首页 | 本学科首页   官方微博 | 高级检索  
     检索      

抽水蓄能电站输水系统斜井开挖施工安全管理
引用本文:李伟,关志华.抽水蓄能电站输水系统斜井开挖施工安全管理[J].中国安全生产科学技术,2009,5(2):162-164.
作者姓名:李伟  关志华
作者单位:中国水利水电第一工程局,长春,130062
摘    要:在抽水蓄能电站中斜井开挖施工历来是一个难点。为保证高水头,斜井段多数采用50°倾角,一般都较长。陡倾角长斜井施工由于施工环境特殊,施工难度大,存在诸多不安全因素。斜井开挖安全管理是施工过程中的全过程安全生产监督、检查管理、安全控制。

关 键 词:蓄能电站  斜井开挖  安全管理

Safety management on excavation construction of inclined shaft for water conveyance system of pumped-storage power station
LI Wei,GUAN Zhi-hua.Safety management on excavation construction of inclined shaft for water conveyance system of pumped-storage power station[J].Journal of Safety Science and Technology,2009,5(2):162-164.
Authors:LI Wei  GUAN Zhi-hua
Institution:Sinohydro Engineering Bureau No.1;Changchun 130062;China
Abstract:The excavation of inclined shaft was always difficult in the construction of Pumped-Storage Power Station. To ensure high-head, the angle for the segments of inclined shaft were mainly 50 ° and generally longer. Because construction circumstances of high dip angle and long inclined shaft was special, the construction was difficult and there were many insecurity factors. Safety management of inclined shaft excavation was the whole process for safety production supervision, examination management and security control in the construction.
Keywords:pumped-storage power station  inclined shaft excavation  safety management  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号