首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Constructed wetlands for mitigation of atrazine-associated agricultural runoff
Authors:Moore M T  Rodgers J H  Cooper C M  Smith S
Institution:USDA-ARS National Sedimentation Laboratory, 598 McElroy Drive, Oxford, MS 38655, USA. moore@sedlab.olemiss.edu
Abstract:Atrazine was amended into constructed wetlands (59-73x14x0.3 m) for the purpose of monitoring transport and fate of the pesticide to obtain information necessary to provide future design parameters for constructed wetlands mitigation of agricultural runoff. Following pesticide amendment, a simulated storm and runoff event equal to three volume additions was imposed on each wetland. Targeted atrazine concentrations were 0 microg/l (unamended control), 73 microg/l, and 147 microg/l. Water, sediment, and plant samples were collected weekly for 35 days from transects longitudinally distributed throughout each wetland and were analyzed for atrazine using gas chromatography. Between 17 and 42% of measured atrazine mass was within the first 30-36 m of wetlands. Atrazine was below detection limits (0.05 microg/kg) in all sediment and plant samples collected throughout the duration of this study. Aqueous half lives ranged from 16 to 48 days. According to these data, conservative buffer travel distances of 100-280 m would be necessary for effective runoff mitigation.
Keywords:Atrazine  Fate  Constructed wetlands  Mitigation
本文献已被 ScienceDirect PubMed 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号