首页 | 本学科首页   官方微博 | 高级检索  
     

上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析
引用本文:李亮,孟浩,全超,吕文娟,史伟,宋业平. 上游式筑坝法尾矿坝的安全系数随堆筑坝高变化分析[J]. 中国安全生产科学技术, 2011, 7(7): 31-34
作者姓名:李亮  孟浩  全超  吕文娟  史伟  宋业平
作者单位:青岛理工大学土木工程学院,青岛,266033
基金项目:国家自然科学基金,山东省高等学校科技计划项目,高等学校博士学科点专项科研基金
摘    要:对于投资较少的上游式尾矿筑坝法而言,在实际的堆积施工过程中,由于很难严格按照设计的坡比进行每一级子坝的堆筑,导致矿方无法及时、真正掌握当前尾矿坝的受力性能和稳定状态。因此,针对某典型尾矿坝剖面,采用迈达斯商业软件试用版对尾矿坝的堆积过程进行了模拟分析,利用强度折减有限元方法对施工当前状态的尾矿坝进行了边坡稳定分析,得到了当前状态尾矿坝的塑性剪应变云图和相对应的抗滑稳定安全系数。比较了尾矿坝安全系数随着子坝堆筑的变化情况,结果发现:随着堆积子坝的进行,尾矿坝的整体抗滑稳定系数逐渐减小,此外在初期坝和一级子坝的下游坡脚处容易出现相对较大的变形。此研究结果为矿部管理部门及时了解尾矿坝的稳定程度和实际生产提供了技术支持。

关 键 词:尾矿坝  边坡  稳定性评价  上游式尾矿筑坝法

Study on variation of safety factor with the dam height for the tailing dam by upstream embankment method
LI Liang,MENG Hao,QUAN Chao,LV Wen-juan,SHI Wei,SONG Ye-ping. Study on variation of safety factor with the dam height for the tailing dam by upstream embankment method[J]. Journal of Safety Science and Technology, 2011, 7(7): 31-34
Authors:LI Liang  MENG Hao  QUAN Chao  LV Wen-juan  SHI Wei  SONG Ye-ping
Affiliation:(School of Civil Engineering,Qingdao Technological University,Qingdao 266033,China)
Abstract:The upstream embankment method is widely used due to its smaller investment in the construction of tailing dams.However,the designed slope inclination is not strictly observed in the real construction of embankment,which yields the difficulty of administrator to be timely and really familiar with the stability state and mechanical performance of the current tailing dam.One typical tailing dam cross section was employed to perform the finite element analysis by using the MIDAS-trial version software and Strength Reduction Method technique.The factors of safety and plastic shear strain contours of the current tailing dam were obtained from the finite element analysis results of the MIDAS trial version.In order to find the variation of safety factor with the increment of embankment height,the factors of safety were compared against each increment of embankment.The results showed that the safety factor became gradually lower with the increment of embankment and larger deformation was found out in the toes of original tailing dam and first-stage tailing dam.The results can provide the administrator with the timely factors of safety of the current tailing dam and also can serve the real construction of increment of embankment.
Keywords:tailing dam  slope  evaluation of stability  upstream embankment method
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号