首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Uncertainties in a risk management context in early phases of offshore petroleum field development
Institution:1. Department of Mechanics and Maritime Sciences, Chalmers University of Technology, 412 96 Gothenburg, Sweden;2. Swedish Defence Research Agency, 164 90 Stockholm, Sweden;3. Department of Biological and Environmental Sciences, University of Gothenburg, Box 461, 405 30 Gothenburg, Sweden
Abstract:The current risk management approach for the Norwegian offshore petroleum industry came into effect in 2001 and has been stable with minor changes for 15 years. Relatively few new installations were slated for development until quite recently, and several new projects have been started in the last few years. The paper considers the risk management approach in the pre-FEED phase and builds on two case studies selected from the most recent cases. These case studies have been evaluated with respect to how uncertainties are considered in the early phase, based on the submission of the Plan for Development and Operation, their evaluations by authorities and the supporting documents. Both case studies involve new concepts for which there is no experience from similar environments and/or water depths. In spite of what could have been expected, the case studies conclude that uncertainties have not been in focus at all during concept development. This appears to be definitely the case for the licensees, but also to be the case for the authorities. Some suggestions are presented for what could have been considered by the licensees and authorities.
Keywords:Major hazard risk  Offshore installations  Pre-FEED phase  Uncertainty  ALARP"}  {"#name":"keyword"  "$":{"id":"kwrd0035"}  "$$":[{"#name":"text"  "_":"As Low As Reasonably Practicable  DNV GL"}  {"#name":"keyword"  "$":{"id":"kwrd0045"}  "$$":[{"#name":"text"  "_":"Det Norske Veritas – Germanischer Lloyd  EIA"}  {"#name":"keyword"  "$":{"id":"kwrd0055"}  "$$":[{"#name":"text"  "_":"Environmental Impact Assessment  EU"}  {"#name":"keyword"  "$":{"id":"kwrd0065"}  "$$":[{"#name":"text"  "_":"European Union  FAR"}  {"#name":"keyword"  "$":{"id":"kwrd0075"}  "$$":[{"#name":"text"  "_":"Fatal Accident Rate  FEED"}  {"#name":"keyword"  "$":{"id":"kwrd0085"}  "$$":[{"#name":"text"  "_":"Front End Engineering and Design  FPSO"}  {"#name":"keyword"  "$":{"id":"kwrd0095"}  "$$":[{"#name":"text"  "_":"Floating Production  Storage and Offloading [system]  HC"}  {"#name":"keyword"  "$":{"id":"kwrd0105"}  "$$":[{"#name":"text"  "_":"Hydrocarbon  HES"}  {"#name":"keyword"  "$":{"id":"kwrd0115"}  "$$":[{"#name":"text"  "_":"Health  Environment and Safety  HSE"}  {"#name":"keyword"  "$":{"id":"kwrd0125"}  "$$":[{"#name":"text"  "_":"Health and Safety Executive  NCS"}  {"#name":"keyword"  "$":{"id":"kwrd0135"}  "$$":[{"#name":"text"  "_":"Norwegian Continental Shelf  NOU"}  {"#name":"keyword"  "$":{"id":"kwrd0145"}  "$$":[{"#name":"text"  "_":"Norwegian Official Whitepaper  NPD"}  {"#name":"keyword"  "$":{"id":"kwrd0155"}  "$$":[{"#name":"text"  "_":"Norwegian Petroleum Directorate  PDO"}  {"#name":"keyword"  "$":{"id":"kwrd0165"}  "$$":[{"#name":"text"  "_":"Plan for Development and Operation  PRA"}  {"#name":"keyword"  "$":{"id":"kwrd0175"}  "$$":[{"#name":"text"  "_":"Probabilistic Risk Assessment  PSA"}  {"#name":"keyword"  "$":{"id":"kwrd0185"}  "$$":[{"#name":"text"  "_":"Petroleum Safety Authority [Norway]  QRA"}  {"#name":"keyword"  "$":{"id":"kwrd0195"}  "$$":[{"#name":"text"  "_":"Quantitative Risk Analysis
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号