首页 | 本学科首页   官方微博 | 高级检索  
     

建设项目卫生防护距离的确定方法
引用本文:林莉. 建设项目卫生防护距离的确定方法[J]. 电力环境保护, 2008, 24(6)
作者姓名:林莉
作者单位:大连市环境科学设计研究院,辽宁,大连,116023
摘    要:建设项目环境影响评价过程中的选址问题至关重要,卫生防护距离的可达性是必不可少的因素.以合成氨厂为例,探讨环境影响评价中卫生防护距离的确定方法,对无组织排放源、源强及参数的确定进行了说明.

关 键 词:无组织排放  卫生防护距离  环境影响评价

Determination of health protection standard for construction projects
LIN Li. Determination of health protection standard for construction projects[J]. Electric Power Environmental Protection, 2008, 24(6)
Authors:LIN Li
Abstract:The site selection is rather important in Environmental Impact Assessment of construction projects.The health protection zone is an essential factor in EIA.Taking a ammonia plant as example,the determination methods of health protection zone are studied.At the same time,determination methods of pollution source of uncontrollable discharge,intensity of pollution sources and parameter are discussed.
Keywords:uncontrollable discharg  health protection zone  Environmental Impact Assessment  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号