首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于FBN地铁深基坑施工渗漏风险评估模型及应用*
引用本文:吴波,农宇,蒙国往,丘伟兴,黄惟.基于FBN地铁深基坑施工渗漏风险评估模型及应用*[J].中国安全生产科学技术,2022,18(5):178-185.
作者姓名:吴波  农宇  蒙国往  丘伟兴  黄惟
作者单位:(1.广西大学 土木建筑工程学院,广西 南宁 530004;2.东华理工大学 土木与建筑工程学院,江西 南昌 330032;3.广州城建职业学院 建筑工程学院,广东 广州 510925)
基金项目:* 基金项目: 国家自然科学基金项目(51478118,51678164);广西自然科学基金项目(2018GXNSFDA138009);广西科技计划项目(桂科AD18126011);广西特聘专家专项资金项目(20161103)
摘    要:为了解决由于地铁深基坑施工风险因素不确定性和基坑工程事故资料缺失导致传统风险分析方法不再满足实际需要的问题。探讨模糊集理论(FST)和贝叶斯网络(BN)的结合,介绍1种专家置信度指标,建立地铁深基坑渗漏风险评估指标体系,得到基于模糊贝叶斯网络(FBN)地铁深基坑施工渗漏风险评估模型。研究结果表明:将该方法应用于广州地铁十三号线某车站深基坑施工渗漏风险评估中,结果符合施工实际,接缝密封质量差等风险因素需加以措施控制,该方法可为后续施工风险评估提供实时支持。

关 键 词:模糊集理论  贝叶斯网络  地铁深基坑  风险分析

Risk assessment model of leakage in deep foundation pit construction of subway based on FBN and its application
WU Bo,NONG Yu,MENG Guowang,QIU Weixing,HUANG Wei.Risk assessment model of leakage in deep foundation pit construction of subway based on FBN and its application[J].Journal of Safety Science and Technology,2022,18(5):178-185.
Authors:WU Bo  NONG Yu  MENG Guowang  QIU Weixing  HUANG Wei
Institution:(1.College of Civil Engineering and Architecture,Guangxi University,Nanning Guangxi 530004,China;2.College of Civil Engineering and Architecture,Donghua University of Technology,Nanchang Jiangxi 330032,China;3.School of Architectural Engineering
Abstract:In order to solve the problem that the traditional risk analysis method no longer meets the actual needs due to the uncertainty of the risk factors of the subway deep foundation pit construction and the lack of accident data of the foundation pit construction,this paper discussed the combination of Fuzzy Set Theory (FST) and Bayesian Network(BN),and introduced an expert confidence index,an index system of leakage risk assessment for the deep foundation pit of subway was established,and a leakage risk assessment model for the deep foundation pit,which was proposed based on Fuzzy Bayesian Network(FBN).This method has applied to evaluate the construction leakage risk of a foundation pit which is a Station of Guangzhou Metro Line 13.The results show that the method was consistent with construction practice,and the risk factors such as poor sealing quality need to be controlled,this method could provide real-time support for subsequent construction risk assessment.
Keywords:fuzzy set theory  Bayesian network  subway deep foundation pit  risk analysis
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号