摘    要:采用“分质调节—混凝沉淀—厌氧水解—缺氧生物处理—好氧生物处理”工艺处理某化工园区以氟化工和精细化工废水为主的工业废水。工程运行结果表明:废水经处理后,COD=35 mg/L,TN=5.2 mg/L,ρ(NH3-N)=3.1 mg/L,TP=0.15 mg/L;COD,TN,NH3-N,TP的去除率分别为91.1%,67.1%,70.5%,89.3%;出水达到DB 32/T1072—2007《太湖地区城镇污水处理厂及重点工业行业主要水污染物排放限值》中的排放标准。工程设计规模1.0×104 m3/d,工程总投资约5 000 万元,直接运行费用1.50 元/m3。每年减少COD,TN,NH3-N,TP的排放量分别约为1 324.6,38.69,11.05,4.56 t。该工程的实施明显改善了区域水环境,为太湖流域污染的治理提供了技术支撑。

关 键 词:化学工业园  化工废水处理  厌氧水解  脱氮  除磷  
收稿时间:2013-11-08

Project Design Example for Chemical Industry Park Wastewater Treatment
Xu Ming,Liu Weijing,Tu Yong,Cai Weimin,Jiang Yongwei,Wu Wei.Project Design Example for Chemical Industry Park Wastewater Treatment[J].Environmental Protection of Chemical Industry,2014,35(3):245-249.
Authors:Xu Ming  Liu Weijing  Tu Yong  Cai Weimin  Jiang Yongwei  Wu Wei
Institution:1. Jiangsu Academy of Environmental Science,Nanjing Jiangsu 210036,China;2. Jiangsu Key Laboratory of Environmental Engineering,Nanjing Jiangsu 210036,China;3. Jiangsu Environmental Engineering Consulting Center,Nanjing Jiangsu 210036,China;4. Administrative Committee of Jiangsu Changshu Advanced Materials Industrial Park,Changshu Jiangsu 215522,China
Abstract:The industrial wastewater in a chemical industry park,mainly generated in fluorine chemical and fine chemical processes,was treated by the process of separate adjustment- coagulative precipitation-anaerobic hydrolysis-anoxic biotreatment-aerobic biotreatment. The running results show that:The COD,TN,ρ(NH3-N) ,TP of the effluent are 35,5.2,3.1,0.15 mg/L with 91.1%,67.1%,70.5%,89.3% of removal rates respectively;The effluent quality can meet the Taihu lake region discharge standards of DB 32/1072-2007. The designed capacity of the project is 1.0×104 m3/d,the investment is about 50 million yuan,and the direct operation cost is 1.50 yuan/m3. The annual discharge amounts of COD,TN,NH3-N,TP are decreased by 1 324.6,38.69,11.05,4.56 t respectively. The project has significantly improved the regional water environment and provided a technical support to the pollution control of Taihu lake basin.
Keywords:chemical industry park  chemical wastewater treatment  anaerobic hydrolysis  denitrification  dephosphorylation  