首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Deposition Inputs,Water Quality and Liming Effectiveness
Authors:T R K Dalziel
Institution:PowerGen plc, Power Technology, Ratcliffe-on-Soar , Nottingham NG11, OEE, England
Abstract:Rainfall quantity and quality, and stream and loch water quality have been monitored throughout the Loch Fleet Project. This has allowed the effects of liming of parts of the catchment to be monitored, and assessments made of the effectiveness and duration of these treatments. Rainfall over 1989–1993 fluctuated around the long-term average of 2100 mm. Over this time, year by year variations in acid or sulphate loading from deposition was evident and quite substantial. There was no trend, however, reflecting reductions in national sulphur emissions. Liming parts of the catchment in 1986 increased stream and loch water pH and calcium concentrations and reduced inorganic aluminium concentrations. Improved stream and loch water quality has been maintained for more than eight years since liming.
Keywords:Deposition inputs  water quality  liming effectiveness  Loch Fleet
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号