首页 | 本学科首页   官方微博 | 高级检索  
     检索      


RIVER BASIN SIMULATION MODELS: GUIDELINES FOR THEIR USE IN WATER RESOURCES PLANNING1
Authors:Kenneth M Strzepek  David H Marks
Abstract:ABSTRACT: Simulation models constructed to estimate the physical and economic performance of alternative river basin development configurations have been widely used since the start of the Harvard Water Program in the early 1960's. These models have proved useful in choosing from among several potential river basin configurations, since they can rapidly evaluate each configuration's expected performance. However, when dealing with large scale river basin development projects, in which over 50 or 100 alternative reservoirs, irrigation areas, and other components must be considered, it is sometimes quite difficult to effectively use a simulation model to rapidly identify those combinations of projects which best satisfy the development objectives. The purpose of this paper is to describe how a simulation model was used in the analysis of a complex river basin development project in Eastern Europe, and how the problems of scale were confronted and solved. The author's experience on this projet is used to derive a set of general guidelines which may be helpful in other simulation studies.
Keywords:river basin simulation  evaluation criteria
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号