华东电网超超临界CDM项目CO2减排量研究
引用本文:李亚春,王圣.华东电网超超临界CDM项目CO2减排量研究[J].中国环保产业,2009(8):15-18.
作者姓名:李亚春  王圣
作者单位:国电环境保护研究院,南京,210031
摘    要:介绍了燃煤电厂超超临界CDM类型项目CO2减排量的理论计算过程,说明各参数的取值方法,并结合华东电网超超临界CDM项目案例给予演示,最后就减排问题对CDM项目的开发提出了建议。

关 键 词:超超临界燃煤发电工程  CDM  CO2减排量  基准线  收益

Analysis and Practice of CO2 Emission Reduction from Ultra-supercritical Power CDM Projects within East China Grid
LI Ya-chun,WANG Sheng.Analysis and Practice of CO2 Emission Reduction from Ultra-supercritical Power CDM Projects within East China Grid[J].China Environmental Protection Industry,2009(8):15-18.
Authors:LI Ya-chun  WANG Sheng
Institution:(State Power of Institute Environmental Protection. Naniing 210031. China)
Abstract:For the coal-fired ultra-supercritical power CDM projects, theoretical calculation course of CO2 emission reduction is presented in this paper with detailed value adoption for each parameter. The CO2 emission reduction calculation is demonstrated by CDM project practices within East China Grid. Some inspiration and suggestions gotten from the CO2emission reduction calculation are given finally.
Keywords:CDM