摘    要:江宁开发区污水处理厂建设规模为4万m^3/d,分两期建成,采用氧化沟处理工艺,污泥处理采用不经消化的带式脱水工艺。在此主要叙述了各工艺构筑物的设备配置、功能、设计参数及二期工程的试运行情况。

关 键 词:污水处理厂  氧化沟  A^2/O工艺  调试
文章编号:1004-8642(2005)04-0019-02
收稿时间:2005-07-11
修稿时间:2005-07-11

Debugging and Operation of No.2 Project of Jiangning Development Zone Wastewater Treatment Plant
LIU Qin,Lü Xi-wu,WANG A-hua.Debugging and Operation of No.2 Project of Jiangning Development Zone Wastewater Treatment Plant[J].Jiangsu Environmental Science and Technology,2005,18(4):19-20,23.
Authors:LIU Qin  Lü Xi-wu  WANG A-hua
Abstract:Jiangning Development Zone Wastewater Treatment Plant with the scale of 40000 m^3/d will be built in two parts. Oxidation ditch was chosen as the basic process and excess sludge was disposed by belt dewatering machine without digestion. This paper mainly dealed with design parameters, equipments, constructions and debugging of this project.
Keywords:Wastewater treatment plant  Oxidation ditch  A^2/O process  Debugging