首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Conceptual Site Model Development and Phased Remedy Implementation to Achieve Vapor Screening Goals at a Former Dry Cleaner
Authors:Michael Jordan
Institution:Terracon Consultants, Inc.
Abstract:Tetrachloroethene (PCE) releases at a former dry cleaner resulted in impacts to soil and shallow groundwater beneath and adjacent to the building. Subsurface impacts led to vapor intrusion with PCE concentrations between 900 and 1,200 micrograms per cubic meter (μg/m3) in indoor air. The migration pathways of impacted soil vapor were evaluated through implementation of a helium tracer test and vapor sampling of an exterior concrete block wall. Results confirmed that the concrete block wall acted as a conduit for vapor intrusion into the building. A combination of remediation efforts focused on mass reduction in the source area as well as mitigation efforts to inhibit vapor migration into the building. Excavation of soils beneath the floor slab and installation of a spray‐applied vapor barrier resulted in PCE concentrations in indoor air decreasing by over 97.9 percent. Operation of an active ventilation system installed under the floor slab and groundwater remediation via injections of nano‐scale zero valent iron (nZVI) further reduced PCE concentrations in indoor air by over 99.8 percent compared to baseline conditions. While significant reductions of PCE concentrations in groundwater were observed within two months after injection, maximum reductions to PCE concentrations in indoor air were not observed for an additional 12 months. © 2014 Wiley Periodicals, Inc.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号