首页 | 本学科首页   官方微博 | 高级检索  
     检索      

电站运营对北溪下游水质影响探讨及改进建议
引用本文:陈建发,吴文炳,黄慧珍,方胜强.电站运营对北溪下游水质影响探讨及改进建议[J].环境科学与管理,2013(1):25-29.
作者姓名:陈建发  吴文炳  黄慧珍  方胜强
作者单位:漳州职业技术学院;漳州师范学院
基金项目:漳州职业技术学院与漳州市环境保护局科学研究资助项目(ZZY0801)
摘    要:文章通过对利水电站坝上、坝下布设监测断面,进行为期近一个月的枯水期水质监测,分析上下游水质的变化以期对梯级电站的建设与运营对北溪下游水质的影响进行研究,认为梯级电站的建设运行,形成梯级水库,流速变缓,大气覆氧能力降低,水中溶解氧下降,导致水体自净能力减弱,使水环境容量降低,对污染物的稀释、混合和降解能力减弱,湖库富营养化是水库的主要生态环境问题。为此,提出污染防治对策,并提出当上游污染水团下泄时,作为补救和改善水质时电站应采取的运行方式,为今后河流的突发污染防治、水质保护与改善提供经验借鉴。

关 键 词:梯级电站  建设运行  富营养化  防治对策  建议

Discussion and Suggestion on Impacts of Power Station on Water Quality at Downstream of North Brook of Zhangzhou Jiulongjiang River
Chen Jianfa,Wu Wenbing,Huang Huizhen,Fang Shengqiang.Discussion and Suggestion on Impacts of Power Station on Water Quality at Downstream of North Brook of Zhangzhou Jiulongjiang River[J].Environmental Science and Management,2013(1):25-29.
Authors:Chen Jianfa  Wu Wenbing  Huang Huizhen  Fang Shengqiang
Institution:1.Zhangzhou Institute of Technology,Zhangzhou 363000,China; 2.Zhangzhou Normal College,Zhangzhou 363000,China)
Abstract:Through monitoring on water quality at the upstream and downstream of the dam of Lishui power station for one month in dry season, this paper analyzed the water quality of downstream of Zhangzhou Jiulongjiang River. The building and oper- ation of cascade hydropower stations caused some problems such as cascade reservoirs, lower velocity of flow and lower dissolved oxygen. The self-purification ability and environmental capacity declined, while dilution, mixing, degradation abilities became weaker. Eutrophication became the main ecological problem in reservoir. This paper suggested operation measures for power sta- tion when the upstream pollution flow into downstream, it also gives some advises in sudden pollution, protection and water quality improvement.
Keywords:cascade hydropower stations  building and operation  eutrophication  strategy  suggestion
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号