首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大断层采动“活化”导水特性研究
引用本文:张周鑫,刘启蒙,刘丽红,张丹丹,吴亚萍.大断层采动“活化”导水特性研究[J].中国安全生产科学技术,2014,10(7):44-48.
作者姓名:张周鑫  刘启蒙  刘丽红  张丹丹  吴亚萍
作者单位:(安徽理工大学 地球与环境学院,安徽 淮南 232001)
基金项目:国家自然科学基金项目(41201017);“十二五”科技支撑项目( SQ2012BAJY3504-01);安徽省教育厅自然科学研究项目(KJ2012Z088)
摘    要:煤层回采引起的断层“活化”导水是矿井突水的一种重要形式,具有很高的危险性和隐敝性。依托具体的工程背景,建立简化的力学模型和数值模型,根据弹塑性力学和裂隙介质水动力学理论分析不同推进距离时断层面上的主应力和法向应力变化情况,并通过模拟计算得出回采过程中应力变化与塑性破坏特征。研究结果表明,新集矿区F10大型断层在煤层推进至距断层20 m位置时开始有“活化”趋势,断层带岩体位移值陡增到005 m,距10 m时断层面主应力急剧增大,峰值应力向浅部转移,断层带发生明显位移,孔裂隙扩张。为保证生产安全,需预设30 m防水煤柱,避免煤岩体突水通道沟通主干断层及承压含水层,该研究成果可为矿井生产提供一定的参考价值。

关 键 词:断层“活化”导水  力学分析  数值计算  防水煤柱

Study on characteristics of activating to conduct water in large-scale fault under mining
ZHANG Zhou-xin,LIU Qi-meng,LIU Li-hong,ZHANG Dan-dan,WU Ya-ping.Study on characteristics of activating to conduct water in large-scale fault under mining[J].Journal of Safety Science and Technology,2014,10(7):44-48.
Authors:ZHANG Zhou-xin  LIU Qi-meng  LIU Li-hong  ZHANG Dan-dan  WU Ya-ping
Institution:(School of Earth and Environment, Anhui University of Science and Technology, Huainan Anhui 232001, China)
Abstract:ctivating to conduct water of fault is an important form of mine water inrush caused by coal mining,and has very high risk and concealment. A simplified mechanical and numerical model was built based on specific engi-neering background,the principal stress and normal stress of fault plane were analyzed by different mining step ac-cording to the theory of elastic-plastic mechanics and fissure medium hydrodynamics,and the characteristics of stress change and plastic failure in mining process were obtained by simulating calculation. The results showed that F10 large-scale fault in Xinji colliery had activity trends when excavating seam to 20 m from fault,and rock mass displacement value of fault zone sudden increased to 0. 05 m. When being 10 m from fault plane,the principal stress increased rapidly,the peak stress gradually transferred to the shallow part,and the fault zone had obvious displacement,pore and fissure expansion. In order to ensure the safety of production,30 m waterproof coal pillar should be preseted to avoid the water inrush connecting major fault and confined aquifer,and the results of the study can provide some reference value for mine production.
Keywords:activating to conduct water of fault  mechanics analysis  numerical calculation  waterproof pillar
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号