Abstract: | ABSTRACT: This paper looks at the use of off-line detention systems as a means of stormwater management. Conventional detention basins are typically designed and built as in-line systems in which all runoff is directed to the basin. Off-line systems are designed so that only a portion of the runoff is directed to the basin. Several simulation experiments were run to examine the behavior of in-line and off-line systems designed to reduce the peak flow from a developed area to the pre-development level. The results demonstrate that off-line systems require considerably less storage than in-line systems to achieve the same management goal. The results also show that off-line and in-line systems have significantly different flow-duration characteristics with the off-line system generally producing lower flows over longer periods. Unfortunately, off-line systems may exacerbate downstream flooding problems, especially when used in the upper portions of a watershed. Nevertheless, an off-line system can be an alternative to in-line detention in many cases. |