首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Interval-Parameter Conditional Value-at-Risk Two-Stage Stochastic Programming Model for Management of End-of-Life Vehicles
Authors:Simic  Vladimir
Institution:1.Faculty of Transport and Traffic Engineering, University of Belgrade, Vojvode Stepe 305, Belgrade, 11000, Serbia
;
Abstract:

The management of end-of-life vehicles conserves natural resources, provides economic benefits, and reduces water, air, and soil pollution. Sound management of end-of-life vehicles is vitally important worldwide thus requiring sophisticated decision-making tools for optimizing its efficiency and reducing system risk. This paper proposes an interval-parameter conditional value-at-risk two-stage stochastic programming model for management of end-of-life vehicles. A case study is conducted in order to demonstrate the usefulness of the developed model. The model is able to provide the trade-offs between the expected profit and system risk. It can effectively control risk at extremely disadvantageous availability levels of end-of-life vehicles. The formulated model can produce optimal solutions under predetermined decision-making risk preferences and confidence levels. It can simultaneously determine the optimal long-term allocation targets of end-of-life vehicles and reusable parts as well as capital investment, production planning, and logistics management decisions within a multi-period planning horizon. The proposed model can efficiently handle uncertainties expressed as interval values and probability distributions. It is able to provide valuable insights into the effects of uncertainties. Compared to the available models, the resulting solutions are far more robust.

Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号