首页 | 本学科首页   官方微博 | 高级检索  
     

盐酸浸出提取赤泥中铝和铁的工艺条件优化
引用本文:谢武明, 张宁, 李俊, 周峰平, 马峡珍, 顾舸, 张文治. 盐酸浸出提取赤泥中铝和铁的工艺条件优化[J]. 环境工程学报, 2017, 11(10): 5677-5682. doi: 10.12030/j.cjee.201611059
作者姓名:谢武明  张宁  李俊  周峰平  马峡珍  顾舸  张文治
作者单位:1. 广东工业大学环境科学与工程学院, 广州 510006; 2. 广东工业大学轻工化工学院, 广州 510006; 3. 广东环境保护工程职业学院, 佛山 528216
基金项目:广东省重大科技专项(2015B010110004) 广州市科技计划项目(2014Y2-00214) 广东省大学生创新创业训练计划项目(201411845213,201411845147)
摘    要:系统研究盐酸浸出赤泥中铝和铁的过程,考察酸浸温度、盐酸浓度、酸浸时间、液固比以及赤泥粒度对铝、铁浸出率的影响。单因素实验和正交实验结果得出,在影响浸出率的酸浸温度、盐酸浓度、酸浸时间和液固比对铁、铝的浸出率的影响几个因素中,酸浸温度和盐酸浓度的影响最大,液固比和浸出时间其次。盐酸酸浸的最佳工艺条件为:赤泥粒度150 μm、酸浸温度80 ℃、盐酸浓度10 mol·L-1、液固比8∶1(V/m)、浸出时间150 min,此时铝的浸出率为96.7%,铁的浸出率为95.1%,铁铝总浸出率96.0%。

关 键 词:赤泥   盐酸   酸浸法   铁浸出率   铝浸出率
收稿时间:2017-02-06

Optimization of condition for extraction of aluminum and iron from red mud by hydrochloric acid leaching
XIE Wuming, ZHANG Ning, LI Jun, ZHOU Fengping, MA Xiazhen, GU Ge, ZHANG Wenzhi. Optimization of condition for extraction of aluminum and iron from red mud by hydrochloric acid leaching[J]. Chinese Journal of Environmental Engineering, 2017, 11(10): 5677-5682. doi: 10.12030/j.cjee.201611059
Authors:XIE Wuming  ZHANG Ning  LI Jun  ZHOU Fengping  MA Xiazhen  GU Ge  ZHANG Wenzhi
Affiliation:1. School of Environment Science and Engineering, Guangdong University of Technology, Guangzhou 510006, China; 2. School of Chemical Engineering and Light Industry, Guangdong University of Technology, Guangzhou 510006, China; 3. Guangdong Polytechnic of Environment Protection Engineering, Foshan 528216, China
Abstract:The process of extraction of aluminum and iron from red mud by hydrochloric acid leaching was investigated systematically and the effect of leaching temperature, hydrochloric acid concentration, leaching time, liquid-solid ratio and particle size on the process were investigated. The results of single factor test and orthogonal test showed that the leaching temperature, and hydrochloric acid concentration had a significant effect on leaching rate of iron and aluminum, followed by the liquid-solid ratio and leaching time. The optimum conditions for extraction of aluminum and iron from red mud by hydrochloric acid leaching can be determined as the red mud particle size of 150 um, the leaching temperature of 80℃, the hydrochloric acid concentration of 10 mol·L-1, the liquid/solid ratio of 8:1 (V/m) and the leaching time of 150 min, under which aluminum leaching rate of 96.7%, iron leaching rate of 95.1% and total leaching rate of aluminum and iron of 96.0% were achieved.
Keywords:red mud  hydrochloric acid  acid leaching method  iron leaching rate  aluminum leaching rate
本文献已被 CNKI 等数据库收录!
点击此处可从《环境工程学报》浏览原始摘要信息
点击此处可从《环境工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号