首页 | 本学科首页   官方微博 | 高级检索  
     检索      


ADJUSTMENT OF STREAM CHANNEL CAPACITY FOLLOWING DAM CLOSURE,YEGUA CREEK,TEXAS1
Authors:Anne Chin  Daniel L Harris  Todd H Trice  Jeffrey L Given
Abstract:ABSTRACT: In Yegua Creek, a principal tributary of the Brazos River in Texas, surveys of a 19 km channel reach downstream of Somerville Dam show that channel capacity decreased by an average of 65 percent in a 34 year period following dam closure. The decrease corresponds with an approximately 85 percent reduction in annual flood peaks. Channel depth has changed the most, decreasing by an average of 61 percent. Channel width remained stable with an average decrease of only 9 percent, reflecting cohesive bank materials along with the growth of riparian vegetation resulting from increased low flows during dry summer months. Although large changes in stream channel geometry are not uncommon downstream of dams, such pronounced reductions in channel capacity could have long‐term implications for sediment delivery through the system.
Keywords:stream channel adjustment  surface water hydrology  watershed management  flow regulation  impact of dams  fluvial geomorphology)
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号