首页 | 本学科首页   官方微博 | 高级检索  
     检索      

曝气浸没固定生物膜反应器处理化粪池出水
引用本文:胡娜,赵丽敏,栗朋朋,成庆利.曝气浸没固定生物膜反应器处理化粪池出水[J].环境工程学报,2012,6(6):1957-1960.
作者姓名:胡娜  赵丽敏  栗朋朋  成庆利
作者单位:1. 华北水利水电学院环境与市政工程学院,郑州,450011
2. 河南大学土木建筑学院,开封,475004
基金项目:河南省教育厅自然科学研究计划(2010B610008);河南大学自然科学基础研究项目(2010YBZR050).
摘    要:研究了以丝瓜络作为生物膜载体的曝气浸没固定生物膜反应器在处理化粪池出水时的可行性以及运行性能。结果表明,丝瓜络生物膜反应器可以在2周内成功启动;水力停留时间(HRT)对COD和氨氮的去除效果有显著影响,在水力停留时间为4 h的条件下,系统对COD和氨氮的去除率分别达到了78.5%和96.4%。另外,系统有较强抗有机污染物冲击负荷的能力,当COD和氨氮的进水浓度分别为59.3 mg/L和15.9 mg/L时,系统对有机污染物的去除效果较佳,去除率分别达到了80.0%和98.9%。

关 键 词:化粪池出水  生物膜  水力停留时间  冲击负荷

Treatment of effluent from septic tank by an aerated submerged fixed-film reactor
Hu N,Zhao Limin,Li Pengpeng and Cheng Qingli.Treatment of effluent from septic tank by an aerated submerged fixed-film reactor[J].Techniques and Equipment for Environmental Pollution Control,2012,6(6):1957-1960.
Authors:Hu N  Zhao Limin  Li Pengpeng and Cheng Qingli
Institution:1(1.Institute of Environmental & Municipal Engineering,North China University of Water Resources and Electric Power, Zhengzhou 450011,China;2.College of Civil Engineering and Architecture,Henan University,Kaifeng 475004,China)
Abstract:The purpose of this paper is to study the feasibility and operational performance for the treatment of the effluent from septic tank by applying an aerated submerged fixed-film reactor with loofah sponge as biofilm carrier.The results showed that it took no more than two weeks to complete the microbiological cultivation and acclimation.The hydraulic retention time(HRT) had a significant influence on the COD and NH3-N removal,their removal efficiencies reached 78.5% and 96.4%,respectively under the condition of HRT=4 h.Additionally,the loofah sponge biofilm system had strong tolerance to organic shock loading in the experiment,it was noted that the effluent from septic tank could be preferably treated with influent COD concentration of 59.3 mg/L and NH3-N concentration of 15.9 mg/L,the corresponding removal efficiencies of COD and NH3-N were 80.0% and 98.9%,respectively.
Keywords:septic tank effluent  biofilm  HRT  shock loading
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《环境工程学报》浏览原始摘要信息
点击此处可从《环境工程学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号