摘    要:为了分析与掌握矩形顶管施工引起的地表沉降变形规律,提出基于MIDAS-GTS有限元软件的分析方法,首先,通过工程实例验证MIDAS-GTS有限元软件在分析顶管施工引起地表沉降变形的有效性;其次,通过影响因素的敏感性分析确定不同影响因素作用下的地表沉降变形特性,这些影响因素主要包括开挖面支护压力、侧摩阻力、地层结构特性等;最后,通过地表沉降变形特性分析得出矩形顶管的适用范围。研究结果表明:基于MIDAS-GTS有限元软件的地表沉降规律分析方法和结果,可为矩形顶管施工过程提供相关参考和借鉴。

关 键 词:矩形顶管  现场监测数据  数值模拟  地面沉降

Research on ground settlement caused by rectangular pipe jacking construction with earth pressure balance
LI Da,,KONG Heng,GUO Fei,WANG Yajian,LI Minghao,XU Youjun.Research on ground settlement caused by rectangular pipe jacking construction with earth pressure balance[J].Journal of Safety Science and Technology,2018,14(10):144-150.
Authors:LI Da    KONG Heng  GUO Fei  WANG Yajian  LI Minghao  XU Youjun
Institution:(1. College of Highways, Chang’an University, Xi’an Shaanxi 710064, China;2. Beijing Road Engineering Quality Supervision Station,Beijing 100076,China;3. Beijing Municipal Construction Co., Ltd., Beijing 100048, China;4. College of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou Inner Mongolia 014010, China)
Abstract:In order to analyze and master the ground settlement and deformation laws caused by the construction of rectangular pipe jacking, an analysis method based on the MIDAS-GTS finite element software was proposed. Firstly, the validity of analyzing the ground settlement and deformation caused by the construction of pipe jacking when using the MIDAS-GTS finite element software was verified through the practical engineering case. Secondly, the characteristics of ground settlement and deformation under the effect of different influencing factors were analyzed and determined through the sensitivity analysis of the influencing factors, which mainly included the support pressure of excavation face, side friction, strata structure features, etc. Finally, the application scope of rectangular pipe jacking was analyzed and obtained through the analysis on the characteristics of ground settlement and deformation. The results showed that the analysis method and results of ground settlement based on the MIDAS-GTS finite element software can provide the relevant reference for the construction process of rectangular pipe jacking.
Keywords:rectangular pipe jacking  on site monitoring data  numerical simulation  ground settlement
本文献已被 CNKI 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号