首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
    
ABSTRACT: The pebble count, a quick and simple technique for characterizing streambed materials, has long been used by geomorphologists, hydrologists, and river engineers. This paper describes how pebble counts have been used to monitor fine sediment (particles less then 6 mm in size) on the Boise National Forest. Data from two watersheds subjected to major wildfires and the failure of a dam are discussed. Following wildfires, pebble count data showed increases in streambed fines followed by improvement of the stream substrate with time as the watersheds recovered. For the dam failure, pebble count data showed an increase in fines in the stream below the failure and were used to track the distance of sediment movement downstream. Pebble counts may be best used where fine sediment on channel substrates are a concern, such as in granitic watersheds where coarse sands are a large component of bedload and land-disturbing activities introduce fine sediment into streams. Pebble counts are found to be a simple and rapid monitoring method that can be used to help determine whether or not land management activities or land disturbances are introducing fine sediment into streams.  相似文献   

2.
    
ABSTRACT: Riffles in moderately entrenched stream reaches with gradients of 2 percent to 4 percent that have received excessive sediment from upstream have a distinctly different and higher proportion of smaller mobile particles than riffles in systems that are in dynamic equilibrium. The mobile fraction on the riffle can be estimated by comparing the relative abundance of various particle sizes present on the riffle with the dominant large particles on an adjacent bar. Riffle particles smaller than the dominant large particles on the bar are interpreted as mobile. The mobile percentile of particles on the riffle is termed “Riffle Stability Index” (RSI) and provides a useful estimate of the degree of increased sediment supply to riffles in mountain streams. The RSI addresses situations in which increases in gravel bedload from headwaters activities is depositing material on riffles and filling pools, and it reflects qualitative differences between reference and managed watersheds. The RSI correlates well with other measures of stream channel physical condition, such as V and the results of fish habitat surveys. Thus, it can be used as an indicator of stream reach and watershed condition and also of aquatic habitat quality.  相似文献   

3.
Turner, Andy W., Jeff J. Hillis, and Charles F. Rabeni, 2012. A Sampler for Measuring Deposited Fine Sediments in Streams. Journal of the American Water Resources Association (JAWRA) 48(2): 366‐378. DOI: 10.1111/j.1752‐1688.2011.00618.x Abstract: Improvements and standardization of methodologies to quickly and accurately quantify deposited sediment in streams will allow advances in our understanding of biological effects of sedimentation. Most methods used to evaluate streambed conditions as part of biological monitoring or assessment programs are selected for ease of use, but can be subjective, inappropriate, and often of unknown accuracy. We developed a portable, light‐weight device to quantify deposited unconsolidated sediment (particles <2 mm) in wadeable streams. This deposited sediment sampler is a hand‐held unit that circumscribes an area of the streambed and through suction creates a force that suspends unconsolidated materials into a collector. Laboratory evaluations determined the efficiency (percent of available deposited sediment recovered) of the sampler to collect different sizes and concentrations of deposited sediment under differing streambed conditions, which allowed appropriate correction factors to be applied to each of four categories of streambed particle size. Field trials comparing our sampler to other methods commonly used by many state and federal agencies showed high comparability. The sampler can be constructed in just a few hours from inexpensive, easily obtained materials.  相似文献   

4.
    
This paper recounts our predictions of channel evolution of the Black Vermillion River (BVR) and sediment yields associated with the evolutionary sequence. Channel design parameters allowed for the prediction of stable channel form and coincident sediment yields. Measured erosion rates and basin‐specific bank erosion curves aided in prediction of the stream channel succession time frame. This understanding is critical in determining how and when to mitigate a myriad of instability consequences. The BVR drains approximately 1,062 km2 in the glaciated region of Northeast Kansas. Once tallgrass prairie, the basin has been modified extensively for agricultural production. As such, channelization has shortened the river by nearly 26 km from pre‐European dimensions; shortening combined with the construction of numerous flow‐through structures have produced dramatic impacts on discharge and sediment dynamics. Nine stream reaches were established within three main tributaries of the BVR in 2007. Reaches averaged 490 m in length, were surveyed, and assessed for channel stability, while resurveys were conducted annually through 2010 to monitor change. This work illustrates the association of current stream state, in‐channel sediment contributions, and prediction of future erosion rates based on stream evolution informed by multiple models. Our findings suggest greater and more rapid sedimentation of a federal reservoir than has been predicted using standard sediment prediction methods.  相似文献   

5.
ABSTRACT: Sediment losses and water yields were measured for five years on nine forested watersheds in the Gulf Coastal Plain of Arkansas. After one year of pretreatment measurements, three watersheds were clearcut and mechanically site prepared, three were selectively harvested, and three control watersheds were left undisturbed. Sediment losses and water yields were similar for the selectively harvested and cohtrol watersheds during all four post-treatment years. However, clearcutting with mechanical site preparation significantly increased sediment losses and water yields above levels measured on other watersheds. Increased sediment losses persisted for two years, while water yields increased for one year. Although sediment losses from clear-cutting were greater than for other treatments, actual losses averaged only 264 kg/ha and 63 kg/ha for the first and second post-treatment years, respectively. The relatively low sediment losses are attributed to the flat terrain and the relatively low flow discharge rates that typify these sites.  相似文献   

6.
    
ABSTRACT: The magnitudes and patterns of sediment resuspension are assessed in Cannonsville Reservoir, New York, to quantify and characterize this internal source of sediment. The assessment is based on analyses of sediment trap collections from 10 sites over the spring to fall interval of two years. Temporal and spatial patterns in sediment deposition are demonstrated to be driven by resuspension/redeposition processes. Sediment that had been resuspended and redeposited represented 80 to 96 percent, on average, of the depositing solids collected along the main axis of the lake. About 90 percent of the redeposited sediment was inorganic. Increased resuspension caused by drawdown of the reservoir surface and fall turnover resulted in 10 to 50‐fold increases in deposition rates compared to levels observed when the reservoir was full and strongly thermally stratified. Elevated levels of redeposition from resuspension in the reservoir have been driven by both higher water column concentrations of suspended solids and settling velocities. Recurring longitudinal and lateral gradients in resuspension are delineated, establishing that resuspended solids are transported from the riverine to the lacustrine zone and from near‐shore to pelagic areas. Resuspension is demonstrated to cause increases in inanimate particle (tripton) concentrations. Higher tripton levels have been observed in years with greater drawdown. Water quality impacts of the resuspension phenomenon are considered.  相似文献   

7.
Abstract: A study was conducted between September 2003 and September 2006 to obtain baseline sediment inventories and monitor sediment transport and storage along a 3.7 km length of the channel of Valley Creek within Valley Forge National Historical Park, Pennsylvania. Valley Creek is a tributary of the Schuylkill River and drains an urbanizing 60.6 km2 watershed that currently has 18% impervious land cover. Numerous field methods were employed to measure the suspended sediment yield, longitudinal profile, cross‐sections, banklines, and particle size distribution of the streambed. Suspended sediment yield for the watershed was measured at a USGS gage located just upstream of the park boundary between July 2004 and July 2005, the period corresponding to field surveys of bank erosion and channel change. The estimated suspended sediment yield of 95.7 t/km2/year is representative of a year with unusually high discharge, including a storm event that produced a peak of 78 m3/s, the second highest discharge on record for the USGS gage. Based on the median annual streamflow for the 24 years of record at the USGS gage from 1983 to 2006, the median annual sediment yield is estimated to be closer to 34 t/km2/year, considerably lower than median and mean values for other sites within the region. The mass of silt, clay, and fine sand derived from bank erosion along the 3.7 km study reach during the field survey period accounts for an estimated 2,340 t, equivalent to about 43% of the suspended sediment load. The mass of fine sediment stored in the bed along the study reach was estimated at 1,500 t, with about 330 t of net erosion during the study period. Although bank erosion appears to be a potentially dominant source of sediment by comparison with annual suspended sediment load, bed sediment storage and potential for remobilization is of the same order of magnitude as the mass of sediment derived from bank erosion.  相似文献   

8.
ABSTRACT: Following major floods in 1990 which resulted in widespread bank erosion in southern British Columbia, four streams typical of the region were evaluated for the effect which riparian vegetation played in reducing erosion. A total of 748 bends in the four stream reaches were assessed by comparing pre- and post-flood aerial photography. Bends without riparian vegetation were found to be nearly five times as likely as vegetated bends to have undergone detectable erosion during the flood events. Major bank erosion was 30 times more prevalent on non-vegetated bends as on vegetated bends. The likelihood of erosion on semi-vegetated bends was between that of the vegetated and non-vegetated categories of bends.  相似文献   

9.
    
ABSTRACT: An intensive water quality investigation was conducted in western North Carolina to determine whether water quality problems existed from point and nonpoint source inputs of sediment from surface mining activities. Depth integrated measurements of sediment transport and biological sampling of benthic communities indicated that very serious water quality problems were caused by erosion from a concentrated area of open pit mining for mica, kaolin, and feldspar. The erosion occurred on haul roads, active mines, inactive mines, and tailings disposal piles. The need for using specific “Best Management Practices” for erosion control on the mining operation is discussed. These practices need to be implemented to restore populations of trout to the degraded reaches of the river. Additional monitoring data are presented that indicate that the biological integrity of surface waters can be preserved in the vicinity of point source mining discharges when the operators utilize proper practices in settling and neutralizing their effluent. While much has been done to abate the point source discharges, attention now needs to be focused on the nonpoint sources of sediment from mining operations.  相似文献   

10.
ABSTRACT: The Buffalo River is a tributary to the Mississippi River in west-central Wisconsin that drains a watershed dominated by agricultural land uses. Since 1935, backwater from Lock and Dam 4 on the Mississippi River has inundated the mouth of the Buffalo's valley. Resurveys of a transect first surveyed across the lake in 1935 and cesium-137 dating of backwater sediments reveal that sedimentation rates at the Buffalo's mouth have remained unchanged since the mid-1940s. Study results indicate that sediment yields from the watershed have persisted at relatively high levels over a period of several decades despite pronounced trends toward less cultivated land and major efforts to control soil erosion from agricultural land. The maintenance of sediment yields is probably due to increased channel conveyance capacities resulting from incision along some tributary streams since the early 1950s. Post-1950 incision extended the network of historical incised tributary channels, enhancing the efficient delivery of sediment from upland sources to downstream sites.  相似文献   

11.
    
A robotic water quality monitoring network is used to resolve the coupled patterns of a natural tracer, specific conductance (SC), and metrics of light scattering and turbidity for Schoharie Creek and downstream Schoharie Reservoir, with particular emphasis on the impacts of runoff events. Strong relationships between these parameters and streamflow, and the propensity for this tributary to plunge in the reservoir in summer and fall based on its lower temperature, are reported. The entry of this stream, the primary tributary, into the reservoir as a turbid density current during runoff events is depicted as distinct and vertically coincident subsurface SC minima and peaks in measures of light scattering. The magnitudes of these signatures imparted to the reservoir's water column are demonstrated to be strongly dependent on the magnitude of the runoff event. The time course of the diminishment of these signatures and longitudinal differences in turbidity within the reservoir are described. The documented patterns of SC and metrics of light scattering provided by the robotic monitoring network offer a rare opportunity to support development and testing of a turbidity model with the necessary attributes of fine temporal and spatial resolution.  相似文献   

12.
    
ABSTRACT: Incised channels are caused by an imbalance between sediment transport capacity and sediment supply that alters channel morphology through bed and bank erosion. Consistent sequential changes in incised channel morphology may be quantified and used to develop relationships describing quasi‐equilibrium conditions in these channels. We analyzed the hydraulic characteristics of streams in the Yazoo River Basin, Mississippi in various stages of incised channel evolution. The hydraulic characteristics of incising channels were observed to follow the sequence predicted by previous conceptual models of incised channel response. Multiple regression models of stable slopes in quasi‐equilibrium channels that have completed a full evolutionary sequence were developed. These models compare favorably with analytical solutions based on the extremal hypothesis of minimum stream power and empirical relationships from other regions. Appropriate application of these empirical relationships may be useful in preliminary design of stream rehabilitation strategies.  相似文献   

13.
    
ABSTRACT: Incised channels are caused by an imbalance between sediment transport capacity and sediment supply to the stream. The resulting bed and bank erosion alter channel morphology and stability. Geomorphological models of incised channel evolution can provide guidance in the selection of engineering design alternatives for incised channel rehabilitation. This paper describes how incised channel evolution models may be coupled with a dimensionless stability diagram to facilitate evaluation of rehabilitation alternatives. In combination, the models provide complementary views of channel processes from geomorphic and engineering perspectives.  相似文献   

14.
    
ABSTRACT: An informal sample of 30 flawed monitoring projects was examined to identify the most common problems and to determine how they could have been prevented. Problems fall into two general categories: 70 percent of the sampled projects had design problems, and 50 percent of the sampled projects had procedural problems. Monitoring projects implemented by land‐management agencies tended to have a higher proportion of procedural problems than did university‐based programs (generally graduate student research), while the frequency of design problems was similar between agencies and universities. The most common problems were poorly trained or unmotivated field crews (37 percent of projects, a procedural problem), a sampling plan that was not capable of measuring what was needed to meet project objectives (30 percent, design), delays in analyzing data (27 percent, procedure), inadequate monitoring durations (27 percent, design), and absence of the collateral information needed to interpret results (20 percent, procedure). Most of the problems could have been avoided by submission of the study design to thorough technical and statistical review, active participation of the principal investigators in field data collection, and analysis of at least some of the data as soon as information was collected so that problems could be recognized early enough to be corrected.  相似文献   

15.
ABSTRACT: A new method has been developed for estimating future reservoir storage capacities, allowing for sediment deposition and compaction. Reservoir sedimentation surveys for 117 reservoirs, conducted by the Illinois State Water Survey over the past 60 years, were used to determine regional constants K to represent the severity of sediment deposition in the reservoirs. More than half of the 82 water supply reservoirs investigated had records of reservoir sedimentation surveys, and their K values were calculated by using data from those sediment surveys. The average K values of the remaining non-surveyed water supply reservoirs were estimated from the regional distribution of the K values. Other important factors considered in the estimation of future reservoir storage capacities are the trap efficiency of the reservoirs and the variation of density of sediment deposits due to compaction. The model can also be used for analyzing the economics of alternative sites and of design features that can be incorporated in dams for reducing reservoir sedimentation.  相似文献   

16.
Bedload transport was measured with two sampler types (vortex tube and Helley-Smith pressure differential) for three major storms at Flynn Creek, which drains a 2.2-km2 forested watershed in the Oregon Coast Range. The largest flow during two winters of monitoring had a peak discharge of 0.79 m3 s-1 km-2, with an associated recurrence interval of ? 1.3 yr. The median particle diameter of sediment in transport was generally < 1 mm. The vortex tube and its associated sample box were relatively inefficient at trapping particles < 10 mm in diameter; however, even after transport rates were adjusted to account for sampling deficiencies of the sample box, they still averaged 42–47 percent of those obtained with the Helley-Smith sampler. Organic matter and sand sized sediments in transport also were observed to partially plug the 0.2-mm-mesh bag of the Helley-Smith sampler. Large temporal variability in bedload transport rates was measured during periods of high flow.  相似文献   

17.
ABSTRACT: Forest management activities in a second order drainage basin increased suspended sediment yields 7.7 fold in the first year following road construction, and two-fold following logging in the second year. Sediment supply limitations resulted in poor correlations between sediment concentrations with discharge. Sediment transport was strongly hysteretic, with the highest sediment concentrations occurring on the rising limbs of snowmelt hydrographs and individual peaks. In addition to discharge, hydrograph characteristics such as limb, dQ/dt, and the product of dQ/dt and limb aided in explaining variability of observed sediment concentrations. Sediment-turbidity relationships were strongly discharge dependent, reflecting the changing composition of the suspended load with stream power and sediment supplies.  相似文献   

18.
    
Environmental and economic damages caused by agricultural nonpoint source inputs of sediment and associated pollutants are examined. Widespread water quality problems are identified in lakes, rivers, and estuaries in agricultural areas, and billions of dollars of on-site and offsite costs result from this eroded soil every year. Some water bodies have been irretrievably damaged, and expensive rehabilitation programs are needed to remedy in-place water pollution problems if Clean Water Act goals are to be achieved. Unless effective abatement and rehabilitation programs are established, billions of dollars of benefits to future generations will not be realized as more waters become irretrievably damaged, and billions more will continue to be spent by government to treat symptoms of these sediment-related problems.  相似文献   

19.
ABSTRACT A flume study was conducted to examine (1)changes in the particle-size distribution of sediments in riffles due to the proportion of sand in transport and the total rate of bedload transport at the time the riffle is deposited and (2) the effect of high sand transport rates on the stability of gravel riffles. The median particle size of sediment deposited in the riffle was larger than that of the sediment in transport. Small but significant (a = 0.05) decreases in the median particle size of riffle sediments resulted as the sand-to-gravel ratio. Increased concentrations of sand in transport caused previously stable gravel riffles to undergo scour. These results, in combination with information from other studies, suggest that an alluvial channel with pool-riffle sequences and with sand and gravel beds may respond to an increased delivery of sand by reducing form roughness. Form roughness can be reduced by degrading riffles and filling pools. Subsequent responses may be increases in width-to-depth ratio and slope.  相似文献   

20.
ABSTRACT: Variability in bedload-transport rates during constant water discharge is an inherent part of the bedload-transport process. Although this variability has been measured extensively in the laboratory, similar information generally is not available from field measurements. During a four-day period of nearly constant water discharge, four sets of consecutively collected bedload samples, ranging from 43 to 120 samples, were obtained at the same cross channel location using a standard 65-pound Helley-Smith bedload sampler. When the measured transport rates are converted to dimensionless rates and plotted as cumulative frequency distributions, they show good agreement with a theoretical probability distribution function of rates derived for the case of ripples on dunes. The distributions show that during constant water discharge individual measured rates at a fixed point vary from near zero to four times the mean rate, and 60 percent of the sampled rates will be less than the mean. Because of the large variation in transport rates that occurs at every location in the cross section, many observations are required to establish an accurate estimate of the mean rate at any given location.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号