首页 | 本学科首页   官方微博 | 高级检索  
     检索      


ACCOUNTING AND REPAYMENT PROVISIONS OF THE PICK-SLOAN MISSOURI BASIN PROGRAM1
Authors:Bruce B Johnson
Abstract:ABSTRACT: The accounting and repayment practices employed by the Water and Power Resources Service (WPRS) greatly distort the actual resource allocation process and the ultimate repayment to the Federal Treasury. Through a series of transfers of capital repayment obligations to future development with modest or no interest charges, the repayment is reduced to only a fraction of the amount implied. In the case of the Pick-Sloan Missouri Basin Program, the public subsidy of hydroelectric power is estimated to be $2 for every $1 of repayment. For irrigation investment, the direct repayment to the Federal Treasury is less than 10 percent of the annualized cost of the public investment, with irrigators repaying at a rate of less than $0.03 for every dollar of public expenditure.
Keywords:accounting  repayment  water projects  Pick-Sloan
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号