Urban Stream Rehabilitation: A Design and Construction Case Study
Authors:Scott Morris  Todd Moses
Institution:(1) Department of Geography University of Idaho Moscow, Idaho 83843, USA , US;(2) Watershed Applications, Ltd. 434 NW Sixth Avenue, Suite 305 Portland, Oregon 97209, USA , US
Abstract:/ This paper describes the fundamental design features, and construction methods and sequence, of a rehabilitation project on a small suburban creek in Moscow, Idaho, USA. A meandering channel pattern was reestablished for approximately 280 m of straightened, dredged channel, a new floodplain was excavated, and the new riparian zone was replanted. The new stream channel was sized to accommodate an estimated natural bankfull discharge ( approximately 5.6 cms), and floodplain design attempted to match the conveyance of the old enlarged channel (14-20 cms). The project was coordinated by a local nonprofit environmental organization, and the design and construction were tailored to donated materials and a largely volunteer labor force. A high-magnitude flood event (ca. 50-year recurrence interval) six months after construction had no significant impact on the newly constructed channel and revetments, but underscored the need for important detailing of the structures. The use of volunteer labor, while entailing certain benefits, complicates project planning and construction. The most general lesson learned from this project is that sponsoring agencies and clients need to be informed of the many steps and sequencing of properly constructed, complex stream rehabilitation projects as well as the high time and cost requirements for these tasks. KEY WORDS: Stream corridor restoration; Channel design; Streambank revetments
Keywords:: Stream corridor restoration  Channel design  Streambank revetments
本文献已被 PubMed SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号