现有燃煤电厂二氧化硫治理“十一五”规划研究
引用本文:王志轩,潘 荔,赵鹏高,石丽娜.现有燃煤电厂二氧化硫治理“十一五”规划研究[J].环境科学研究,2007,20(3):142-147.
作者姓名:王志轩  潘 荔  赵鹏高  石丽娜
作者单位:1.中国电力企业联合会 行业发展与环境资源部,北京 100761
摘    要:结合《现有燃煤电厂二氧化硫治理“十一五”规划》的编制背景,根据《国民经济和社会发展第十一个五年规划纲要》及相关法规、政策、标准等,重点分析了达标排放率、排放总量、排放绩效、脱硫机组容量等主要目标的选择及目标值的确定方法,并对“十一五”末全国电力二氧化硫排放量以及脱硫机组容量进行了预测.预计到2010年,全国电力二氧化硫排放总量将达到862×104 t,比2005年减少33.7%;全国烟气脱硫机组投运及在建容量将达到3.8×108 kW,占“十一五”末煤电装机总量的64.0%;全国燃煤电厂二氧化硫排放绩效指标由2005年的6.4 g/(kW·h)下降到2.7 g/(kW·h).同时进行了“十一五”现有燃煤电厂二氧化硫治理的投资分析与风险分析.提出通过完善二氧化硫总量控制制度,强化政策引导,加快脱硫产业化发展,充分发挥政府、行业组织和企业的作用确保目标的实现. 

关 键 词:燃煤    电厂    二氧化硫    治理    十一五    规划
文章编号:1001-6929(2007)03-0142-06
修稿时间:2007-03-25

Research on the 11th Five-Year Plan for SO2 Pollution Control of Existing Coal-Fired Power Plants
WANG Zhi-xuan,PAN Li,ZHAO Peng-gao and SHI Li-na.Research on the 11th Five-Year Plan for SO2 Pollution Control of Existing Coal-Fired Power Plants[J].Research of Environmental Sciences,2007,20(3):142-147.
Authors:WANG Zhi-xuan  PAN Li  ZHAO Peng-gao and SHI Li-na
Institution:1.Department of Industry Development & Environment and Resources, China Electricity Council, Beijing 100761, China2.Department of Resource Conservation and Environmental Protection, National Development and Reform Commission, Beijing 100824, China
Abstract:In combination with the background of the 11th Five_Year Plan for SO2 pollution Control of Existing Coal-Fired Power Plants, and based on the draft Outline of the 11th Five-Year Plan for National Economic and Social Development and related regulations, policies and standards, the selection and determination method of the main targets, such as the up-to-standard emission rate, the totalemission, the emission performance standard (EPS) and the flue gas desulfurization (FGD)capacity, etc., were analyzed. In addition, the SO2 emission and the FGD capacity of electricity industry in China by the end of the 11th Five_year were forecasted. It was forecasted that by 2010, the total emission of SO2 from national electricity industry would decrease to 862×104 t, dropping by 33.7% as compared with the level of 2005; the FGD capacity putting into operation or under construction would reach 3.8×108 kW, accounting for 64.0% ofthe total capacity of national coal-fired generator at 2010; the EPS would drop to 2.7 g/(kW·h), comparing with 6.4 g/(kW·h) at 2005. Subsequently, the investment and the risk about the SO2 pollution control of existing coal-fired power plants were analyzed. Suggestions were put forward that it is necessary to improve the system of total emission control of SO2, intensify policyguidance, expedite development of the FGD industrialization and make full use of government, organization and corporation, in order to guarantee the realization of the targets.
Keywords:coal-fired  power plants  SO2  control  llth Five-Year  Plan
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《环境科学研究》浏览原始摘要信息