Abstract: | ABSTRACT. The non-power requirements of a large hydro-power system of multiple-purpose projects often conflict with the best power peaking operation. In order to schedule an optimum multiple-purpose operation, advanced procedures that necessitate the use of computers are required. Special techniques are used in a computer program developed in the Reservoir Control Center, North Pacific Division of the Corps of Engineers that provide the ability to define operating constraints in order of priority. These techniques are easily adapted to practical reservoir regulation problems so that the program is useful in daily reservoir regulation scheduling. |