首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Challenges in performing technical safety reviews of modifications – A case study
Authors:Thomas Falk  Carl Rollenhagen  Björn Wahlström
Institution:1. Royal Institute of Technology, Stockholm, Sweden, Vattenfall Power Consultant AB, Stockholm, Sweden;2. Nordic Safety Management Institute, Stockholm, Sweden
Abstract:The aim of the present study, is to identify strengths and weaknesses of the technical safety review process at a Swedish Nuclear Power Plant (NPP). In this context, the function of safety reviews are understood as expert judgements on proposals for design modifications1 and redesign of technical systems (i.e. commercial nuclear reactors), supported by formalised safety review processes. The chosen methodology is using two complementary methods: interviews of personnel performing safety reviews, and analysis of safety review reports from 2005 to 2009.The study shows that personal integrity is a trademark of the review staff and there are sufficient support systems to ensure high quality. The partition between primary and independent review is positive, having different focus and staff with different skills and perspectives making the reviews, which implies supplementary roles. The process contributes to “getting the right things done the right way”. The study also shows that though efficient communication, feedback, processes for continuous improvement, and “learning organizations” are well known success factors in academia, it is not that simple to implement and accomplish in real life.It is argued that future applications of safety review processes should focus more on communicating and clarifying the process and its adherent requirements, and improve the feedback system within the process.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号