首页 | 本学科首页   官方微博 | 高级检索  
     检索      

BP神经网络法预测唐山市需水量
引用本文:张雪飞,郭秀锐,程水源,王海燕.BP神经网络法预测唐山市需水量[J].安全与环境学报,2005,5(5):95-98.
作者姓名:张雪飞  郭秀锐  程水源  王海燕
作者单位:北京工业大学环境与能源工程学院,北京,100022;北京工业大学环境与能源工程学院,北京,100022;北京工业大学环境与能源工程学院,北京,100022;北京工业大学环境与能源工程学院,北京,100022
摘    要:需水量预测研究已成为当前水资源规划与管理研究中的重要课题之一.本文设定不同的神经网络运行次数,根据预测结果进行误差分析,BP神经网络在运行5 000次时,具有高度的可信度和可行性.应用5 000次运行次数的BP神经网络模型对唐山市规划水平年的需水量进行预测.最后引入人均综合用水量概念,结果表明,预测结果在理论上和实际上都具有可行性.

关 键 词:环境规划  BP神经网络  需水量预测  万元产值用水量  人均综合用水量
文章编号:1009-6094(2005)05-0095-04
收稿时间:2005-08-03
修稿时间:2005年8月3日

Prediction of urban water demand in Tangshan City with BP neutral network method
ZHANG Xue-fei,GUO Xiu-rui,CHENG Shui-yuan,WANG Hai-yan.Prediction of urban water demand in Tangshan City with BP neutral network method[J].Journal of Safety and Environment,2005,5(5):95-98.
Authors:ZHANG Xue-fei  GUO Xiu-rui  CHENG Shui-yuan  WANG Hai-yan
Abstract:The present paper aims to introduce the authors' research on the methods to predict the water demand of Tangshan area and the actual water resources planning and management for the time being.Once different neutral network operation times are chosen and the errors between the prediction data and the original data are analyzed,the paper has made a conclusion that BP neutral network is of high reliability and good feasibility under the 5 000 operation times.Then BP neutral network with 5 000 operation times can be applied to predict Tangshan urban water demand in the different future years.And,finally,the comprehensive water demand per capita is put forward,thus,the prediction results prove to be feasible both in theory and in practice.It should be pointed that the BP nentral network has its own advantages,such as higher reliability,better feasibility and veracity,and it can avoid successfully fussy calculation.But applying BP neutral network to predict urban water demand belongs to across subject,the function mechanism of connotative nerve cell and the choice of node number are very difficult,therefore,it will be further studied and discussed,especially how to ascertain connotative node number.
Keywords:environment planning  BP Neutral Network  water demand prediction  industrial water utilizing per 10000 yuan production  comprehensive water consumption per capita
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号