产业园区规划环评工作亟须解决的若干问题及对策建议
引用本文:刘磊,张敏,韩力强,郑雯.产业园区规划环评工作亟须解决的若干问题及对策建议[J].中国环境管理,2020,12(6):47-51.
作者姓名:刘磊  张敏  韩力强  郑雯
作者单位:生态环境部环境工程评估中心, 北京 100012;生态环境部对外合作中心, 北京 100035
基金项目:生态环境部财政项目“环评制度建设与技术支持”(2110107)。
摘    要:本文从应开展规划环境影响评价工作的产业园区类型和规划类型、园区扩区后的规划环评范围、规划环评审查主体和审查权限、规划环评主体责任,以及规划环评与“三线一单”和项目环评联动等方面,系统梳理了当前园区规划环评实际工作中面临的问题和困惑,并分析了这些问题和对园区规划环评工作造成的影响。结合当前规划环评面临的形势和要求,针对当前规划环评管理存在的问题,从管理要求、技术要求和衔接要求等方面逐一提出了相关的对策建议。为推进解决当前规划环评工作面临的主要问题,提出了做实园区规划和规划环评工作、细化园区规划环评相关要求、动态调整“三线一单”成果三个方面的建议。

关 键 词:产业园区  规划环评  主要问题  对策建议

Problems to Be Solved and Suggestions in Planning EIA of Industrial Park
LIU Lei,ZHANG Min,HAN Liqiang,ZHENG Wen.Problems to Be Solved and Suggestions in Planning EIA of Industrial Park[J].Chinese Journal of Environmental Management,2020,12(6):47-51.
Authors:LIU Lei  ZHANG Min  HAN Liqiang  ZHENG Wen
Institution:Appraisal Center for Environment & Engineering, Ministry of Ecology and Environment, Beijing 100012, China;Foreign Environmental Cooperation Center, Ministry of Ecology and Environment, Beijing 100035, China
Abstract:The problems and perplexities that faced by the current industrial park planning EIA were analyzed in this paper, from the aspects of park type and planning type, planning EIA scope after expansion, EIA review subject and review authority, main responsibility of planning EIA, linkage of planning EIA with "Three Lines and One List" and project EIA. And then the impacts on the environmental impact assessment of the park planning were analyzed. Combined with the current situation and requirements of planning EIA, aiming at the problems existing in the current planning EIA management, the relevant countermeasures and suggestions were put forward from the aspects of management requirements, technical requirements and connection requirements. In order to promote the solution of main problems in the current planning EIA work, suggestions were put forward from three aspects, i.e. implementing the park planning and planning EIA work, refining the relevant requirements of the park planning EIA, and dynamically adjusting the "Three Lines and One List" results.
Keywords:industrial park  planning EIA  main problems  countermeasure and suggestion