急上高原人员疏散速度修正的台阶试验研究*
引用本文:崔鹏,王明年,于丽,段儒禹,李春荟,何佳银.急上高原人员疏散速度修正的台阶试验研究*[J].中国安全生产科学技术,2021,17(6):117-122.
作者姓名:崔鹏  王明年  于丽  段儒禹  李春荟  何佳银
作者单位:(1.西南交通大学 土木工程学院,四川 成都 610031;2.西南交通大学 交通隧道工程教育部重点实验室,四川 成都 610031;3.云南省交通规划设计研究院有限公司,云南 昆明 650041)
基金项目:* 基金项目: 国家铁路局项目(KF2019-017);中铁二院工程集团有限责任公司科研项目(科2019-070);中铁第一勘察设计院集团有限公司科研项目(院科(川藏)19-17-01);云交科教便项目(〔2019〕36号);中国铁路设计集团有限公司科技开发项目(2019YY120301-2)
摘    要:为解决高原铁路隧道人员安全疏散问题,基于台阶试验对急上高原人员运动能力进行研究,并基于现场测试、理论分析、资料调研等对不同海拔高度处急上高原人员疏散速度基础参数进行研究。结果表明:得出平原世居者在急上高原时的运动能力下降规律,并通过对比不同拟合类型,得出急上高原者在不同海拔下人员疏散速度折减系数公式;基于海拔和坡度对人员运动的影响,得出高海拔铁路隧道人员疏散速度基础参数。研究结果可为高海拔铁路隧道人员疏散理论分析、仿真模拟及性能化设计提供基础数据支持。

关 键 词:铁路隧道  急上高原  台阶试验  疏散速度

Bench test study on correction of evacuation speed for personnel rushing up plateau
CUI Peng,WANG Mingnian,YU Li,DUAN Ruyu,LI Chunhui,HE Jiayin.Bench test study on correction of evacuation speed for personnel rushing up plateau[J].Journal of Safety Science and Technology,2021,17(6):117-122.
Authors:CUI Peng  WANG Mingnian  YU Li  DUAN Ruyu  LI Chunhui  HE Jiayin
Institution:(1.School of Civil Engineering,Southwest Jiaotong University,Chengdu Sichuan 610031,China;2.Key Laboratory of Transportation Tunnel Engineering of Ministry of Education,Southwest Jiaotong University,Chengdu Sichuan 610031,China;3.Yunnan Institute of Transportation Planning and Design,Kunming Yunnan 650041,China)
Abstract:In order to solve the problem of safe personnel evacuation in the plateau railway tunnel,the movement ability of personnel rushing up the plateau was studied on the basis of bench test,and the basic parameters of evacuation speed of personnel rushing up the plateau at different altitudes were studied by using the field test,theoretical analysis,data investigation and other research methods.The results showed that the law about the decline of the movement ability of personnel living in the plain when they rushed up the plateau was proved,and the formula of the reduction coefficient of evacuation speed of personnel rushing up the plateau at different altitudes was obtained by comparing different fitting types.The basic parameters of personnel evacuation speed in the high-altitude railway tunnel were obtained based on the influence of altitude and slope on the movement of personnel.This study can provide basic data support for theoretical analysis,simulation and performance-based design of personnel evacuation in the high-altitude railway tunnels.
Keywords:railway tunnel  rushing up plateau  bench test  evacuation speed