixion,the change laws of residual coal pillar stress were analyzed by using the pressure arch model,and the yielding coal pillar was determined as 8 m with the formula of limit equilibrium area.The reasonable fracture position of basic roof,yielding adjustment mechanism and mining height at final mining stage before the transfixion were analyzed and determined,and the measures of reinforced support and lanyard and paving were adopted in the uphill roadway.After the uphill transfixion,the uphill entry retaining was conducted by using the brackets,and the brackets were retracted by using the uphill after completing the entry retaining.Three brackets at upper end were anticlockwise rotated 90° as the shield brackets,and they presented the step type when retracting the remaining brackets one by one.The technology canceled the entry protection coal pillars and retracement channel,improved the coal mining rate,reduced the roadway excavation amount and simplified the retracement process.
Keywords:uphill transfixion  bracket retracing  final mining process  stress of coal pillar  bracket entry retaining
本文献已被 CNKI 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息