首页 | 本学科首页   官方微博 | 高级检索  
     检索      

我国曝气塘水力停留时间和比功率选用范围分析
引用本文:吴,卓.我国曝气塘水力停留时间和比功率选用范围分析[J].环境科学研究,1997,10(4):25-27.
作者姓名:  
作者单位:中国环境科学研究院水所,北京 100012
基金项目:“八五”国家科技攻关成果
摘    要:在总结和分析国外曝气塘水力停留时间和比功率选用状况的基础上,阐述了盲目应用国外曝气塘有关设计参数进行我国曝气塘设计可能出现的问题,并计算和提出了我国曝气塘设计水力停留时间和比功率的选用范围。 

关 键 词:曝气塘    水力停留时间    比功率    范围    设计
收稿时间:1996/3/28 0:00:00

The Range of Hydraulic Retention Time and Specific Power of Aerated Ponds in Our Country
WU Zhuo.The Range of Hydraulic Retention Time and Specific Power of Aerated Ponds in Our Country[J].Research of Environmental Sciences,1997,10(4):25-27.
Authors:WU Zhuo
Institution:Chinese Research Academy of Environmental Sciences, Beijing 100012
Abstract:On the base of summary and analysis of status of selection and application of hydraulic retention time and specific power of foreign aerated pond, this paper describes the problems which may occur when foreign relevant parameters are blindly used in the design of domestic aerated ponds. Moreover, the range of hydraulic retention time and specific power is calculated and presented for domestic aerated ponds.
Keywords:Aerated pond  Hydraulic retention time  Specific power  Range  Design  
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《环境科学研究》浏览原始摘要信息
点击此处可从《环境科学研究》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号