首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Phosphorus Load Reduction Goals for Feitsui Reservoir Watershed, Taiwan
Authors:Wen-Shang Chou  Tsu-Chuan Lee  Jen-Yang Lin  Shaw L Yu
Institution:(1) Dept. of Civil Engineering and Water Environment Research Center, National Taipei Univ. of Technology, No. 1 Sec. 3 Chung-Hsiao E. Rd., Taipei, 106, Taiwan, Republic of China;(2) Dept. of Civil Engineering, Univ. of Virginia, Charlottesville, VA 22904, USA
Abstract:The present paper describes an effort for developing the total maximum daily load (TMDL) for phosphorus and a load reduction strategy for the Feitsui Reservoir in Northern Taiwan. BASINS model was employed to estimate watershed pollutant loads from nonpoint sources (NPS) in the Feitsui Reservoir watershed. The BASINS model was calibrated using field data collected during a 2-year sampling period and then used to compute watershed pollutant loadings into the Feitsui Reservoir. The simulated results indicate that the average annual total phosphorus (TP) loading into the reservoir is 18,910 kg/year, which consists of non-point source loading of 16,003 kg/year, and point source loading of 2,907 kg/year. The Vollenweider mass balance model was used next to determine the degree of eutrophication under current pollutant loading and the load reduction needed to keep the reservoir from being eutrophic. It was estimated that Feitsui Reservoir can becoming of the oligotrophic state if the average annual TP loading is reduced by 37% or more. The results provide the basis on which an integrated control action plan for both point and nonpoint sources of pollution in the watershed can be developed.
Keywords:TMDL  HSPF/BASINS model  Total phosphorus (TP)  BMPs  Settling velocity  Hydraulic residence time
本文献已被 PubMed SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号