首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Economic analysis of biogas and compost projects in a palm oil mill with clean development mechanism in Malaysia
Authors:Tatsuya Yoshizaki  Yoshihito Shirai  Mohd Ali Hassan  Azhari Samsu Baharuddin  Nik Mustapha Raja Abdullah  Alawi Sulaiman  Zainuri Busu
Institution:1. Department of Biological Functions and Engineering, Graduate School of Life Science and System Engineering, Kyushu Institute of Technology, 2-4 Hibikino, Wakamatsu-ku, Kitakyushu, Fukuoka, 808-0196, Japan
2. Department of Bioprocess Technology, Faculty of Biotechnology and Biomolecular Sciences, Universiti Putra Malaysia, 43400, Serdang, Malaysia
3. Department of Process and Food Engineering, Faculty of Engineering, Universiti Putra Malaysia, 43400, Serdang, Malaysia
4. Faculty of Economics and Management, Universiti Putra Malaysia, 43400, Serdang, Malaysia
5. Faculty of Plantation and Agrotechnology, Universiti Teknologi MARA, Shah Alam, 40450, Serdang, Selangor, Malaysia
6. FELDA Palm Industries Sdn Bhd, Balai Felda, Jalan Gurney Satu, 50400, Kuala Lumpur, Malaysia
Abstract:This article is a case study to compare the economic viabilities of biogas generation and compost projects in a palm oil mill in Malaysia with and without clean development mechanism (CDM). Biogas is captured from anaerobic ponds or digester tanks treating palm oil mill effluent (POME) and converted to green renewable electricity for grid connection, while compost is produced from the shredded empty fruit bunch and raw untreated POME. The both technologies were compared by considering the changes of the materials flow and energy balances. A palm oil mill with a capacity of 54?t fresh fruit bunch per hour has the potential to produce either 6.9?GWh of electricity from biogas or fertilizer equivalent to 488?t of nitrogen, 76?t of phosphorus and 1,065?t of potassium per year. The economic analysis for 10?years project term analysis indicated that CDM gave a significant impact and ensured economic viability for both projects with 25?% of internal rate of return (IRR), RM 12.39 million of net present value (NPV) and 3.5?years of payback period (PBP) for biogas project, whereas 31?% of IRR, RM 10.87 million of NPV and 2.9?years of PBP for compost project, respectively. In addition, sensitivity analysis indicated that the profitability of both projects will vary depending on the economic situation, such as electricity price which is based on the government policy, whereas compost price that depend on fertilizer market price with 43?% NPV change in 20?% range of fertilizer value.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号