An Integrated Program to Achieve Maximum Performance of Electrostatic Precipitators |
| |
Authors: | Joseph Greco Robert O. Ezzell John H. Lytle |
| |
Affiliation: | Tennessee Valley Authority , USA |
| |
Abstract: | The objective of this paper is to describe the Tennessee Valley Authority's efforts and plans in designing an operating and maintenance program that will ensure maximum performance of the electrostatic precipitators at our power generating stations. Detailed operating and maintenance manuals are being prepared for each plant for the use of plant personnel. These manuals include instructions on operation, maintenance, and testing of the precipitators. Instructions on internal and external equipment inspections to be performed during unit operation, emergency and scheduled outages, and problem diagnostic procedures are included to help the plant personnel solve problem areas. Performance curves are included in the manuals which show the effect of gas volume flow, gas temperature, gas resistivity, coal changes, and loss of transformer-rectifier sets on the precipitator performance. In addition, opacity monitors that record continuous opacity readings are being installed at all our plants to assist the plant in monitoring precipitator performance. Full-time operating and maintenance crews are being organized at the plants to monitor and maintain the precipitator and ash-removal systems. Also, a staff of technical personnel is being organized at the central office to provide technical advice and assistance in design, operation, and maintenance problems and liaison and coordination for all the plants concerning the precipitators. Periodic precipitator field inspections, performance and operating parameter optimization testing, and review of the equipment operating logs are made by the central office technical personnel. Recommendations and technical assistance are then furnished to the plant with regard to the precipitator overall performance and operating characteristics. |
| |
Keywords: | |
|
|